TGn Overview Portland, Oregon, US July 2004

Slides:



Advertisements
Similar presentations
Doc.: IEEE /661r1 Submission November 2002 Ziv Belsky, WavionSlide 1 Proposal for the 5 criteria for the HT SG.
Advertisements

Doc.: IEEE /222r4 Submission March 2003 Bruce Kraemer, Intersil; Colin Lanzl, Aware; Sean Coffey, TISlide 1 Proposed wording revisions to HT PAR.
Doc.: IEEE /1510r0 Submission November 2014 Edward Au (Marvell Semiconductor)Slide 1 Summary of PAR and CSD Discussion Date: Authors:
Doc.: IEEE /222r3 Submission March 2003 Bruce Kraemer, Intersil; Colin Lanzl, Aware; Sean Coffey, TISlide 1 Proposed wording revisions to HT PAR.
Doc.: IEEE hew Submission Sep 2013 Slide 1 PAR and 5C: Comments and some draft text based on n Date: Authors:
Doc.: IEEE /468r1 Submission July 2002 Bruce Kraemer, IntersilSlide 1 WNG Committee Report Vancouver, BC July 2002.
Doc.: IEEE /0498r0 Submission April 2008 Eldad Perahia, Intel CorporationSlide 1 Modifications to the 60GHz PAR & 5 C’s Proposal Date:
Doc.: IEEE / Submission March 2004 Larry Taylor (Staccato)Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE / Submission July, 2004 Jason Ellis, Staccato CommunicationsSlide 1 Project: IEEE P Working Group for Wireless Personal.
Doc.: IEEE /57 Submission March 1999 Bob Heile, GTESlide Working Group Report to ExCom Thursday, March 11, 1999 Wireless Personal Area.
Doc.: IEEE /1366r3 Submission November 2013 Laurent Cariou (Orange)Slide 1 Some propositions to progress towards the PAR definition Date: 2013-xx-11Authors:
TGn Chair’s Status Update
Below 6GHz 11vht PAR&5C's proposal
VHT SG Report to EC Date: Authors: November 2008 April 2007
Response to Official Comments
<month year> doc.: IEEE < e> November 2011
<month year> doc.: IEEE < e> November 2011
Proposed wording revisions to HT PAR Wednesday, March 12, 2003.
Comments on HT PAR & 5 Criteria
VHTL6 task group work plan proposal (VHTL < 6 GHz)
IEEE TGa Project Timeline
Proposed basis for PAR discussion
Requirements Discussion
VHT SG Report to EC Date: Authors: July 2008 April 2007
TGn Opening Report Portland, Oregon, US July /658
Inconsistencies in Comparison Criteria
TGn Closing Report – July ‘05
TGn Opening Report Portland, Oregon, US July /658
TGn Closing Report Orange County , CA, US May 2004
TGn Opening Report Portland, Oregon, US July 2004
HT SG PAR Proposal Colin Lanzl Aware, Inc.
SG4a Project Timeline January 2003 doc.: IEEE /056r0
Some propositions to progress towards the PAR definition
VHT SG Report to EC Date: Authors: July 2008 April 2007
TGn Closing Report Sept /1081 r2
TGn Speaker Sequence and Time Slot Allocation Sept /796
TGn Speaker Sequence and Time Slot Allocation Sept /796
Some propositions to progress towards the PAR definition
TGn Overview Portland, Oregon, US July 2004
Remaining incoherence in Comparison Criteria
Submission Title: [TGn Liaison Report] Date Submitted: [20Jan2006]
<month year> Denver, March 2006
TGac Status and Timeline
Task Group N Procedural Planning May 10, 2004
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4e Closing Report for Waikoloa Sep.
SG4a Project Timeline Interest Group ‘a’ Activities Aug 03
TGn Chair’s Status Update
<month year> doc.: IEEE < e> January 2012
Below 6GHz 11vht PAR&5C's proposal
An Introduction of IEEE TGbd
May 2002 Project: IEEE P Working Group for Wireless Local Area Networks (WLANs) Submission Title: Liaison Report, May 2002 Date Submitted:
<month year> Denver, March 2006
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG4e Closing Report for Waikoloa Sep.
Proposed work items and timeline for the LC SG
Proposed Modifications to VHT60 PAR
Proposed Modifications to VHT60 PAR
Proposed timeline for the Light Communications TG
An Introduction of IEEE TGbd
IEEE SGa Project Timeline
Some propositions to progress towards the PAR definition
Proposed Modifications to VHT60 PAR
TGn Meeting Report - June 02 ‘09
<month year> doc.: IEEE < e> January 2012
WLAN Overlay with 60 GHz Channels
<month year> doc.: IEEE < e> <May 2011>
Task Group N Schedule March 15, 2004
TGn Closing Report - July 19 ‘07
Response to Official Comments
TGn Closing Report Orlando , Fl, US March 2004
Proposed basis for PAR discussion
Presentation transcript:

TGn Overview Portland, Oregon, US July 2004 doc.: IEEE 802.11-04/0658r0 July 2004 TGn Overview Portland, Oregon, US July 2004 Bruce Kraemer, Chair bkraemer@conexant.com July 15, 2004 Kraemer, Conexant; Hillman, AMD Bruce Kraemer, Conexant

July 2004 TGn Motivation Demand for WLANs is expected to grow at a 50% Compounded Annual Growth Rate (CAGR) over the next five years. Over 50% of all home-networking connections and over 40% of all mobile PC network connections will be over WLAN by 2005. New usages such as simultaneous transmission of multiple HDTV signals, audio, and on-line gaming, will drive the need for higher throughput in the home. As usage increases in the corporate and other high-density environments, bandwidth restrictions of a shared media will begin to be realized. This is very similar to what happened in the wired Ethernet market where the need for higher throughput drove the development and adoption of Fast Ethernet. The need for higher throughput drove switching and 100Base-TX adoption. While a switching technology would ultimately be desired for WLAN, this is not technically feasible. The next logical step in wireless LAN technology is to increase the data throughput of each WLAN Connection. Kraemer, Conexant; Hillman, AMD

IEEE P802.11 - TGn Backgrounder July 2004 IEEE P802.11 - TGn Backgrounder TGn will define the next generation standard for high speed wireless LANs. The group's basic goal is to develop a standard capable of providing at least 100Mbps throughput at the MAC service access point. Existing 802.11 standards are typically designated by their peak physical data rates. For example, 802.11a has a peak data rate of 54Mbps. This amendment has chosen to use a performance metric of throughput measured at the MAC data SAP. This amendment seeks to improve the peak throughput to at least 100Mbps, measured at the MAC data SAP. Depending on the scenario, this represents an improvement of at least 4 times the throughput obtainable using existing 802.11 systems. Technical mechanisms for accomplishing this have not yet been determined by the task group but may include techniques such as spatial multiplexing, channel expansion, low density coding and a variety of other MAC efficiency improvement techniques TGn has defined comprehensive Functional Requirements, Comparison Criteria, Usage Scenarios, and Simulation Environments which must be addressed by the proposals in order to be considered for the final standard. Kraemer, Conexant; Hillman, AMD

Additional Project Goals July 2004 Additional Project Goals The MAC SAP interface will remain the same as for the existing 802.11 standard. The MAC SAP definition shall not be altered ensuring that all LLC and MAC interfaces are compatible to and in conformance with the IEEE 802.1 Architecture, Management and Internetworking standards. The proposed amendment shall introduce no 802.1 architectural changes. The scope of the MAC and PHY enhancements assume a baseline specification defined by 802.11 and its amendments and anticipated amendments a, b, d, e, g, h, i and j. The enhancements shall be to support higher throughput. The amendment shall not redefine mechanisms in the baseline that do not pertain to higher throughput. Some of the modes of operation defined in the HT amendment shall be backwards compatible and interoperable with 802.11a and/or 802.11g. Kraemer, Conexant; Hillman, AMD

No later than midnight GMT -5 No later than midnight GMT -5 July 2004 Time line You are here Monday May 17, 2004 IEEE 802 Sessions Open Monday Sep 13 No later than midnight GMT -5 Friday June 18 No later than midnight GMT -5 Friday Aug 13 80 days 30 days 50 days 30 days Event #3 Documents posted on IEEE server Technical Proposal CC Compliance Report FR Compliance Report Event #1 Issue call for proposals Event #2 Intent to present Full or Partial proposal notification submitted Event #4 All Proposals Presented in TGn Session Kraemer, Conexant; Hillman, AMD

Overall timeline July 2004 2003 2004 2005 2006 2007 HT SG Formed Publication PAR Approved TGn Formed ExCom NESCOM Approval First Sponsor Letter Ballot Selection Process & Criteria Call for Proposals First WG Letter Ballot First Proposal Presentations Down Select Kraemer, Conexant; Hillman, AMD

Time line - Proposed Schedule Highlights July 2004 doc.: IEEE 802.11-04/0658r0 July 2004 4. Time line - Proposed Schedule Highlights Issue First Letter Ballot on Draft 1.0 July 2005 3 sessions to review edit (Sep, Nov, Jan, Mar) Issue First Sponsor Ballot Mar 2006 3 sessions to review & edit ( May, July, Sept) Complete Sponsor ballot – accepted by ExCom Nov 2006 Publish Mar 2007 Kraemer, Conexant; Hillman, AMD Bruce Kraemer, Conexant