Project Management: A Managerial Approach 4/e

Slides:



Advertisements
Similar presentations
Project Management A Managerial Approach
Advertisements

John Wiley & Sons, Inc. © 2005 Prepared by Alice B. Sineath Forsyth Technical Community College Managerial Accounting Weygandt Kieso Kimmel CHAPTER 12.
Project Management: A Managerial Approach
MANAGEMENT OF ENGINEERING PROJECT MANAGEMENT
Common Stock Valuation
PowerPoint Presentation for Dennis & Haley Wixom, Systems Analysis and Design, 2 nd Edition Copyright 2003 © John Wiley & Sons, Inc. All rights reserved.
Project Management: A Managerial Approach 4/e
Systems Analysis and Design
MANAGEMENT SCIENCE The Art of Modeling with Spreadsheets STEPHEN G. POWELL KENNETH R. BAKER Compatible with Analytic Solver Platform FOURTH EDITION CHAPTER.
PowerPoint Presentation for Dennis & Haley Wixom, Systems Analysis and Design Copyright 2000 © John Wiley & Sons, Inc. All rights reserved. Slide 1 Systems.
Systems Analysis and Design with UML Version 2
© 2006 John Wiley and Sons, Inc. Project Management: A Managerial Approach Chapter 2 – Strategic Management and Project Selection.
Ch. 2 Strategic Management and Project Selection
Project Selection Models. Project Selection Project selection is the process of evaluating individual projects or groups of projects, and then choosing.
MEM 612 Project Management Chapter 1 The World of Project Management.
Copyright © 2000 John Wiley & Sons, Inc. All rights reserved
EUT443 – Engineering Management Chapter 1 The World of Project Management.
Information Technology Economics
Northern University Bangladesh© 2006 John Wiley and Sons, Inc. Project Management: A Managerial Approach Chapter 2 – Strategic Management and Project Selection.
Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.1-1.
Slide 1 Systems Analysis and Design with UML Version 2.0 An Object-Oriented Approach, Second Edition Chapter 3: Project Initiation Alan Dennis, Barbara.
Slide 1 Systems Analysis and Design with UML Version 2.0 An Object-Oriented Approach, Second Edition Chapter 3: Project Initiation Alan Dennis, Barbara.
Project Management in Practice
Project Selection Models 1. 2 Strategic Management and Project Selection Maturity of Project Management Criteria for PS Models Nature of PS Models Types.
Project Management in Practice Fourth Edition Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Paterson University.
Reid & Sanders, Operations Management © Wiley 2002 Linear Programming B SUPPLEMENT.
EUT443 – Engineering Management Chapter 1 The World of Project Management.
6 - 1 Chapter 6: Analysis Using Spreadsheets PowerPoint Slides Prepared By: Alan Olinsky Bryant University Management Science: The Art of Modeling with.
Project Management A Managerial Approach
Copyright 2015 John Wiley & Sons, Inc. Part I Project Initiation.
1 Project Selection. 2 I. Project Selection: Non-Numeric Models Sacred Cow Operating Necessity Competitive Necessity Product Line Extension Comparative.
Prepared by Debby Bloom-Hill CMA, CFM
Part I Project Initiation.
Prepared by Debby Bloom-Hill CMA, CFM
Chapter 4 PowerPoint Spreadsheet Analysis.
Common Stock Valuation
Prepared by Debby Bloom-Hill CMA, CFM
Chapter 4 Using Financial Statements to Analyze Value Creation
Systems Analysis and Design
Prepared by Debby Bloom-Hill CMA, CFM
Systems Analysis and Design
Presentation on Project Selection
The Returns and Risks From Investing
The World of Project Management
“Copyright © 2001 John Wiley & Sons, Inc. All rights reserved
Internal Analysis Chapter Six
1-1 Chapter 1 Charles P. Jones, Investments: Analysis and Management, Tenth Edition, John Wiley & Sons Prepared by G.D. Koppenhaver, Iowa State University.
Chapter 6: Cash and Accounts Receivable
Chapter 17: Optimization In Simulation
Chapter 8: Planning – Processes and Techniques
Evaluating and Terminating the Project
Understanding Investments
Managerial Economics Eighth Edition Truett + Truett
Managerial Economics Truett + Truett Eighth Edition
liquidation of a partnership.
Systems Analysis and Design
Other Long-Run Decisions
Accounting Information Systems: Essential Concepts and Applications Fourth Edition by Wilkinson, Cerullo, Raval, and Wong-On-Wing Module 1: Decision Making,
The Production Process
Systems Analysis and Design with UML Version 2
Information Technology Economics
Project Management in Practice Second Edition
Systems Analysis and Design
MACROECONOMICS AND THE GLOBAL BUSINESS ENVIRONMENT
Information Technology Project Management
Chapter 2: The Conceptual Framework
Chapter 4: Income Statement and Related Information
Copyright © 2000 John Wiley & Sons, Inc. All rights reserved
Systems Analysis and Design
PLANNING FOR CAPITAL INVESTMENTS
Presentation transcript:

Project Management: A Managerial Approach 4/e By Jack R. Meredith and Samuel J. Mantel, Jr. Published by John Wiley & Sons, Inc. Presentation prepared by RTBM WebGroup

Project Management A Managerial Approach Chapter 2 Project Selection

Project Selection Project selection is the process of evaluating individual projects or groups of projects, and then choosing to implement some set of them so that the objectives of the parent organization will be achieved Managers often use decision-aiding models to extract the relevant issues of a problem from the details in which the problem is embedded Models represent the problem’s structure and can be useful in selecting and evaluating projects Chapter 2-1

Criteria for Project Selection Models Realism - reality of manager’s decision Capability- able to simulate different scenarios and optimize the decision Flexibility - provide valid results within the range of conditions Ease of Use - reasonably convenient, easy execution, and easily understood Cost - Data gathering and modeling costs should be low relative to the cost of the project Easy Computerization - must be easy and convenient to gather, store and manipulate data in the model Chapter 2-2

Nature of Project Selection Models 2 Basic Types of Models Numeric Nonnumeric Two Critical Facts: Models do not make decisions - People do! All models, however sophisticated, are only partial representations of the reality the are meant to reflect Chapter 2-3

Nonnumeric Models Sacred Cow - project is suggested by a senior and powerful official in the organization Operating Necessity - the project is required to keep the system running Competitive Necessity - project is necessary to sustain a competitive position Product Line Extension - projects are judged on how they fit with current product line, fill a gap, strengthen a weak link, or extend the line in a new desirable way. Comparative Benefit Model - several projects are considered and the one with the most benefit to the firm is selected Chapter 2-4

Numeric Models: Profit/Profitability Payback period - initial fixed investment/estimated annual cash inflows from the project Average Rate of Return - average annual profit/average investment Discounted Cash Flow - Present Value Method Internal Rate of Return - Finds rate of return that equates present value of inflows and outflows Profitability Index - NPV of all future expected cash flows/initial cash investment Chapter 2-5

Numeric Models: Scoring Unweighted 0-1 Factor Model Unweighted Factor Scoring Model Weighted Factor Scoring Model Constrained Weighted Factor Scoring Model Goal Programming with Multiple Objectives Chapter 2-6

Risk Versus Uncertainty Analysis Under Uncertainty - The Management of Risk The difference between risk and uncertainty Risk - when the decision maker knows the probability of each and every state of nature and thus each and every outcome. An expected value of each alternative action can be determined Uncertainty - when a decision maker has information that is not complete and therefore cannot determine the expected value of each alternative Chapter 2-7

Risk Analysis Principal contribution of risk analysis is to focus the attention on understanding the nature and extent of the uncertainty associated with some variables used in a decision making process Usually understood to use financial measures in determining the desirability of an investment project Chapter 2-8

Risk Analysis Probability distributions are determined or subjectively estimated for each of the “uncertain” variables The probability distribution for the rate of return (or net present value) is then found by simulation Both the expectation and its variability are important criteria in the evaluation of a project Chapter 2-9

Risk Analysis Chapter 2-10

Information Base for Selections Accounting Data Measurements Subjective vs. Objective Quantitative vs. Qualitative Reliable vs. Unreliable Valid vs. Invalid Technological Shock Chapter 2-11

Project Proposals Which projects should be bid on? How should the proposal-preparation process be organized and staffed? How much should be spent on preparing proposals for bids? How should the bid prices be set? What is the bidding strategy? Is it ethical? Chapter 2-12

Project Proposal Contents Executive Summary Cover Letter Nature of the technical problem Plan for Implementation of Project Plan for Logistic Support & Administration of the project Description of group proposing to do the work Any relevant past experience that can be applied Chapter 2-13

Summary Primary selection criteria are realism, capability,flexibility, ease of use, and cost In preparing to use a model, a firm must identify its objectives, weighting them relative to each other, and determining the probable impacts of the project on the firm’s competitive abilities. Models can be numeric or nonnumeric Chapter 2-14

Summary Numeric Models can be subdivided into profitability and scoring models To handle uncertainty, pro forma documents, risk analysis, and simulation with sensitivity analysis are helpful Special care should be given to data in project selection models. Of concern are data taken from accounting data base and the effect of technological shock Chapter 2-15

Summary Project proposals generally consist of several sections: the technical approach, the implementation plan, the plan for logistics support and administration, and past experience. The history of project selection models has shown an increase in the use of formal models, particularly profitability models. Chapter 2-16

Project Selection Questions? Chapter 2-17

Project Selection Picture Files

Project Selection Figure 2-1

Project Selection Figure 2-2

Project Selection Table Files

Project Selection

Project Selection

Project Selection

Project Selection

Project Selection

Project Selection

Copyright © 2000 John Wiley & Sons, Inc. All rights reserved Copyright © 2000 John Wiley & Sons, Inc. All rights reserved. Reproduction or translation of this work beyond that permitted in Section 117 of the 1976 United States Copyright Act without the express written permission of the copyright owner is unlawful. Request for further information should be addressed to the Permissions Department, John Wiley & Sons, Inc. The purchaser may make back-up copies for his/her own use only and not for distribution or resale. The Publisher assumes no responsibility for errors, omissions, or damages, caused by the use of these programs or from the use of the information contained herein.