Exit Overruns in the Enduring Regime

Slides:



Advertisements
Similar presentations
NTS Exit Capacity - Amending the DN Adjustment Window Transmission Workstream, 1 April 2010.
Advertisements

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Long Term Entry Capacity & User Commitment Transmission Workstream 7 th August 2008.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
Enduring Offtake Arrangements including an Off-Peak Interruptible Service Peter Bolitho.
1 CODE MODIFICATION PROPOSAL No 0243 Amendments to the process for initialisation of Enduring NTS Exit (Flat) Capacity at the Moffat NTS Exit Point Presentation.
Mod 116B Steve Rose - on behalf of RWE Trading. 2 Background Mod 116 B was raised after discussion with a number of shippers about aspects Mod 116 which.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Modification Proposal 0246: Quarterly NTS Entry Capacity User Commitment Chris Shanley.
Assignment of NTS Entry Capacity Transmission Workstream 06 November 2008.
Review Group Modification Proposal Introduction of Enduring NTS Exit Capacity Arrangements.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Update on Entry Capacity Substitution Transmission Workstream 6 th March 2008 Summary of consultation responses.
Mod 166 Review Group Incremental Exit Capacity at New and Existing Exit Points.
Mod Clarifications Transmission Workstream 6 August 2009.
Initial Thoughts on the Release of Non Obligated NTS System Entry Capacity Transmission Workstream 3 rd April 2008.
Assignment of NTS Entry Capacity Transmission Workstream 02 July 2009.
Entry Capacity Trading Transmission Work Stream, 5 April 2007.
Enduring Exit Regime & NTS Risk Management Processes Offtake Arrangement Workstream – OAD Section I Review Group 316.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Assignment of NTS Entry Capacity – Questions relating to High level Business Rules Assignment Workstream, 7th April 2009.
DRSEC Update Transmission Workstream 06 November 2008.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
UNC0376A - Increased Choice when applying for NTS Exit Capacity – User Pays initial thoughts Review Group August 2010 Transmission Workstream 01.
Network Flexibility Mike Wassell Transmission workstream, January
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Transitional Exit Capacity Proposals -Update Transmission Workstream, 1 Dec Nov 05.
Interactions with the implementation of RIIO-T1
Workgroup meeting October 2014
Transitional Exit Capacity Proposals -Update
Entry Capacity Overrun price calculation
Shipper Termination Rules
Modification Proposal 0283 Update
Exit Capacity User Commitment – Transmission Workstream update
Transmission Workstream 4th July 2007
Transmission Workstream, 6 August
Transmission Workgroup – 1st December 2011
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Exit Overruns in the Enduring Regime - draft MOD principles
NTS Entry Charging Review Update
Discussion on Mod262 and next steps
Mod 0452 (PARCA) – Further thoughts
Assignment of NTS Entry Capacity – Background and UNC Obligations
PARCA Security and Termination Amounts
7th July 2011 Transmission Workgroup - Elexon
MOD Flow Swap Scenario’s – Initial Thoughts
Transmission Workgroup June 7th 2012
COR1360 NTS Exit Reform (Mod 0195AV) UK-Link Committee 11th June 2009
Enduring Offtake Arrangements (Including an alternative daily interruptible capacity release mechanism to facilitate use of spare capacity) Peter Bolitho.
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
MOD National Grid NTS Initiated Flow Swaps
Simon Trivella –5th May 2011 Transmission Workgroup - Elexon
Flow Swap Scenarios – Agreed Logic
UNC Modification Proposal 0385 Inclusion of DNOs as Users in User Pays Arrangements Phil Lucas 7 June 2011.
MOD Deemed applications – User pays initial thoughts.
Transmission Workstream – Partial Assignment
UNC Transmission Workstream 7th December 2006
Wales & West Utilities Mod 0671 User Commitment
Proposed Transitional Gas Exit Arrangements
Entry Overrun Calculation
Transmission Workstream - EU 3rd Package Update
Revised Tender Timescale for DN Interruption Arrangements
Transmission Workstream 05 November 2009
MOD Flow Swap Scenario’s – Initial Thoughts
Presentation transcript:

Exit Overruns in the Enduring Regime Transmission Workstream – 1st July 2010

Exit Overruns – Background Under the enduring regime Users are incentivised to procure sufficient Exit Capacity to cover their offtake requirements: Overrun charges Based on similar principles to Entry, other than aggregate position at exit point taken into account where multiple capacity holders exist Deemed application for Enduring Exit capacity This presentation focuses on the deemed application principles only UNC TPD B3.2.25 “Where a User incurs an Overrun charge on a quantity greater than 100,000 kWh in any 12 month period (ending March 31st) they are deemed to have made an enduring application in the following July window (effective Y+4) for the highest overrun quantity for that User at that exit point in that 12 month period”

Simple illustration note, graph is not to scale The above shows a simple illustration of how the deemed application principles will work A User overruns twice at an exit point in the period April to March, and is charged for both occurrences via the overrun charge mechanism In addition to the overrun charges, the highest overrun quantity translates into an application for an increase of enduring exit cap equivalent to the overrun quantity, effective from Y+4 Enduring entitlement increases accordingly from Y+4

More complex illustration note, graph is not to scale The above shows a more complex scenario where the User overruns (and is charged for all overrun instances accordingly) in two successive 12 month periods by the same highest quantity This results in two separate deemed applications (i.e. one for each year) As a result, a cumulative enduring application, equating to the highest overrun in year 1 plus the highest overrun in year 2, is seen User committed to higher level of enduring capacity for up to 4 years from Y+5

Way forward NG NTS is seeking views as to whether: this an unintended consequence of the deemed application business rules? Warrant change or leave as-is? High level potential solution: Utilise highest historic overrun of User as benchmark to measure against? Hence cumulative effect of deemed applications is 40 as apposed to 110 if left as-is talk around: other solutions have been explored but complex, this solution is in keeping with original principles of the deemed application process