Assessment of current management plan (EoH Tool 5)

Slides:



Advertisements
Similar presentations
Personal Development Plans (PDPs) Subject-specific PDPs in Economics.
Advertisements

Project Appraisal Module 5 Session 6.
Implementing NICE guidance
Conducting the IT Audit
Engineering, Operations & Technology | Information TechnologyAPEX | 1 Copyright © 2009 Boeing. All rights reserved. Architecture Concept UG D- DOC UG D-
WWF – World Bank Management Effectiveness Tracking Tool What is Management Effectiveness Evaluation? Sue Stolton.
Strengthening Institutional Frameworks for Sustainable Development Pre-event on Institutional Frameworks for Sustainable Development in Africa: Integrating.
The Enhancing Our Heritage Toolkit Sue Stolton, Equilibrium Research, UK.
Assessment on the implementation of the Mediterranean Strategy for Sustainable Development Dr Nicola Cantore Overseas Development Institute,
Project design & Planning The Logical Framework Approach An Over View Icelandic International Development Agency (ICEIDA) Iceland United Nations University.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
How to use the VSS to design a National Strategy for the Development of Statistics (NSDS) 1.
Slide 1 An Alfred McAlpine plc company. Thursday, 04 October 2007 Land Management Guidance (v2) Philippa Towler.
Roadmap for a monitoring framework for the post-2015 development agenda OWG on Sustainable Development Goals Informal meeting on measuring progress (17.
Looking at our School—LAOS School Development Planning Initiative.
Evaluation Proposal Defense Observations and Suggestions Yibeltal Kiflie August 2009.
1 Rating Practices in Local Government Performance Audit Andrew Evans Acting Director, Performance Audit Local Government Sector 6 September 2012 ▌ VLGA.
Using EoH tools to identify values and threats to those values (tools 1 and 2)
INTEGRATED ASSESSMENT AND PLANNING FOR SUSTAINABLE DEVELOPMENT 1 Click to edit Master title style 1 Evaluation and Review of Experience from UNEP Projects.
Guide to Options Comparison Revision of the SAFEGROUNDS Guidance James Penfold, Quintessa SAFESPUR, 4 October 2007.
Unit-5 Introduction to IS/ISO 9004:2000 – quality management systems – guidelines for performance improvements. Presented by N.Vigneshwari.
Technology Needs Assessments under GEF Enabling Activities “Top Ups” UNFCCC/UNDP Expert Meeting on Methodologies for Technology Needs Assessments
Sustainability Principles for Land Use and Mobility Approved by City Council – January 2007.
Better regulation in the Commission Jonathon Stoodley Head of Unit C.1 Evaluation, Regulatory Fitness and Performance Secretariat General of the European.
Regional Sediment Management Policy and Implementation Workshop April, 2009.
Tools for Mainstreaming Disaster Risk Reduction: Guidance Notes for Development Organisations Charlotte Benson and John Twigg Presented by Margaret Arnold.
Executive Order Environmental Stewardship and Transportation Infrastructure Project Reviews Priority Issues.
Presenter:- Mrs. Josette Maxwell-Dalsou Chief Economist Economic Planning Ministry of Finance, Economic Affairs and National Development.
URBAN STREAM REHABILITATION. The URBEM Framework.
Integration of sustainable development approach
Michael J. Novak ASQ Section 0511 Meeting, February 8, 2017
School – Based Assessment – Framework
Niall Byrne, Deputy Director, Social Services
5 steps to align your talent strategy to the organisational strategy
Contribute to the development of a strategic plan.
Implementation Subprogramme
The Logical Framework Approach
WP 3 How to assess implementation of ALARA
WORLD HERITAGE - EXPERT MEETING ON BENCHMARKS
9/16/2018 The ACT Government’s commitment to Performance and Accountability – the role of Evaluation Presentation to the Canberra Evaluation Forum Thursday,
Accountability and Internal Controls – Best Practices
Gender Equality Ex post evaluation of the ESF ( )
Guidance on Natura 2000 and Forests – Scoping Document
Guidance on Natura 2000 and Forests – Scoping Document
2018 HUD Start Up 2 CFR 200.
OLAC Beliefs/Assumptions
ПОСИЛЕННЯ ПОТЕНЦІАЛУ ІНСТИТУЦІЇ УКРАЇНСЬКОГО ОМБУДСМЕНА:
Prioritised Action Frameworks for financing Natura 2000
Start with the Science & Technology Standards (2002, 2008?)
Assessment Form for Periodic Reporting
Taking forward the common understanding of Art. 8, 9 and 10 MSFD
WG ESA meeting 9th of March 2015
Good practice in preparing an application
There is a significant amount of diversity across the 38 rural councils in terms of the challenges faced, as well as capacity, resourcing and uptake.
Leading Practice Implementation Guide
DIAGNOSTIC FRAMEWORK: National Accounts and Supporting Statistics
Sustainable Development
Preliminary methodology for the assessment of Member States’ reporting on Programme of Measures (Article 16) WG DIKE Sarine Barsoumian (12/10/2015, Brussels)
EU Marine Strategy DG Environment B.1.
Guide to the Single Plan for Student Achievement
Leading Practice Implementation Guide
Is it Project-based Learning?
Natura 2000 management group Brussels, 19 May 2011
LATN Quality Assurance Benchmarking Project
Presentation title Adaptation Committee and Least Developed Countries Expert Group Agenda item 5 (c-e) Draft recommendations developed by the Adaptation.
DIAGNOSTIC FRAMEWORK: National Accounts and Supporting Statistics
Concept paper on the assessment of WFD River Basin Management Plans
ESS.VIP.SERV Shared Services
MSFD PoMs workshop on CEA/CBA April 1, 2014
LEARNER-CENTERED PSYCHOLOGICAL PRINCIPLES. The American Psychological Association put together the Leaner-Centered Psychological Principles. These psychological.
Presentation transcript:

Assessment of current management plan (EoH Tool 5)

Planning assessment Tool 5: Assessment of Management Planning Background: Developed from best practice in protected area planning Concept: Reviews status of planning documents and assesses the primary decision making document Methodology and datasheet: decision-making framework; adequacy of information; needs and interests of any local and indigenous communities and other stakeholders

What makes a good management plan? Provide clear direction for the site Link management objectives to site values (OUV) Direct activities and work plans focused on achieving these objectives Involve stakeholders Be linked to budgets and available resources Have measurable and achievable targets

Two worksheets Worksheet 5a collects information on the extent and status of planning undertaken for the site, listing all the relevant plans and recording details about them. Worksheet 5b assesses the nature and adequacy of the primary planning systems and processes that have been employed.

Principles of an effective plan Provide a sound decision-making framework a clear vision of the desired future based on the major site values a set of strategies and actions for achieving this future clear guidance to assist managers in dealing with opportunities and eventualities that arise during the life of the plan basis for monitoring implementation of the plan adaptable Management within the relevant environmental, social and economic planning context Plan content based on an adequate and current information base The plan should provide a programmed and prioritised set of actions for its implementation

Principles of an effective plan Provide a sound decision-making framework a clear vision of the desired future based on the major site values a set of strategies and actions for achieving this future clear guidance to assist managers in dealing with opportunities and eventualities that arise during the life of the plan basis for monitoring implementation of the plan adaptable Management within the relevant environmental, social and economic planning context Plan content based on an adequate and current information base The plan should provide a programmed and prioritised set of actions for its implementation

Assessment worksheet Worksheet 5b consists of 14 multiple choice question Four possible responses for each question are given (column 2), which equate to a four-point rating system (Very Good, Good, Fair or Poor). These questions and responses may need to be amended to match the standards and expectations of site planning systems, particularly where a plan other than the management plan is being assessed. Also records: Comments/Explanation; Opportunities, recommendations and follow-up actions

Worksheet 5b for developing/ revising a management plan Helps focus on best practice Can highlight areas where planning has succeeded and practices should be replicated and where changes need to be made in the future