The spoke CM tests at FREIA

Slides:



Advertisements
Similar presentations
Stochastic cooling and 56 MHz SRF update for Run-14 W. Fischer 21 January 2014.
Advertisements

Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
BEPCII RF POWER SYSTEM RF group, IHEP Sep ~ April 1.The 1 st transmitter had finished installing,commissioning and SAT (Site Acceptance Test).
Overview Interfaces Planning.  One PC to control 2 cavities in one cryo-module  Standard PLC and hardware components  Expected PLC cycle time 2ms.
DESIGN OF A HIGH POWER TEST STAND FOR ESS SPOKE CAVITIES
EPICS on TPS RF System Yu-Hang Lin Radio Frequency Group NSRRC.
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
Diagnostics and Controls K. Gajewski ESS Spoke RF Source Accelerator Internal Review.
Agenda Adaptation of existing open-source control systems from compact accelerators to large scale facilities.
E. KAKO (KEK) 2009' Sept. 30 Albuquerque Global Design Effort 1 Cavity Test Items in S1-G Cryomodule Eiji Kako (KEK, Japan)
ESS cavities interfaces
Test Stands Roger Ruber Uppsala University ESS TAC4 16 Feb
S1G Experiment Schedule Plan H. Hayano. Assembly work after cavity arrived Assumption: cavity with VT, with pickup antena, with Ar or N2 filled,
XFEL SRF Accelerating Module Prototypes Tests at DESY Fermilab Seminar, July 21st Denis Kostin, MHF-SL, DESY.
LLRF-05 Oct.10,20051 Digital LLRF feedback control system for the J-PARC linac Shin MICHIZONO KEK, High Energy Accelerator Research Organization (JAPAN)
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
Anders Sunesson RF Group ESS Accelerator Division
Marc Ross Nick Walker Akira Yamamoto ‘Overhead and Margin’ – an attempt to set standard terminology 10 Sept 2010 Overhead and Margin 1.
Low-Level RF of BEPCII Sun YI IMAC’07 May. 11, 2007 IHEP.
MP Questions for LE eCooling. Why talk about this now? Is there additional equipment needed, not yet considered? (nor costed) Interfaces to systems that.
S1G Experiment Schedule Plan; H. Hayano ILC10 GDE meeting.
ESS LLRF and Beam Interaction. ESS RF system From the wall plug to the coupler Controlled over EPICS Connected to the global Machine Protection System.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
Preliminary Functional Analysis of ESS Superconducting Radio-Frequency Linac C. Darve, N. Elias, J. Fydrych, D. Piso European Spallation Source ESS AB,
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Kirk Davis.
Preliminary Results from First Blade Tuner Tests in HTS Yuriy Pischalnikov Warren Schappert Serena Barbannoti Matteo Scorrano.
Control System Considerations for ADS EuCARD-2/MAX Accelerators for Accelerator Driven Systems Workshop, CERN, March 20-21, 2014 Klemen Žagar Robert Modic.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
ACS news RF cabling campaign: DONE Final tests cavity tuning motor (ctrl): in progress recabling software upgrade Water cooling: ADT static pressure test:
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Status of Vertical Test Stand at RRCAT P Shrivastava, P Mohania,D.Baxy, Vikas Rajput S C Joshi, S Raghavendra,S K Suhane RRCAT, Indore November 26, 2012.
1 Tuner performance with LLRF control at KEK Shin MICHIZONO (KEK) Dec.07 TTC Beijing (Michizono) S1G (RDR configuration) - Detuning monitor - Tuner control.
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
Superconducting Accelerating Cryo-Module Tests at DESY TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Denis Kostin,
Control system at the FREIA Laboratory
ESS LLRF and Beam Interaction
Cost Optimization Models for SRF Linacs
Cryomdoule Test Stand.
S1G Experiment Schedule Plan
Cryomodule test stand at ESS site
Test of the dressed spoke cavity
T5.2: Harmonization - Material and Component Reference
Spoke Cavity Power Coupler for the European Spallation Source (ESS)
Uppsala Commitment to ESS and FREIA Planning
Overview and System Design for ESS LLRF Systems
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
LLRF for ESS: Requirements and System design
Update on HW commissioning
EPICS/WinCC Control of the Vertical Cryostat K. Gajewski
Test plan of ESS HB elliptical cavity
Test plan of ESS HB elliptical cavity
Mechanical setups Lorentz Force Detuning System Setup
Test plan of ESS HB elliptical cavity
ESS RF Development at Uppsala University
Test plan of ESS HB elliptical cavity
XFEL cavities and cryomodules measurements at AMTF
Jefferson Lab Low Level RF Controls
Test plan of ESS HB elliptical cavity
Test plan of ESS HB elliptical cavity
First High Power Test of the ESS Double Spoke Cavity package
An Optimal Procedure for RF Conditionning at the FREIA Laboratory
Cryomodules Challenges for PERLE
Cryomodule ESS FAT & SAT SRF meetinG on 07/11/2017
Bonjour. Franck Peauger. Je suis Ingénieur RF accélérateurs au SACM
RF introduction Anders Sunesson RF group leader
Cryomodule Test Schedule
Vacuum Control System for Monolith Vacuum
Facility for Research Instrumentation and Accelerator Development
Uppsala University - The FREIA Laboratory
Presentation transcript:

The spoke CM tests at FREIA What we have, what we plan, what we don’t know… Konrad Gajewski FREIA Laboratory

FREIA Laboratory - infrastructure LHe cryo-plant The bunker Two 352 MHz 400 kW RF amplifiers RF switchboard, transfer lines, circulators, loads, etc. Horizontal cryostat (HNOSS) Deionized cooling water system Radiation monitoring system Oxygen deficiency detectors RF leakage detectors Weather station (temperature, humidity, pressure in the hall) 26-Oct-2017 Konrad Gajewski – The spoke CM tests @ FREIA

FREIA Laboratory – control system EPICS (ICS Development Environment) All subsystems connected to EPICS PLC for slow control (water, vacuum, interlocks, radiation protection) µTCA LLRF and timing (LU) cRIO for fast interlocks (programmed in LabVIEW) Almost all data archived using archive appliance (and CS-Studio archiver as backup) CS-Studio BEAST alarm server CS-Studio BOY as a primary user interface LabVIEW Most of the laboratory instruments (oscilloscopes, signal generators, spectrum analyzers, power meters, vector network analyzer) NI PXIe fast data acquisition (10 channels, 250 Ms/s, input bandwidth 800 Mhz, Self Exited Loop) 26-Oct-2017 Konrad Gajewski – The spoke CM tests @ FREIA

Tests done so far – gained experience Copper cavity SEL RF calibration procedures instrumentation Single spoke cavity Cryogenics (cooling down, heat loads) gradient measurements Double spoke cavity power coupler and cavity conditioning (automatic procedure) high power tests: filling time, Lorentz force detuning Cold Tuner System 26-Oct-2017 Konrad Gajewski – The spoke CM tests @ FREIA

CM tests -warm RF check: cavity spectrum, external Q CTS verification: piezo and step motor Calibration of the RF lines Interlock tests Coupler conditioning 26-Oct-2017 Konrad Gajewski – The spoke CM tests @ FREIA

CM tests - cold Recalibration of the RF lines Cavity spectra (fundamental and HOM) Coupler and cavity conditioning Tests of the cold tuners (stepper motor, piezo) Q measurements (QL, Q0, Temperature effects on cavity tune Measurement of the cavity gradient X-ray emmission Electron activity in the coupler Dynamic RF losses Lorentz force detuning (measurement and compensation) Microphonics 26-Oct-2017 Konrad Gajewski – The spoke CM tests @ FREIA

Compatiblity FREIA - ESS Common equipment for the tests: Instrumentation Power meters Scope, spectrum analyzer … RF measurements µTCA LLRF (@FREIA we use it for the fast interlocks) NI PXIe Interlocks Arc detectors Multipacting detectors (threshold/ADC) Vacuum levels (threshold/ADC) Radiation monitors Quench detector 26-Oct-2017 Konrad Gajewski – The spoke CM tests @ FREIA

Problems to deal with Contact persons Valve box controls New timing system CTS controls (piezo controller and software) PLC interface (S7-300 using standard s7plc driver from PSI) Laboratory instrumentation - EPICS support Missing: LLRF: broken CPU, signal generators, timing system, piezo controller Naming conventions, standard OPI (symbol library, color styles, etc) Test acceptance criteria Automatization of the test procedures (python, LabVIEW, Jupiter Notebook) Sharing the tests configuration, procedures and results (tools, standards) … 26-Oct-2017 Konrad Gajewski – The spoke CM tests @ FREIA