Shoumen Water Cycle Improvements

Slides:



Advertisements
Similar presentations
Mike Peckham CAC January 16, 2007 Pickering A Units 2 & 3 Safe Storage Project.
Advertisements

EU funds Operational Program National co-funding Priority axes Schemes Projects by Institutions Projects by NGOs Projects by Bulgarian Companies Subcontractors.
RAMBOLL MOLDOVA OFFICE PRESENTATION May This is a building of ACC in Chisinau. On the top of building - "The water is the source of life” (in Romanian).
Engine & Transmission Fleet Warranty Engine & Transmission Warranty.
FOG Guidance Document Launch Seminar 26th January 2012 Water Services Training Group Guidance Document Control of Fat Oil and Grease Launch Seminar 26.
LUNENBURG DEPARTMENT OF PUBLIC WORKS Pavement Funding and Maintenance.
1 Scope 1.18km of sewers (500mm to 3000mm dia) 2.2 lift stations 3.Demolition of 4 pumping stations – Jurong West, Jalan Bahar, Corporation and International.
ISPA Measure 2000 BG 16 P PE 001 Integrated water project – City of Sofia Performance 100%
Arterial Street Rehabilitation for Riverside Drive 24 th Street to 35 th Street Public Informational Meeting July 22, 2014.
Regional Transport Projects, Improving the Business Climate by Investing in Modern Transport. Role of the Governments and Opportunities for PPPs Southeast.
Informations about Brazilian Auctions Reserve Energy Auction – LER 2013 Date of Occurrence : August 23th, 2013 Date for Supply: September /2015.
My short report is about: - Supply - Supply curve - Business cycle.
(LSI Ltd.). Łódź in the centre of Europe Area: km2 Population: 768,000 inhabitants Inhabitants of Łódź at economically productive age: 506,000 Higher.
PROJECT OVERVIEW FM Budget € Total contracted € –EU Grant € –National Co-financing –Total contracted /
„Extension and modernization of water and wastewater infrastructure in Arad County”
Lab Equipment for Sale Select one piece of lab equipment and create a flyer to advertise the sale of it. Your flyer must include the following: Picture………..……….10.
EVN - Energy and Environment Services
Modernisation of signalling system (2001/LV/16/P/PT/006) Stage 1 Intermediate Body: Ministry of Transport Employer: Latvian Railway - LDZ Contractor: Consortium.
Cohesion Fund Monitoring Committee CR 1164/94 ISPA Measure 2001 BG 16 P PE 004 FGD Plants at Units 5&6 of TPP Maritsa East 2.
Ministry of Regional Development and Public Works _____________________________________________________________________________ PRIORITIES
Presentation on Interconnection or Turn-Over of Water Reticulation System for Subdivisions.
MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS MANAGING AUTHORITY FOR COHESION FUND (REG 1164/94) Tenth Cohesion Fund (Regulation 1164/94) Monitoring.
1 Broken Hill Solar Plant Community Information Session 1 July 2015.
PRESENTATION CULTURAL COOPERATION IN DENMARK State, Region and Municipalities Edge Cities Network, North Down, November 28 th 2013 Head of Culture, Municipality.
1 World Bank Investments in Uzbekistan Tashkent August 17, 2012 Takuya Kamata Country Manager for Uzbekistan The World Bank.
WATER CONDITIONING IN JURMALA GREEN BRIDGE FORUM 2015 Building the Bridge to Clean Technologies between European Union and Central Asian countries Jurmala,
BIODIESEL FLEET in PUBLIC WORKS OPERATIONS NASSAU COUNTY DEPT OF PUBLIC WORKS THOMAS R SUOZZI COUNTY EXECUTIVE RAY RIBEIRO, P.E. COMMISSIONER.
Institute of Urban Water Management. Technical & Chemical Laboratory.
Project No 2005/LV/16/C/PE/003 Development of water services in Riga, stage III This project helps to reduce economical and social disparities among the.
Utility reform in Romania example in Cluj Presentation of The Regional Environmental Center for Central and Eastern Europe Christelle Kapoen May 2008.
Final Conference of the INTERREG III C project MunServNet October 2007, Berlin NEGOTIATION OF Z. KARACSONYI AND I. CIURSAŞ ON THE PARTICIPATION OF.
Environmental Investment Centre (EIC) ISPA Unit Rävala pst 8, TALLINN Tel: Fax:
Balchik Integrated Water Project in Bulgaria ISPA Measure 2002 BG 17 P PE 017 WWTP BALCHIK.
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS MANAGING AUTHORITY FOR COHESION FUND (REGULATION 1164/94) MANAGEMENT OF PROJECTS, FINANCED BY COHESION.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Summary Report for FY15 Contracts & Compliance/Procurement Date: August 10, 2015.
PA-1 Surface Water Control Structure Replacement Final Payment.
December 3, 2015 TOWN OF MILLBURY DPW, MA Robert McNeil, P.E., Director PARE CORPORATION, FOXBORO, MA Allen R. Orsi, P.E., Managing Engineer This project.
Urban Water Management
7 th Cohesion Fund Monitoring Committee CR 1164/94 ISPA Measure 2001 BG 16 P PE 006 Wastewater Collection and treatment located in Pazardjik, Republic.
ISPA Measure 2002 BG 16 P PE 016 Varna Integrated Water Project Transformationof Transformation of WWTP Asparuhovo Reconstruction of WWTP Varna ReconstructionofWS&
ISPA Measure 2003 BG 16 P PE 019 Kardjali Regional Waste Management Centre in Bulgaria 10 th Cohesion Fund Monitoring Committee CR 1164/94.
11-14 April 2011 A P A V I T A L (Iai – Romania) general overview U.S. Civil Water and Wastewater Industry Program in Romania & Moldova - BUCHAREST.
MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS MANAGING AUTHORITY FOR COHESION FUND (REG 1164/94) Eight Cohesion Fund (Regulation 1164/94) Monitoring.
9 th Cohesion Fund Monitoring Committee CR 1164/94 ISPA Measure 2002 BG 16 P PE 018 Shoumen Water Cycle Improvements.
Ing. Alena Bujnová, Head of Water Policy Department Ministry of Environment of the Slovak Republic.
WASTEWATER TREATMENT PETRIT TARE GENERAL DIRECTOR OF UKKO JSC CONFORMING TO EU WASTEWATER TREATMENT DIRECTIVE CASE STUDY OF KORCA CITY, ALBANIA.
Copyright 2011, JICA’s Activity in Iraq - toward vibrant private sector - July 5, 2012 Masakazu Ichikawa Japan International Cooperation Agency 1.
1 KENYA SPAIN MULTILATERAL PARTNERSHIP MEETING (08-11 December 2013) AfDB Kenya Water and Sanitation Portfolio.
What we know about our customers
Works Contract Commencement Date: 20th May 2005
SUSTAINABLE GROUNDWATER MANAGEMENT ACT (SGMA)
Enron Corp. Board of Directors Presentation
Integrated Water Project for the town of Sliven
Weather. Water cycle Changes in weather.
SMEAL MENTORING PROGRAM EVENT CALENDAR
Urban and Regional Economics
Name: _________________ Class: ________
DEVALUATION IN EUROLAND
ISPA Measure 2002 BG 16 P PE 015 WWTP Popovo and main collectors
ISPA Measure 2002 BG 16 P PE 014 WWTP SEVLIEVO
ISPA Measure 2002 BG 16 P PE 009 WWTP Bourgas – Meden Rudnik
EDLC(Embedded system Development Life Cycle ).
ISPA Measure 2002 BG 16 P PE 010 Targovishte Wastewater Collection and Treatment, Republic of Bulgaria.
ISPA Measure 2002 BG 16 P PE 011 WWTP LOVECH
City Council Business Meeting
Organization news Archives of Physical Medicine and Rehabilitation
Thing / Person:____________________ Dates:_________________
Petar Pižurica, Executive Director of the department of production
Cemetery Collection Issues
Presentation transcript:

Shoumen Water Cycle Improvements ISPA Measure 2002 BG 16 P PE 018

1. Works Contract WWTP - terminated

2. Works Contract Rehabilitation and Reconstruction of the Water Supply and Sewerage and Network System of the city of Shoumen Commencement Date: 24th April 2009 Completion Date: 25th August 2011 Physical execution 100 % Contract Price 20,419 060.70 Euro

2. Works Contract Rehabilitation and Reconstruction of the Water Supply and Sewerage and Network System of the city of Shoumen

2. Works Contract Rehabilitation and Reconstruction of the Water Supply and Sewerage and Network System of the city of Shoumen

2. Works Contract Rehabilitation and Reconstruction of the Water Supply and Sewerage and Network System of the city of Shoumen