Overview Cost to Complete

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectLAT Face to Face, July 17-18, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center
Advertisements

GLAST LAT ProjectMonthly Status Meeting, June 30, Cost/Schedule Reports for 4.1 LAT Presentation Presentation May 2005 Month End Gamma-ray Large.
GLAST LAT ProjectDOE Rebaseline Review, February 13, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Chief Engineer.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby1 Martin Nordby Stanford Linear Accelerator Center Stanford University.
GLAST LAT ProjectEngineering Meeting, April 1, GLAST Large Area Telescope Engineering Meeting Quality Assurance And Manufacturing Preparations April.
GLAST LAT ProjectEngineering Meeting, December 3, GLAST Large Area Telescope: Engineering Meeting December 10, 2002 Lowell A. Klaisner Stanford.
GLAST LAT ProjectSubsystem Managers Face to Face, November 17, GLAST Large Area Telescope: Darren Marsh Stanford Linear Accelerator Center Performance.
GLAST LAT Project Quarterly Review, Aug. 14, 2001 Gunther Haller1 GLAST Large Area Telescope: Electronics, DAQ & Flight Software Gunther Haller Stanford.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project 1S. Ritz All Hands Items 11 August 2004.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST LAT ProjectNovember 17, 2004 AntiCoincidnce Detector 1 GLAST Large Area Telescope: Face to Face Meeting November 17, 2004 AntiCoincidence Detector.
GLAST Large Area Telescope:
GLAST LAT ProjectJune 30, 2004 Monthly Review Rev. C 1 GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 1 Introduction & Science Overview 1 GLAST Large Area Telescope: Introduction.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Engineering Model Tower.
National Aeronautics and Space Administration November 23, Gamma-ray Large Area Space Telescope (GLAST) Kevin Grady, Project Manager Steven Ritz,
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
GLAST LAT Project DOE/NASA Review, March 31, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
GLAST LAT ProjectApril 2005 Project Status Overview May 24, April, 2005 Lowell Klaisner LAT Project Manager Rev. - LAT Project Status Overview Gamma-ray.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectI&T&C Pre PDR Presentation – Oct 2, 2001 B. Grist1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT Project CAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
Power Upgrade Project SNS September 21-22, TBM Cost Estimate Cost Estimate Schedule Approach Tom Mann October 27, 2005.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 D. Nelson 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectSLAC Internal Review, April 16-18, 2002 LAT-PR Electronics and Flight Software WBS GLAST Large Area Telescope: Electronics,
Reported by Ron Prwivo for Ian Robson. Overview Response to Recommendations from the RLSR of November 2014 – very good, RF staffing remains an issue Very.
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Mechanical Integration
Gamma-ray Large Area Space Telescope
GLAST Large Area Telescope:
Integration, Test, and Calibration
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope Instrument Science Operations Center
GLAST Large Area Telescope: Cost/Schedule Review September 1, 2005
Large Area Telescope Project
Thermal Vacuum Test: Plans and Procedures
Lessons Learned and Earned Value Management System Assessment
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Integration and Test Organization Chart
GLAST LAT System Engineering
GLAST Large Area Telescope: I&T Test Readiness Review
March ’05 Face to Face Meeting Introduction
Introduction and Overview
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Production Month Sun Hours K Monthly Kwh Tou Peak Value After Kwh
GLAST Large Area Telescope: I&T Test Readiness Review
2015 January February March April May June July August September
GLAST Large Area Telescope: Deputy for Systems Engineering
Presentation transcript:

Overview Cost to Complete Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager Klaisner@slac.stanford.edu 650-926-2726 Overview Cost to Complete

Rebaseline schedule Subsystem managers input Done Review Cost to Complete Subsystem managers meeting November 17, 2004 Materials ready for DOE November 24, 2004 GLAST Mission Office Monthly December 2, 2004 LAT JOG Telecon December 6, 2004 LAT Baseline review at DOE Headquarters December 17, 2004 LAT JOG at NASA-HQ TBD

Schedule – Rebaseline July, 2003 TKR A/B 4/15/04 | 7/14/04 TKR 13/14 10/21/04 | 12/1/04 ACD 9/21/04 | 12/15/04 Critical Path Plan | Late CAL A/B 5/20/04 | 7/14/04 CAL 13/14 10/21/04 | 12/1/04 DAQ 9/10/04 | 12/15/04 TEM A/B 5/20/04 | 7/14/04 TEM 13/14 10/21/04 | 12/1/04 X-LAT 8/2/04 | 12/15/04 Install Tower A/B 8 wk Install Towers 1-12 12 wk Install Towers 13/14 2 wk Install Global items 6wk GRID Assembly 5/20/04 | 7/14/04 4 wk FLOAT 5/20/04 | 7/14/04 10/28/04 | 12/1/04 12/15/04 1/27/05 | 4/7/05 5/5/05 | 7/14/05 7/14/05 11/3/05 | 12/1/05 System Test 14 wk Environmental Testing 15 wk 10 wk FLOAT Pre-test Review Ship LAT 1 wk 4 wk FLOAT Pre-ship Review LAT RFI 12/1/05 CD-4 Review Fabrication Commissioning

DRAFT LAT Schedule – No float

Slip in the 16 months since rebaseline

DRAFT October Plan

Draft Cost Estimate

Summary of existing inputs Increase in fabrication phase funding $ 24 Million New fabrication phase funding $160 Million New cost to complete as of September 30 $ 41 Million New contingency $ 5.2 Million Assumed schedule Last Tracker module complete May 2005 Ship LAT to NRL September 2005 Ship LAT to Observatory Integration January 2006 2 months float March 2006 Launch May 2007 Cost risk is primarily schedule risk

Issues Can not let subsystem schedules slip Each subsystem needs to execute its own plan Even if off the critical path, each slip is causing major cost growth Need to control costs Can not continue to process CCB actions for costs that have already occurred Too many surprises Must ramp down staffing Descope options

Goals for this meeting Each subsystem manager should understand what is required to update his cost estimate and the supporting text Develop a cost to complete for the instrument to be used as the basis for the rebaseline Develop a schedule for shipping the instrument to NRL Needs a credible 2 months of float in January when the rebaseline is incorporated