The Thayer Homestead Development Committee T Fall Town Meeting November 14, 2011.

Slides:



Advertisements
Similar presentations
Historic Preservation Tax Credits The Process and Avoiding Common Problems National Park Service, Technical Preservation Services.
Advertisements

Capital Program Oversight Committee (CPOC) May 23, 2011 Alok Saha, P.E., Program Manager, CPM Infrastructure and Facilities – Line Equipment, Shops & Yard.
Fleurieu Regional Aquatic Centre Project summary October 2013 council meetings.
The 1820/57 Plymouth County Courthouse – Moving Forward with Redevelopment.
Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
Mt. Greylock RSD Building Project Initial Community Report October 8, 2013 Rose Ellis, Superintendent 0.
1 Procuring a Design Project engineers perspective on starting the design process and establishing the A/E scope of work Frank C. Quigley General Engineer.
Highland Park, Illinois Affordable Housing Trust Fund.
Needs Assessment & Master Plan. Needs Assessment & Master Plan Results Proposed Plan Costs Needs Safety Issues About Savage Field Environmental Impact.
Virginia Housing Coalition 2013 Housing Credit Conference Deal Structuring, Fundamentals, and Financing and Legal Issues.
MGT Efficiency Review Report Response Process Information that may inform budget development processes.
Rural Broadband, LLC Henry County Fiber Network Initiative Rural Broadband, LLC 15 Lake Street, Suite 270 Savannah, GA Contact: Allen Davis
5th Annual Innovation Challenge Kick-Off and Overview Info Sessions 1 & 2 Fall 2014 September 9 & 22
Community Preservation Committee Christopher Morely, Planning Board (co-chair) Tara Reed, At-Large Member (co-chair) Mark Kablack, At-Large Member John.
Washtenaw County Strategic Space Plan Recommendations November 1, 2006.
TRAIN DEPOT PROJECT Amherst County. Table of Contents I. I. Brief History of the Amherst Train Depot II. II. Train Stations in Virginia III. III. Local.
Article 41 Wastewater Planning Capacity Study To determine whether the Town will vote to adopt a resolution supporting the Town Manager’s allocation of.
THOMAS MEMORIAL LIBRARY A NEW VISION FOR THE “LIGHTHOUSE OF KNOWLEDGE”
Summary of Proposed Improvements to Town Office Building Carl F. Valente, Town Manager Linda Vine, Deputy Town Manager Mark Barrett, Department of Public.
1.0 Notify Archdiocese (Dir of Admin & Finance) of intent to build 1.1 Preliminar y approval to proceed? 2.0 Communicate plan to build with the parish.
Financial Management of Business Incubators Jim Greenwood, President Greenwood Consulting Group, Inc. Sanibel, Florida
The Camp Audit “Keep your friends close and your auditor closer”
Feasibility Study Schemes: · Scheme 1—Renovating and expanding the meetinghouse. This scheme moves the meetinghouse about 20 ft. west, converts it to.
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
Article 49 - Davis Field Park & Recreation Commission Town Meeting May
ACC QLD/NT Property Committee ROAD MAP: A 4-Stage Property Development Process for Churches, Schools and Other Facilities Version 1: August 2013.
Stoughton Public Library Feasibility & Design Study Report by CBT January 28, 2011 Current Library Built in 1969Proposed Library for the Future.
Chapter 4: Facility Planning. Contents Introduction Introduction Planning for Existing Facilities Planning for Existing Facilities Planning for Future.
APRIL 2, Superintendent proposes to consider construction of new administration building to Board May 2010 Board gives approval to begin search.
Business Planning j Through operational management.
Towne Building Story Acton Community Housing Corporation Towne Building History Why a great project Development Steps Request for Proposal (RFP) Program.
Montana Association of School Business Officials 2014 Annual Summer Conference School District Financing Getting ‘er Done June 16-18,
Long Range Facility Planning assisted by Silver Falls School District.
Transportation Center Rolling Forward Into Phase 2 October, 2008.
Tax Increment Thomas Chapman Raymond James John Repsholdt Ehlers Steven Langert Consolidated High School District 230.
Development of Secondary School Space in Grafton, MA A Review of the Process, Timing and Funding Mechanisms Expected through the Current MSBA Process January.
Community Bond Oversight Committee Report to the Board of Trustees Presented by: Ashton Cumberbatch, Bobby Jenkins, and Eliza May October 11, 2010.
From the Shredded Files of Big Business Assuring safeguards with effective Financial Policies Pam Baker and Ernest Werstler.
Report to the Board of Trustees Presented by: Ashton Cumberbatch, Bobby Jenkins, and Eliza May March 8, Community Bond Oversight Committee DRAFT.
Visitor Center Heritage Crossroads: Miles of History Heritage Highway  Designated in 2008 as a Florida Scenic Highway by Florida Department of Transportation.
Bond Oversight Committee Meeting Third Quarter October 29, 2013.
The Community Preservation Act in Harwich – July 28, 2004.
FAMILY LIFE CENTER Building Committee Update November 23, 2014.
Board Workshop G & H January 19, G & H Pre-Detail Design.
Preparing Project Recommendations For Town Meeting or City Council.
TOWN OF NORTH EAST NEW TOWN HALL AND HIGHWAY FACILITY September 2015.
IYM Site Envisioning & Building Committee Presentation for IYM Annual Meeting August 2003.
City of Rehoboth Beach Summary of Master Plan Consultations, Recommendations and Progress to date By Stan Mills for July 7 Board of Commissioner's Meeting.
Report to the Board of Trustees Presented by: Ashton Cumberbatch, Bobby Jenkins, and Eliza May November 23, Community Bond Oversight Committee.
Joint Meeting of the Parish Councils Embleton Craster Newton by the Sea 6th October 2014.
The Community Preservation Act. Open Space Historic Preservation Affordable Housing Allows communities to establish a dedicated fund for: The Community.
Weston Town Center Planning Committee Request for Funds for Concept & Feasibility Study.
1. ORLEANS CITIZENS FORUM – APRIL 7, 2016 PRESENTERS SELECTMEN SIMS McGRATH – PSBC LIAISON PROJECT HISTORY AND PROCESS POLICE CHIEF SCOTT MacDONALD BUILDING.
2007 DSISD School Bond Program DRIPPING SPRINGS INDEPENDENT SCHOOL DISTRICT Bond Election: November 6, 2007.
Hopkinton Community Preservation Commission & “The EMC House Project” John H Coolidge, Chairman Hopkinton CPC.
1.  Quick Overview of the History and Need  What is Planned for the Fire Department  What is Planned for the Police Department  Financial Details.
46 Springdale Avenue Springdale Study Committee Proposal for Future Use November 5, 2015.
ASHLAND TOWN HALL May 10, Ashland Town Hall  Dedicated April 12, 1955  Plan for the next 50+ years  Strategic Plan:  Initiative – Develop.
SPRING 2006 TOWN MEETING Bernard Lynch Town Manager May 1, 2006 Continued from Monday, April 24, 2006 & Thursday, April 27, 2006.
The Concord Community Preservation Committee
Concord Community Preservation Committee
2016 Presented by: Raffi Soghomonian
Community Center Study
2014 Bond Program October 22, 2016.
Preservation of Historically Significant Buildings
How to Build a Great Team
Article 41 Wastewater Planning Capacity Study
St. Marys Intracoastal Gateway.
Delta Water Supply Project
MSBA Feasibility Funding
Presentation transcript:

The Thayer Homestead Development Committee T Fall Town Meeting November 14, 2011

The Thayer Homestead Development Committee T The Thayer Homestead: Historical Significance The mills sites and other industry/properties were owned by the family. The mill, house, and Choate Park are connected. The site is favorably viewed for inclusion in the National Register of Historic Places.

The Thayer Homestead Development Committee T What has been done with the property to date? A Historic Structures Report was prepared and presented to the BOS (May2007). Newport Collaborative Architects and Custom Copper LLC were contracted to perform the Phase 1 stabilization work on the house and barn. The yard was cleared of trash, stumps and seeded for grass. This project was completed in early An informational kiosk was placed on the property as a Eagle Scout Project by Trevor Baker.

The Thayer Homestead Development Committee T In summer 2010 the BOS created the THDC to evaluate best use of the property. On October 25, 2010 the THDC recommended to the BOS that: –…it is in the best interests of the town to proceed with a renovation of the Thayer property that would allow greater use of the buildings and open space by citizens of the town. This would entail conducting a preliminary design and feasibility study to arrive at a plan and cost estimate. –…the BOS support a warrant article for the release of Community Preservation Funds to retain professional design services relating to Thayer property concepts. Such services would include, but not be limited to, exploring the uses for existing and future Thayer facilities and site, and estimating the renovation costs relating thereto. –Fall Town Meeting authorized spending $30,000 to hire an architectural firm to work with the THDC. Then THDC secured $14,000 in matching funds from the MA Historical Commission.

The Thayer Homestead Development Committee T Participant Members Dan Hooper, ChairCitizen-at-large Mark Wilcox, Vice ChairHistorical Society Mark CerelCommunity Preservation John ForestoBOS Marcia Kramarz Affordable Housing Robert PomponioHistorical Commission

The Thayer Homestead Development Committee T The design and feasibility study had the following goals: 1. Preserve the propertys historic character. 2. Preserve the scenic vistas to and from Choate Park. 3. Preserve the open space aspect of the yard. 4. Design for compatibility with existing buildings and functionality for community use. 5. Design to create a self-sustainable model for continued upkeep and expenses.

The Thayer Homestead Development Committee T Goal 1: Preserve the propertys historic character.

The Thayer Homestead Development Committee T Goal 2: Preserve the scenic vistas to and from Choate Park.

The Thayer Homestead Development Committee T Goal 3: Preserve the open space aspects of the yard.

The Thayer Homestead Development Committee T Goal 4: Design for compatibility with existing buildings and functionality for community use. Community Room

The Thayer Homestead Development Committee T Oak St/Rte 109 Intersection Route 109

The Thayer Homestead Development Committee T Goal 5: Design to create a self-sustainable model for continued upkeep and expenses. The THDC met with representatives of comparable venues. Sufficient revenue can be generated to offset operating expenses if the site is used as a banquet facility to host events both indoors and outside on the lawn. A caretaker apartment is recommended for both site management and security. Preliminary cost estimate: $2.0M - $2.3M

The Thayer Homestead Development Committee T Virtual Tour Tour the site

The Thayer Homestead Development Committee T Recommendation for Fall Town Meeting Warrant To see if the Town will vote to appropriate a sum of money ($150,000) from the Community Preservation Fund Account for the purpose of retaining the services of both a schematic design firm and professional project oversight for the Thayer Development Concept prepared by Davis Square and Associates to the Town-owned Thayer property at 2B Oak Street and authorize the Board of Selectmen, in consultation with the Community Preservation Committee, to enter into contract with professionals to perform said work, or take any other action relative thereto.

The Thayer Homestead Development Committee T Budget Budget: Renovations/Addition to Thayer Homestead Hard Costs Site work$498,060 Renovation of farmhouse$362,254 New Addition$1,141,807 TOTAL Hard Costs$2,002,121 Soft Costs Furniture, furnishings, and equipment (FF&E)$100,000 Owners project manager$85,000 Permits and approvals$5,000 Surveyor, cost estimate, geotech, consulting engineers$25,000 Construction testing$10,000 Legal$5,000 Reimbursables$10,000 Subtotal$240,000 Soft cost contingency – 15%$36,000 TOTAL Soft Costs$276,000 TOTAL PROJECT COSTS$2,278,121