Methodologies of monitoring and evaluating capacity development Makoto Kato Japan 1 UNFCCC Expert Workshop on Monitoring and Evaluating.

Slides:



Advertisements
Similar presentations
A Guide to Localizing the Hyogo Framework for Action
Advertisements

OECD World Forum Statistics, Knowledge and Policy, Palermo, November
1 Developing Tools for Measuring Performance, the GfD Contribution Working Group on Civil Service and Integrity IV Regional Meeting École Nationale dAdministration.
1 ESA/STAT/AC.219/8 Region-wide Programme to Improve Vital Statistics and Civil Registration Systems prepared by: Margarita F Guerrero, Ph D Regional Adviser.
1 Agenda item 4: Work modalities of the revised ISDR system to support the implementation of Hyogo Framework- Elements to be reviewed in groups- & prepare.
PRESENTATION AT THE WORKSHOP ON LDC PRIORITY NEEDS FOR TECHNICAL AND FINANCIAL COOPERATION 29 OCTOBER 2009 GENEVA Sari Laaksonen Coordinator, Integrated.
Application of the PROJECT CYCLE MANAGEMENT in Piedmont Region.
Gender Perspective in the Cycle of Operations
ROM reviews Saskia Van Crugten
Regions for Economic Change: Networking for Results LMP Workshop 3C: When exchanging is good for innovation: Experiences from the Lisbon Monitoring Platform.
Harmonized support to scaling up the national AIDS response Ini Huijts 7 th June 2006 ODI meeting, London.
Policies and Procedures for Civil Society Participation in GEF Programme and Projects presented by GEF NGO Network ECW.
Governance for REDD+ Crystal Davis Governance of Forests Initiative World Resources Institute REDD Civil Society Coordination Seminar CIFOR campus, Bogor.
South East Europe Investment Committee Work Programme and Communication Plan for th Meeting of the South East European Investment Committee Sarajevo,
Capacity Assessment and Monitoring in CD Support Projects in Solid Waste Management Sector Mitsuo YOSHIDA, Ph.D. Senior Advisor Institute for International.
Evaluating administrative and institutional capacity building
1FANIKISHA Institutional Strengthening Project First Author: Henry Kilonzo Second Author: Dr. Daraus Bukenya Enabling Kenyan Civil Society Organizations.
EuropeAid Co-operation Office Institutional Capacity Development Operations for the ACP Countries Unit AIDCO C4 Centralised Operations for the ACP Countries.
M&E in the GEF Aaron Zazueta GEF Evaluation Office Expanded Constituency Workshop Dalat, Vietnam - April 2011.
Climate change integration in EC development co-operation
Building up capacity for Roma inclusion at local level Kosice, November 6 th, 2013.
AN INTRODUCTION TO SPHERE AND THE EMERGENCY CONTEXT
Peter Tarfa Rio De Janeiro, Brazil 6-7 November 2008
National Disaster Capacity Building Project. Gregory Paragh Kathy-Ann Morain Kathy-Ann Morain Christine Lewis Christine Lewis Nazrul Hussain Nazrul Hussain.
Connections and issues in the European evaluation context Professor Murray Saunders President of the European Evaluation Society.
INITIATING THE PLANNING PROCESS. CONTENT Outputs from this stage Stage general description Obtaining government commitment Raising awareness Establishing.
Humberto F. Martins Public Management Secretary Presidency of the Republic of Brazil Seminar I Strengthening Country Capacity to Manage for Development.
Comprehensive M&E Systems
Project Cycle Management (PCM)
“Strengthening the National Statistical System of RM” Joint Project By 2011, public institutions with the support of civil society organizations (CSOs)
A Common Immigration Policy for Europe Principles, actions and tools June 2008.
1 “Adaptation to the consequences of Climate Change: Progress achieved and capacity building needed” Budapest, November 19-20, 2007 Strategic Environmental.
UNFCCC Meeting on experiences with performance indicators for monitoring and evaluation of capacity building in developing countries Rio De Janeiro, Brazil.
Evaluation plans for programming period in Poland Experience and new arrangements Ministry of Infrastructure and Development, Poland Athens,
Capacity development for Inclusive Green Growth Economy in Africa Expert Group Meeting on Enabling Measures for an Inclusive Green Economy in Africa 23.
1 RBM Background Development aid is often provided on a point to point basis with no consistency with countries priorities. Development efforts are often.
Development and Transfer of Technologies UNFCCC Expert Workshop On Technology Information Technology Transfer Network and Matchmaking Systems: a LA & C.
Owning Adaptation in the Pacific: Strengthening governance of climate adaptation finance Presentation to 9th Regional Policy Briefing Sarah Meads, Senior.
1 Mid-Term Review of the Hyogo Framework for Action Roadmap to Disaster Risk Reduction in the Americas & HFA Mid-Term Review.
Country’s experience in building and monitoring capacities in climate change area. Albania case Ermira Fida Manager Climate Change Program, Albania UNFCCC.
Financing for National Communications UNFCCC Workshop, Manila Ravi Sharma United Nations Environment Programme – Global Environment Facility.
Pilot Project IEC Materials for Child Friendly City Endah Sri Rejeki INDONESIA.
Sub-Regional Workshop for GEF Focal Points in West and Central Africa Accra, Ghana, 9-11 July 2009 Tracking National Portfolios and Assessing Results.
UNDAF M&E Systems Purpose Can explain the importance of functioning M&E system for the UNDAF Can support formulation and implementation of UNDAF M&E plans.
MAINSTREAMING MONITORING AND EVALUATION IN EDUCATION Can education be effectively managed without an M & E system in place?
The GEF/UNDP/UNEP National Communications Programme for Climate Change United Nations Development Programme UNFCCC Workshop on the Preparation of National.
SECTION IV: GENERAL DESCRIPTION OF STEPS TAKEN OR ENVISAGED BY NON-ANNEX I PARTY TO IMPLEMENT THE CONVENTION Workshop on the Use of the Guidelines for.
Participatory Planning Project Cycle Management (PCM)
Policies and Procedures for Civil Society Participation in GEF Programme and Projects presented by GEF NGO Network ECW.
WHO EURO In Country Coordination and Strengthening National Interagency Coordinating Committees.
Reduction of Mercury in Products Action Plans. 2 Action Plan  describes the activities to be carried out and the related implementation strategies for.
Vito Cistulli - FAO -1 Damascus, 2 July 2008 FAO Assistance to Member Countries and the Changing Aid Environment.
Possible role of TNAs in the context of the implementation of the Technology Mechanism Wytze van der Gaast UNFCCC workshop on technology needs assessment.
‘ By Abdou Karim LO Minister of State for Reform and Technical Assistance AfCoP/MfDR Co-Chair.
Focus on Governance and territorial achievements in Leader Plus period European Commission Évora, Portugal, 2007 Jela Tvrdonova.
What is CSO Development Effectiveness? Presentation at the European Seminar on CSO Development Effectiveness, Vienna, 10 and 11 March 2010.
Paul Desanker Financial and Technical Support UNFCCC secretariat Workshop background Expert Workshop on Monitoring and Evaluating.
DEVELOPING THE WORK PLAN
UNDP Guidance for National Communication Project Proposals UNFCCC Workshop on the Preparation of National Communications from non-Annex I Parties Manila,
27/04/2017 Strengthening of the Monitoring and Evaluation system for FTPP/FTTP in FAO /SEC December 2015 FTPP/FTFP Workshop, Bishkek, Kyrgyzstan.
Managing the National Communications Process UNFCCC Workshop on Exchange of Experiences and Good Practices among NAI Countries in Preparing NCs September.
PUENTE IN THE CARIBBEAN PROGRAMME PHASE 2: Internship on Social Protection Strategies. October 26 November 3, 2009 Santiago, Chile. Presentation: Progress.
Capacity Development Results Framework A strategic and results-oriented approach to learning for capacity development.
Comprehensive M&E Systems: Identifying Resources to Support M&E Plans for National TB Programs Lisa V. Adams, MD E&E Regional Workshop Kiev, Ukraine May.
International Land Coalition Advancing the Monitoring of Land Governance for Ensuring Impact on Poverty Reduction Annalisa Mauro.
Project: EaP countries cooperation for promoting quality assurance in higher education Maria Stratan European Institute for Political Studies of Moldova.
Project Cycle Management
Cambodia National Work Plan
EuropeAid Co-operation Office
Helene Skikos DG Education and Culture
Presentation transcript:

Methodologies of monitoring and evaluating capacity development Makoto Kato Japan 1 UNFCCC Expert Workshop on Monitoring and Evaluating Capacity-Building in Developing Countries Rio de Janeiro, Brazil, 6-7 November, 2008

Outline Defining Capacity, and Capacity Development Methodologies and Tools for Monitoring and Evaluating Capacity Development Comparison? M&E at national level? Uniqueness of Capacity Development in Climate Change area 2

Defining Capacity, and Capacity Development Capacity: Developing countries ability to cope with challenges by their own organization and actions. Capacity development: Process in which such capacity is being strengthened and sustained at individual, institutional, and society levels as a whole. 3 Source: JICA 2006

Capacity at different levels (Capacity Development must be comprehensive) Individual Level Institutional Level Society Level Source: JICA Administrators Capacity Enhancement Strengthened Management of Waste Control Authority Consensus in Burden sharing by different stakeholders New Waste Segregation Rules Policy Goals toward Waste Reduction Awareness raised about Waste Reduction

Different Approaches to Capacity Development (Capacity Development should be country-driven and sustainable) Existing Capacity External Input (Incl. Knowledge Sharing) External Capital Transfer Level of Capacity necessary to cope with challenges Approach A: Transfer of capacity from external player (Filling a Gap with external capital transfer) Approach B: Developing capacity with external facilitation(building capacity under the ownership of host countries/communities) Source: JICA Not Sustainable More Sustainable

Key Drivers of Capacity Development Ownership Enabling Environment Incentives Leadership Knowledge 6

7 Methodologies and Tools for Monitoring and Evaluating Capacity-Building (1) Plan Implementation Evaluation Identification Formulation Preparation Implementation / Monitoring Evaluation Flow of M&E Conceptual Figure of Project Cycle Management(PCM)

8 Where indicators are used: Format of Project Design Matrix PDM Narrative SummaryIndicatorsMeans of Verification Important Assumption Overall Goal Project Objective Outputs Activities Inputs Pre-conditions Methodologies and Tools for Monitoring and Evaluating Capacity-Building (2) Vertical Logical Relationship ---

Cause Effect How Overalls Goals/project objectives and Indicators are made? Problem Tree Core Problem Methodologies and Tools for Monitoring and Evaluating Capacity-Building (3)

Expected Situations Feasibility Means Ends Core Objective Methodologies and Tools for Monitoring and Evaluating Capacity-Building (3) How Overalls Goals/project objectives and Indicators are made? Objective Tree

Methodologies and Tools for Monitoring and Evaluating Capacity-Building capacity assessment Evaluation is heavily dependent on Target Setting (based on capacity assessment) Target in different levels: Overall Goal, Objectives of Efforts (eg. Policy/Programme/Project objectives) Indicators are useful only if/when they are elaborated with means of verification, important assumption and pre- condition (used in PDM) M&E are properly done by Project Owners (and contracted external evaluators) 11

Can we compare? Same type Projects in 2 different countries 12 Country A Country B Project XProject Y Development Priority Governance Structure Existing Capacity Other attributes (eg, Size) Development Priority Governance Structure Existing Capacity Other attributes (eg, Size) Comparison is only useful for drawing lessons from Good Practices (Simple replication does not happen)

Can we compare? Same type Projects in the same country 13 Country C Project Q Project P Development Priority Governance Structure Existing Capacity Other attributes (eg, Size) (Internal Factors) Willingness of Stakeholders Entry point of Efforts etc. (Internal Factors) Willingness of Stakeholders Entry point of Efforts etc. Easier to compare the two, since the external factors are the same or similar. But still internal factors of projects should be taken into account.

Can we compare? M&E at National Level Accuracy of Comparison (Evaluation) Project level>Programme level>Policy level> Regional/International Network (At higher level, quantified indicators may omit useful qualified information) Methods of M&E We use the same M&E methods(some variety), but indicators are more tailor-made Pre-condition of Defining Indicators Capacity Assessment (jointly done by D-ing+D-ed countries) is crucial Assessment(BAU) Monitoring(Indicators) Evaluation (Indicators) must be coherent, and reflect a specific context. 14

Narrative SummaryIndicatorsMeans of Verification Important Assumption Overall Goal Project Objective Outputs Activities Inputs Pre-conditions - - Uniqueness of Capacity Development in Climate Change area 15 This Area is already decided by 2/CP7. Fill in one of the 15 scopes e.g. (promotion of) CDM - Entry points of such efforts are different by host countries. Host countries chose such entry point, jointly with our Agencies.

Conclusion from our practice A single methodology (with variation) for M&E is used. Indicators are used and functions in specific context (within PDM), and simple aggregation of evaluation results is strictly avoided. Indicators are useful to interpret lessons from Good Practices. Evaluation at larger level employs more qualitative/narrative way. Entry points of efforts are different by countries, and it affects selection of indicators. For climate change, we approach both from Overall Goal and from the bottom side of PDM( and it still works). 16