DRAFT Installed Capacity Requirement (ICR) and Related Values for the 2014/15 Forward Capacity Auction (FCA5) Maria Agustin.

Slides:



Advertisements
Similar presentations
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Advertisements

ASM Phase II Real Time Dispatch and Reserve Constraint Penalty Factors rev2.0 NEPOOL Markets Committee June 28/29, 2005 Jim Milligan ISO-NE Markets Development.
Historical Hydro-Quebec Phase II Flow and Transfer Capability Limit Data Peter Wong, ISO New England Power Supply Planning Committee Meeting June 4, 2007.
Advanced Piloting Cruise Plot.
1
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
Electricity and Natural Gas Supply, Reserves, and Resource Adequacy CMTA Energy Conference Energy: Growing Californias Economy William J. Keese California.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
UNITED NATIONS Shipment Details Report – January 2006.
Business Practices Subcommittee Update April 30, 2013.
Business Practices Subcommittee Update August 17, 2010.
Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff.
Pacific Gas and Electric Company Long Term Procurement Plan Proceeding Renewable Integration Model Results and Model Demonstration October 22, 2010 Workshop.
Market Interface Committee Recent Regulatory Activities Philip Tice October 14, 2011.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
1 Analysis of the use of Multipliers as a substitute for Set-Asides December 6, 2007 Presentation at FPSC Staff Workshop on RPS Bob McGee, Marketing Services.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 10 second questions
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
PP Test Review Sections 6-1 to 6-6
© 2013 Day Pitney LLP Overview and Update on the Ever-Evolving New England Wholesale Capacity Market presentation to Boston Bar Association May 23, 2013.
1 Overview. 2 Benefits of RATC Applications Real-time corrective Hour ahead corrective and preventive Day ahead corrective Day ahead market/economic based.
EU market situation for eggs and poultry Management Committee 20 October 2011.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
Bright Futures Guidelines Priorities and Screening Tables
DECEMBER 17, 2013 | WESTBOROUGH, MA Reliability Committee & Transmission Committee & Markets Committee Capacity Zone Modeling Al McBride MANAGER, AREA.
2 |SharePoint Saturday New York City
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
VOORBLAD.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Copyright © 2013 The Brattle Group, Inc. ISO-NE Offer Review Trigger Prices 2013 Study Final Results NEPOOL Markets Committee Sam Newell September 10,
CUG Meeting June 3 – 5 Salt Lake City, UT
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
© 2012 National Heart Foundation of Australia. Slide 2.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
SEPTEMBER 12, 2012 | MARKETS COMMITTEE Aleks Mitreski MARKET DEVELOPMENT (413) Hourly Offer and Intraday.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
International Accounting Standard 33
Januar MDMDFSSMDMDFSSS
Analyzing Genes and Genomes
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Congestion Management Settlement Credits December, 2002.
Weekly Attendance by Class w/e 6 th September 2013.
Al McBride MANAGER, AREA TRANSMISSION PLANNING Existing Import Interfaces: Transmission Transfer Capabilities and The Calculation of Tie Benefits DECEMBER.
Energy Generation in Mitochondria and Chlorplasts
OCTOBER 8, 2014 Bob Laurita INTERNAL MARKET MONITORING New Import Capacity Resource FCM Market Power Mitigation Order to Show Cause Compliance Filing.
Announcements Be reading Chapters 9 and 10 HW 8 is due now.
ERCOT Planning WMS 10/20/2010 Target Reserve Margin and Effective Load Carrying Capability of Installed Wind Capacity for the ERCOT System – Methodology.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Presentation transcript:

DRAFT Installed Capacity Requirement (ICR) and Related Values for the 2014/15 Forward Capacity Auction (FCA5) Maria Agustin

DRAFT © 2011 ISO New England Inc. 2 Objective of this Presentation Present the ISO New England recommended Installed Capacity Requirement (ICR), Local Sourcing Requirements (LSR) and Maximum Capacity Limit (MCL) for the 2014/15 Capacity Commitment Period. Share the results of ICR scenarios studied. Review load, capacity and transmission assumptions used to simulate the New England bulk power supply system for calculating the ICR and Related Values, if necessary.

DRAFT © 2011 ISO New England Inc /15 ICR Schedule PSPC review of assumptions – Oct 28 - Dec 9, 2010 PSPC review of ISO recommendation of ICR values – Jan 6 &13, 2011 RC review/vote of ISO recommendation of ICR values – Jan 18, 2011 PC review/vote of ISO recommendation of ICR values – Feb 4, 2011 File with the FERC – by Mar 4, 2011 FCA5 – Jun 6, 2011

DRAFT ICR Scenarios of Tie Benefits Case 1: ISO Proposed Methodology with New Brunswick import at 700 MW and Cross-Sound Cable (CSC) at 0 MW and internal constraints modeled Case 2: ISO Proposed Methodology with New Brunswick import at 1,000 MW and CSC at 330 MW and internal constraints modeled Case 3: Existing Tie Benefits Methodology with New Brunswick import at 1,000 MW and CSC at 330 MW; no internal constraints modeled © 2011 ISO New England Inc. 4

DRAFT Why these Scenarios were Chosen Case 1 represents the methodology filed at the FERC with New Brunswick & CSC interfaces modeled with their import capability as determined by recent ISO Transmission Planning studies Case 2 represents the methodology filed at the FERC but noting that protests may be filed to model the New Brunswick & CSC interfaces at 1,000 MW & 330 MW Case 3 represents the existing tie benefits methodology in the event that the FERC requires additional time to review the proposed Tie Benefits Calculation Methodology © 2011 ISO New England Inc. 5

DRAFT ISO Proposed ICR Values The ISO proposes the ICR and Related Values associated with the Case 1 Scenario for the 2014/2015 FCA. These values reflect the tie benefits that are calculated according to the methodology that was filed with the Federal Energy Regulatory Commission (FERC) on December 30, For a copy of the FERC filing, please see: © 2011 ISO New England Inc. 6

DRAFT ISO Recommended ICR and Related Values (MW) for 2014/2015 * Total Resources for New England excludes HQICCs © 2011 ISO New England Inc. 7

DRAFT Comparison of ICR Values (MW) - FCA5 Versus FCA4 © 2011 ISO New England Inc. 8 * Total Resources for New England excludes HQICCs

DRAFT Effect on ICR of Assumptions © 2011 ISO New England Inc. 9

DRAFT ICR Scenarios © 2011 ISO New England Inc. 10 ALCC is the Additional Load Carrying Capability used to bring the system to the 0.1 Reliability Criterion.

DRAFT LRA/MCL Load Zone Determination LRA and MCL has only been calculated for the three load zones which have previously been identified as import or export constrained. © 2011 ISO New England Inc. 11

DRAFT LRA Scenarios - Connecticut © 2011 ISO New England Inc. 12

DRAFT LRA Scenarios –NEMA/Boston © 2011 ISO New England Inc. 13

DRAFT LSR for Connecticut & NEMA/Boston Zones LSR is set by the TSA, which is higher than the LRA for both Connecticut and NEMA/Boston Zones Connecticut –LRA = 7,434 MW –TSA = 7,478 MW –LSR = 7,478 MW NEMA/Boston –LRA = 2,549 MW –TSA = 3,046 MW –LSR = 3,046 MW © 2011 ISO New England Inc. 14

DRAFT MCL Scenarios – Maine © 2011 ISO New England Inc. 15

DRAFT © 2011 ISO New England Inc. 16 Questions?

DRAFT © 2011 ISO New England Inc. 17 Assumptions for the ICR Calculation for the 2014/15 FCA

DRAFT © 2011 ISO New England Inc. 18 Modeling the New England Control Area The New England ICR are calculated using the GE MARS model –Internal transmission constraints are not modeled. All loads and resources are assumed to be connected to a single electric bus. –Internal transmission constraints are addressed through Local Sourcing Requirements and Maximum Capacity Limits.

DRAFT © 2011 ISO New England Inc. 19 Assumptions for the 2014/15 ICR Load Forecast –Load Forecast distribution Resource Data –Existing Qualified Generating Capacity Resources –Existing Qualified Intermittent Power Capacity Resources –Existing Qualified Import Capacity Resources and Known Sales –Existing Qualified Demand Resources (DR) Resource Availability –Generating Resources Availability –Intermittent Power Resources Availability –Demand Resources Availability Load Relief from OP 4 Actions –Tie Reliability Benefits HQICCs Maritimes New York –5% Voltage Reduction

DRAFT © 2011 ISO New England Inc. 20 Load Forecast Data Load forecast assumption from the 2010 CELT Report Load Forecast The load forecast weather related uncertainty is represented by specifying a series of multipliers on the peak load and the associated probabilities of each load level occurring –derived from the 52 weekly peak load distributions described by the expected value (mean), the standard deviation and the skewness.

DRAFT © 2011 ISO New England Inc. 21 Load Forecast Data – New England System Load Forecast Probability Distribution of Annual Peak Load (MW) Monthly Peak Load (MW) – 50/50 Forecast There is a distribution associated with each monthly peak. The distribution associated with the Summer Seasonal Peak (July & August) is show below:

DRAFT © 2011 ISO New England Inc. 22 Resource Data – Existing Qualified Generating Capacity Resources (MW) Winter Generation values shown for informational purposes, only summer values are modeled. Intermittent Resources have both summer and winter values modeled.

DRAFT © 2011 ISO New England Inc. 23 Resource Data – Existing Qualified Import Capacity Resources Imports modeled with tie line forced outage rates of 3% for HQ Phase II, 1 % for Highgate and 0% for New York ties. Total EFORd is the weighted average using the Summer Capacity. The VJO contracts are modeled with delist bids to reflect the value of the firm contract. MRI III (c) states that all Existing Import Capacity Resources backed by a multiyear contract to provide capacity in the New England Control Area shall be modeled in the ICR calculation

DRAFT © 2011 ISO New England Inc. 24 Resource Data – Known Sales (MW) Modeled as removed capacity from the resource supplying the export.

DRAFT © 2011 ISO New England Inc. 25 Resource Data – Existing Qualified Demand Resources (MW) The DR capacity modeled in the ICR is the Summer Existing Qualified DR Capacity by Load Zone for FCA5. The Qualified Capacity rating of DR includes the Transmission and Distribution (T&D) Loss Adjustment (Gross-up) of 8%.

DRAFT Resource Data Used in the LRA Calculation (MW) © 2011 ISO New England Inc. 26

DRAFT © 2011 ISO New England Inc. 27 Availability Assumptions - Generating Resources Forced Outages Assumption –Each generating units Equivalent Forced Outage Rate on Demand (non-weighted EFORd) modeled –Based on a 5-year average (September 2005 – August 2010) of generator submitted Generation Availability Data System (GADS) data –NERC GADS Class average data will be used for immature units Scheduled Outage Assumption –Each generating unit weeks of Maintenance modeled –Based on a 5-year average (September 2005 – August 2010) of each generators actual historical average of planned and maintenance outages scheduled at least 14 days in advance –NERC GADS Class average data will be used for immature units

DRAFT © 2011 ISO New England Inc. 28 Availability Assumptions - Generating Resources Assumed summer MW weighted EFORd and Maintenance Weeks are shown by resource category for informational purposes. In the LOLE simulations, individual unit values are modeled.

DRAFT © 2011 ISO New England Inc. 29 Availability Assumptions - Intermittent Power Resources Intermittent Power Resources are modeled as 100% available since their outages have been incorporated in their 5-year historical output used in their ratings determination.

DRAFT Availability Assumptions - Demand Resources DR Performance analysis calculated for the FCA4 ICR Applied to Existing Qualified DR for FCA5 © 2011 ISO New England Inc. 30

DRAFT Transmission Interface Limits Modeled in LRA © 2011 ISO New England Inc. 31 CT Import updated to reflect the impact of the Greater Springfield Reliability Project Boston Import does not reflect the permanent de-list of the Salem Harbor station Maine-New Hampshire transfer limit does not reflect the impact of the Maine Power Reliability Project as it has not been certified to be in-service prior to FCA5

DRAFT © 2011 ISO New England Inc. 32 OP 4 Assumptions - Tie Reliability Benefits Modeled with Forced Outage assumptions of 3% for Québec, 1% for Maritimes, and 0% for New York due to tie line availability.

DRAFT OP 4 Assumptions - Action 6 and 8 Voltage Reduction (MW) 1.5% OP 4 Appendix A assumption developed by ISO Operations Calculated as (Peak Load MW – Passive DR MW) * 1.5% © 2011 ISO New England Inc. 33

DRAFT Tie Benefit Scenarios Summary of ICR Resources (Summer MW) © 2011 ISO New England Inc. 34 Notes: Generating Resources is the summer Qualified Capacity values. Intermittent Power Resources have both the summer and winter capacity values modeled. Demand Resources is the Summer Qualified value which includes the Transmission & Distribution gross-up. Import Resources are modeled with the value of the firm VJO contract reflected. OP 4 Voltage Reduction includes both Action 6 and Action 8 MW assumptions. Minimum Operating Reserve of 200 MW is the minimum Operating Reserve requirement for transmission system security.

DRAFT © 2011 ISO New England Inc. 35 Questions?