Capacity After deciding what products/services should be offered and how they should be made, management must plan the capacity of its processes. Capacity.

Slides:



Advertisements
Similar presentations
1 EMBA-2, BUP EO Strategic Capacity Planning.
Advertisements

Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 1 Strategic Capacity Management.
6 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Capacity Planning 6 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Process.
Halil SATIK Industrial Engineering Department, Dokuz Eylul University, Turkey.
CAPACITY PLANNING FOR PRODUCTS AND SERVICES.
Capacity Management Planning the resource capacity that a firm will need to meet its demand.
Managing Capacity.
Capacity Planning.
Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.
6 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Capacity Planning 6 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
Constraint Management
6 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Capacity Planning (Long-Term Capacity Planning) 6.
PRODUCTION AND OPERATIONS MANAGEMENT
Capacity Planning For Products and Services
Capacity Planning For Products and Services
Chapter 5 Strategic Capacity Planning
Capacity and Constraint Management
Capacity Planning Chapter 6
Capacity and Constraint Management
© 2004 by Prentice Hall, Inc., Upper Saddle River, N.J S 7-1 Operations Management Capacity Planning Supplement 7.
Chapter 5 Capacity Planning For Products and Services
Strategic Capacity Planning for Products and Services
Fundamentals of Cost Analysis for Decision Making
MD707 Operations Management Professor Joy Field
6 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Capacity Planning 6 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
6 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Capacity Planning Chapter 6.
© 2007 Pearson Education Constraint Management Chapter 7.
Capacity Planning Manufacturing : Inventory can be used to cushion fluctuations in demand More focused on machinery as a constraint than people Services.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 5 Capacity Planning For Products and Services.
Capacity planning.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Chapter 8.
CAPACITY LOAD OUTPUT.
Strategic Capacity Planning for Products and Services
KR: Chapter 8 Capacity. Chapter Outline Introduction Measures of capacity Capacity unit Peak capacity vs. effective capacity Bottleneck Economies of scale.
Operations Management Capacity Planning Supplement 7
For Products and Services
Operations Management
Operations Planning Horizons
To Accompany Ritzman & Krajewski, Foundations of Operations Management © 2003 Prentice-Hall, Inc. All rights reserved. Chapter 6 Capacity.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Process.
PowerPoint presentation to accompany Heizer/Render - Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
S7 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall Process Strategies ( process, repetitive, product) The objective of the process strategy.
C A P A C I T Y Dr. Dewi Nusraningrum, M.Si. CAPACITY PLANNING - Capacity is the maximum rate of output for a facility. - Capacity planning is central.
Capacity Planning.
Capacity Planning. Capacity Capacity (I): is the upper limit on the load that an operating unit can handle. Capacity (I): is the upper limit on the load.
© 2007 Pearson Education Constraint Management Chapter 7.
Tata McGraw CHAPTER 5 Strategic Capacity Management.
CHAPTER 8 CAPACITY. THE CONCEPT Maximum rate of output for a process Inadequate capacity can lose customers and limit growth while excess capacity can.
Strategic Capacity Planning for Products and Services McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Capacity Planning Pertemuan 04
Constraint Management Students should be able to: 1.Assess the capacity of a process 2.Define the Theory of Constraints and explain how to use it. 3.Identify.
 Capacity is the ability of a process or system to hold, receive, store or accommodate.  In business terms, it is the amount of output that a system.
5-1Capacity Planning William J. Stevenson Operations Management 8 th edition.
Capacity Planning.
Chapter 3: Strategic Capacity Management
Operations Management
Strategic Capacity Management
For Products and Services
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
Constraint Management
Chapter 3: Strategic Capacity Management
Capacity Planning For Products and Services
Capacity Planning For Products and Services
Stevenson 5 Capacity Planning.
Planning Capacity Chapter 4.
Capacity Planning For Products and Services
Production and Operations Management
Capacity Planning For Products and Services
Presentation transcript:

Capacity After deciding what products/services should be offered and how they should be made, management must plan the capacity of its processes. Capacity is the maximum rate of output for a process. Must have capacity to meet current and future demands. Long-term capacity plans deal with investments in new facilities and equipment. Short-term capacity plans focus on workforce size, overtime budgets, and inventories. This presentation covers the material in Chapter 8, Capacity. The graphic is a mock decision tree. 1

Capacity Planning This activity is central to the long-term success of an organization. Too much capacity can be as problematic as too little Capacity planning considers questions such as: How much of a cushion is needed? Should we expand capacity before the demand is there or wait until demand is more certain?

Capacity Planning Capacity can be defined as the ability to hold, receive, store, or accommodate. Strategic capacity planning is an approach for determining the overall capacity level of capital intensive resources, including facilities, equipment, and overall labor force size.

Measuring capacity No single capacity measure is universally applicable. Capacity can be expressed in terms of outputs or inputs. Output measures—the usual choice for line flow processes, usually high-volume Low amount of customization Product mix becomes an issue when the output is not uniform in work content. Input measures—used for flexible flow, low-volume processes High amount of customization Output varies in work content; a measure of total units produced is meaningless. Output is converted to some critical homogeneous input, such as labor hours or machine hours.

Utilization Fabrication can make 100 engines/day Management wants 45 engines/day Currently producing 50 engines/day Utilizationpeak = Average output rate Peak capacity x 100% And this is the basic equation for Utilization. In this application we are looking at utilization with respect to the designed capacity of the system. Utilizationeffective = Average output rate Effective capacity x 100% 4

Utilization Fabrication can make 100 engines/day Management wants 45 engines/day Currently producing 50 engines/day 50 100 Utilizationpeak = x 100% = 50% We solve for the utilization. 50 45 Utilizationeffective = x 100% = 111% The average output rate and the capacity must be measured in the same terms. 9

Types of Capacity Peak capacity Effective capacity Calling for extraordinary effort under ideal conditions that are not sustainable Allows for downtime for maintenance and repair. Engineering assessment of maximum annual output Effective capacity Economically sustainable under normal conditions

Utilization This slide presents the output of the OM Explorer Capacity Utilization analysis showing the same results we obtained manually What does it mean? Even through the department falls well short of peak capacity, it is well beyond the output rate judged to be most economical. It’s operations could be sustained at that level only through the use of considerable overtime; capacity expansion should be evaluated. 13

Utilization Utilizationpeak = 50% Utilizationeffective = 111% Capacity cushion – amount of reserve capacity that a firm maintains to handle sudden increases in demand or temporary loss of production capacity. We find the capacity cushions are as shown. This might support an extended discussion of the implications of a negative capacity cushion. Capacity cushionpeak = 100% – 50% = 50% Capacity cushioneffective = 100% – 111% = – 11% 13

Best Operating Level Average unit cost of output Underutilization Overutilization Best Operating Level Volume 4

Capacity Bottlenecks “A bottleneck is an operation that has the lowest effective capacity of any operation in the facility and thus limits the system’s output.” Inputs To customers (a) Operation 2 a bottleneck 50/hr 1 2 3 200/hr This slide and the next are based on Figure 8.2. The Figure is shown in two sections to improve legibility. 14

Capacity Bottlenecks 2 3 1 Inputs To customers 200/hr (b) All operations bottlenecks In effect, the process can produce only as fast as the slowest operation. True expansion of a process’s capacity occurs only when bottleneck capacity is increased. In the first slide, adding capacity at Operation 1 or 3 will not impact system capacity. However, when adding capacity to Operation 2, must then increase capacity at all 3 operations to increase capacity further. To increase capacity: new equipment, new facilities, expanded operating hours, increased shifts, increased work hours, or redesign the process 15

Theory of Constraints Focus is on whatever impedes, (i.e., bottlenecks) progress toward the goal of maximizing flow of total value-added funds (sales less discounts and variable costs) The focus on bottlenecks is the means to increase throughput and, consequently, the flow of value added funds. The performance of the overall system is a function of how bottleneck operations or processes are scheduled.

Theory of Constraints Short-term: overtime, temporary employees, outsource Increase effective capacity utilization at bottlenecks without experiencing the higher costs and poor customer service usually associated with maintaining output rates at peak capacity. Carefully monitor short-term schedules, minimize idle time, setups (changes from one product to another).

Theory of Constraints Identify the system bottleneck(s) Exploit the bottleneck(s) Subordinate all other decisions to step 2 Elevate the bottleneck(s) Do not let inertia set in This slide presents the basic elements of the Theory of Constraints as listed in the text. 14

Economies of Scale Increasing output rate decreases the average unit cost Fixed costs are spread over more units Construction costs are reduced Costs of purchased materials are cut Process advantages are found

Diseconomies of Scale When the average costs per unit increases as the facility’s size increases. Excessive size can bring complexity, loss of focus, and inefficiencies, which raise the average unit cost. Characterized by loss of agility, less innovation, risk avoidance, and excessive analysis and planning at the expense of action. Nonlinear growth of overhead leads to employee ceilings.

Average unit cost (dollars per patient) Economies and Diseconomies of Scale Best operating level is 500-beds; optimal depends on number of patients per week. 250-bed hospital 750-bed hospital 500-bed hospital Average unit cost (dollars per patient) The extended overall cost curve shows diseconomies of scale in this size range. Economies of scale Diseconomies of scale Output rate (patients per week) 21

Capacity strategy Sizing capacity cushions Average utilization rates near 100% indicate: Need to increase capacity Poor customer service or declining productivity Utilization rates tend to be higher in capital-intensive industries.

Capacity Strategy Factors Leading to Large Capacity Cushions When demand is variable, uncertain, or product mix changes When finished goods inventory cannot be stored When customer service is important When capacity comes in large increments When supply of material or human resources is uncertain Factors leading to small capacity cushions Unused capacity costs money. Large cushions hide inefficiencies, absenteeism, unreliable material supply. When subcontractors are available to handle demand peaks

Capacity Strategy Timing and sizing of expansion Expansionist strategy Keeps ahead of demand, maintains a capacity cushion Large, infrequent jumps in capacity Higher financial risk Lower risk of losing market share Economies of scale may reduce fixed cost per unit May increase learning and help compete on price Preemptive marketing

Capacity Strategy Wait-and-see strategy Lags behind demand, relying on short-term peak capacity options (overtime, subcontractors) to meet demand Lower financial risk associated with overly optimistic demand forecast Lower risk of a technological advancement making a new facility obsolete Higher risk of losing market share Follow-the-leader strategy An intermediate strategy of copying competitors’ actions Tends to prevent anyone from gaining a competitive advantage

Capacity Strategies Forecast of capacity required Planned unused capacity Forecast of capacity required Capacity increment Capacity Time between increments We add in the details describing the various components of the graph. Time (a) Expansionist strategy 26

Capacity Strategies Forecast of capacity required Planned use of short-term options Forecast of capacity required Capacity increment Capacity Time between increments The detailed descriptions are added in this slide. Time (b) Wait-and-see strategy 29

Linking Capacity and Other Decisions Competitive Priorities Quality Management Capital Intensity Resource Flexibility Inventory Scheduling The authors present a systematic approach to capacity decisions and this series of slides supports that discussion. This slide advances automatically. 30

[Dp + (D/Q)s]product 1 + ... + [Dp + (D/Q)s]product n Capacity Decisions Estimate Capacity Requirements Item Client X Client Y Annual demand forecast (copies) 2000.00 6000.00 Standard processing time (hour/copy) 0.50 0.70 Average lot size (copies per report) 20.00 30.00 Standard setup time (hours) 0.25 0.40 We need to determine the number of machines required for this set of tasks. This is the basic equation. Note, this has been shortened from the example in the book due to space limitations. [Dp + (D/Q)s]product 1 + ... + [Dp + (D/Q)s]product n N[1 – (C/100)] M = 32

(250 days/year)(1 shift/day)(8 hours/shift)(1.0 – 15/100) Capacity Decisions Estimate Capacity Requirements Item Client X Client Y Annual demand forecast (copies) 2000.00 6000.00 Standard processing time (hour/copy) 0.50 0.70 Average lot size (copies per report) 20.00 30.00 Standard setup time (hours) 0.25 0.40 This slide allows for a detailed discussion of the equation. M = [2000(0.5) + (2000/20)(0.25)]client X + [6000(0.7) + (6000/30)(0.4)]client Y (250 days/year)(1 shift/day)(8 hours/shift)(1.0 – 15/100) 34

Capacity Decisions Estimate Capacity Requirements Item Client X Client Y Annual demand forecast (copies) 2000.00 6000.00 Standard processing time (hour/copy) 0.50 0.70 Average lot size (copies per report) 20.00 30.00 Standard setup time (hours) 0.25 0.40 The equation is solved and the number of machines is known. Notice the rounding up, necessary to actually meet the capacity requirements. M = = 3.12  4 machines 5305 1700 Example 8.2 35

Capacity Decisions Identify Capacity Gaps Kitchen capacity = 80,000 meals Dining room capacity = 105,000 meals Demand Year 1: 90,000 meals Year 2: 100,000 meals Year 3: 110,000 meals Year 4: 120,000 meals Year 5: 130,000 meals Kitchen Capacity Gaps Year 1: 90,000 – 80,000 = 10,000 Year 2: 100,000 – 80,000 = 20,000 Year 3: 110,000 – 80,000 = 30,000 Year 4: 120,000 – 80,000 = 40,000 Year 5: 130,000 – 80,000 = 50,000 This slide completes the analysis for all five years. 41

Capacity Decisions Identify Capacity Gaps Kitchen capacity = 80,000 meals Dining room capacity = 105,000 meals Demand Year 1: 90,000 meals Year 2: 100,000 meals Year 3: 110,000 meals Year 4: 120,000 meals Year 5: 130,000 meals Dining Room Capacity Gaps Year 1: no gaps Year 2: no gaps Year 3: 110,000 – 105,000 = 5,000 Year 4: 120,000 – 105,000 = 15,000 Year 5: 130,000 – 105,000 = 25,000 And this slide completes the analysis. 45

Expand capacity to meet expected demand through Year 5 Capacity Decisions Evaluate Alternatives Expand capacity to meet expected demand through Year 5 Year Demand Cash Flow 1 90,000 (90,000 – 80,000)2 = $20,000 2 100,000 (100,000 – 80,000)2 = $40,000 3 110,000 (110,000 – 80,000)2 = $60,000 4 120,000 (120,000 – 80,000)2 = $80,000 5 130,000 (130,000 – 80,000)2 = $100,000 This slide completes the analysis. It might be important to stress that such an analysis is only valuable in-so-far as it is measured against other alternatives or some pre-defined standard. Students with some background in finance might point out that this is a simplistic example but as long as one methodology is applied consistently, the comparison between alternatives should be meaningful. 50

Capacity Decisions Evaluate Alternatives This slide shows the results of this analysis using the OM Explorer software. 50

Capacity Decisions Simulation TIME TO PERFORM (SECONDS) Standard OPERATION Average Deviation Review renewal application for correctness 15 3 Check file for violations and restrictions 60 15 Process and record payment 25 6 Conduct eye test 35 10 Photograph applicant 20 5 Issue temporary license 30 5 The example starts with the basic data about the operation. AVERAGE CUSTOMER ARRIVAL TIME (PEOPLE PER MINUTE) 8:00 A.M. — 9:00 A.M. 1.25 9:00 A.M. — 12:00 P.M. 0.75 12:00 P.M. — 1:00 P.M. 2.00 1:00 P.M. — 4:00 P.M. 0.75 51

Capacity Decisions Bottleneck These two slides support Solved Problem 1 at the end of the Chapter. 51

Capacity Decisions Bottleneck 51