CONFERENCE: Regulators Role in Developing Energy Infrastructure, Investments and Operational Rules for Networks: EU and Russian Experience and Plans Florence,

Slides:



Advertisements
Similar presentations
Orientation Session on International Public Sector Accounting Standards (IPSAS) September 1, 2009.
Advertisements

- GDP 2011 versus 2010 – increase by 5.5%
Regional responses to the Europe 2020 Strategy with particular focus on energy efficiency – Hungarian case.
Regional Policy Common Indicators: Energy & Climate Change Definitions and Discussion Brussels, 22 nd November
Accounting and Financial Reporting
Bank Guarantees and Indemnities 26 th August 2013 Abdul Yassim Vice President Trade and Working Capital 1 Absa presentation title Date of presentation.
Chapter 4 Supply Contracts.
FEDERAL ANTIMONOPOLY SERVICE Liberalization and Structural Reorganization of Natural Monopolies (energy, transport, communications) as a Factor of Economic.
Electric Vehicles Conference Spanish Legal Challenges Dr. Joan Prat Rubí Brussels, 16th January, 2012.
Progress report on power (capacity) market pricing reform in Russia Svetlana Gudkova Deputy Director of the Department for regulation in electricity sector,
PERSPECTIVES OF THE COMMON BALTIC ELECTRICITY MARKET Prof. Inna Steinbuka, Chair, Public Utilities Commission, Latvia The Institute of Economic Affairs.
1 Project 2: Stock Option Pricing. 2 Business Background Bonds & Stocks – to raise Capital When a company sell a Bond - borrows money from the investor.
Foundations of Chapter M A R K E T I N G Copyright © 2003 by Nelson, a division of Thomson Canada Limited. Understanding Pricing 13.
Chapter foundations of Chapter M A R K E T I N G Understanding Pricing 13.
Copyright © 2009 Pearson Prentice Hall. All rights reserved. Chapter 8 Capital Budgeting Cash Flows.
The Role of ESCO in Wholesale Trade of Electricity (Capacity) ( REVIEW OF WHOLESALE TRADE OF ELECTRICITY) KUTAISI September,
Legal Framework, Investment Opportunities and Technical Innovation in the Electricity Sector Security of Supply through competitive markets: Design of.
FI3300 Corporation Finance Spring Semester 2010 Dr. Isabel Tkatch Assistant Professor of Finance 1.
Chapter 7 Review Economics.
Review of NTS entry charge setting arrangements - IA 1 July 2010.
“Energiewende” and cost mechanisms Charlotte Loreck Energy and Climate Division Öko-Institut e.V. Berlin for Heinrich Böll Foundation 5 December 2012.
ERGEG Advice Comitology Guidelines on Fundamental Electricity Data Transparency Florence Forum 13 December 2010 Bente Danielsen.
Allocation of capacities between Portugal and Spain Madrid 30 th April 2013.
Copyright © 2008 Pearson Addison-Wesley. All rights reserved. Chapter 10 A Monetary Intertemporal Model: Money, Prices, and Monetary Policy.
Operations Management: Financial Dimensions
OCTOBER 8, 2014 Bob Laurita INTERNAL MARKET MONITORING New Import Capacity Resource FCM Market Power Mitigation Order to Show Cause Compliance Filing.
Mexico’s initiatives with respect to Renewable Energies World Bank February 2012 Washington D.C. Alejandro Peraza-García Director General of Electricity.
Ent. 7, 12 Krasnopresnenskaya Embankment, Moscow, , Russia Administrator of Trading System (ATS) Russian Power Exchange.
Regulatory framework in the Energy Sector Chairman Ph.D. Tserenpurev Tudev Energy Regulatory Commission of Mongolia Energy Mongolia-2012 Ulaanbaatar Mongolia.
Utility Regulation March 10, 2011 Raj Addepalli Deputy Director, Electric, Office of Electric,Gas and Water New York State Department of Public Service.
2 PRESENTATION “ECONOMIC POLICY UNDER CONDITIONS OF REFORMING MARKET OF POWER AND ELECTRIC ENERGY AND IMPLEMENTATION OF INVESTMENT PROGRAM” Archangelskaya.
LECTURE. FORMATION OF PRICE FOR THE COMPANIES PRODUCT Plan lectures 1. Price and types of prices 2. Classification prices 3. Pricing policy of the enterprise.
Wind Power in Ireland: Treatment of wind in the Single Electricity Market APEx Conference, Paris 16 th October 2007.
World Forum on Energy Regulation IV Athens, Greece October , 2009 Regulatory challenge of Russian energy sector reform Dominique Fache, General.
1 Georgian National Energy and Water Supply Regulatory Commission Tariff Regulation Gocha Shonia Department of Methodology and informational provision.
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
Generation Expansion Daniel Kirschen 1 © 2011 D. Kirschen and the University of Washington.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Capacity Trades. Rules and Regulations Exchange rules must comply with a Contract on Accession to Wholesale Power Market’s Trading System Exchange commodity:
Strategies for the security of electricity supply.
RUSSIAN POWER. IN ANTICIPATION OF NEW PACES LONDON, INNOVATIONS IN THE RUSSIAN ELECTRIC POWER INDUSTRY. HOW TO ATTRACT INVESTMENTS? Pavel.
1 2005: Stages of the Power Industry Reform Moscow, March 9, 2005 Member of the RAO UESR Executive Board V. A. Zubakin.
4 th FTS – CEER bilateral meeting Sergey G. Novikov Head of the FTS of Russia Florence February,
1 RAO UES of Russia: Investment Phase of the Reform A. B. Chubais Chairman of the Management Board RAO UES of Russia 10th Annual Investor Conference "Russia:
E P D K 1 Turkish Electricity Market and Recent Developments Cemal Çelik Energy Expert EMRA-TURKEY March ANTALYA.
Power Industry Reform: expansion of investment opportunities London,October 12-13, 2005 Russia: going global Russian Trade and Investment Conference Vasily.
Russian power sector reform Presentation to AmCham Russia members by CEO of Unified Energy Systems of Russia, Anatoly B. Chubais March 20, 2001Moscow.
Several problems in implementation of the investment programs in power industry Speaker: A.Y.Kopsov, Member of the “Nice Club”, Doctor of Technical Science,
Ainārs Meņģelsons Public Utilities Commission Latvia 11th Baltic Energy Regional Initiative October 1, 2010 Jūrmala, Latvia ELECTRICITY REGIONAL INITIATIVE.
Needles Powers Crosson Principles of Accounting 12e Adjusting the Accounts 3 C H A P T E R © human/iStockphoto.
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute National Control Commission for Prices and Energy 3 April 2007, Riga.
Russian power sector reform Presentation by Anatoly Chubais, Chief Executive Officer, RAO UES of Russia 19 June 2001Moscow.
Conference “RAO “UES of Russia” is an Open Company. On the Threshold of the Reform” 11 December,2001 Moscow Vice-Chairman of the Management Board, RAO.
Secondary legislation on renewable today and tomorrow Nicolae Opris Vicepresident, ANRE ANRE ROMANIAN ENERGY REGULATORY AUTHORITY.
RAO UES Reform: The Final Stage. 2  RAO “UES of Russia” today  Reform: company transformation and market development  Conclusions Table of Contents.
Financial Guidelines FP6 – IST Directorate C 1 st Evaluation proposals co-ordinators Briefing 17 July 2003.
INVESTMENT IN GENERATION CAPACITY PAYMENTS IN COLOMBIAN MARKET Luis A. Camargo S. Wholesale Electricity Market Manager Colombia APEx Orlando. October.
Accounting (Basics) - Lecture 3 Property, plant and equipment.
Regulation on long-term capacity market
MANAGING COMMODITY RISK. FACTORS THAT AFFECT COMMODITY PRICES Expected levels of inflation, particularly for precious metal Interest rates Exchange rates,
INTRODUCTION OF THE SYSTEM OF ACCOUNTS AND SUB-ACCOUNTS ENERGY COMPANIES Mr. Armen Arshakyan Head of the Tariff Policy Department Public Services Regulatory.
Federal Energy Service Company (FESCO). The potential of power consumption decrease at different stages of energy efficiency projects implementation Existing.
ROMANIA NATIONAL NATURAL GAS REGULATORY AUTHORITY Public Service Obligations in Romanian Gas Sector Ligia Medrea General Manager – Authorizing, Licensing,
Georgy TAVADZE Chairman Georgian National Energy Regulatory Commission (GNERC) Budapest, Hungary April 14, th Annual Meeting of the Energy Regulators.
Renewable energy support schemes in the Republic of Moldova
Unit 4: Agribusiness Management Lesson: AM2
GEORGIAN ELECTRICITY MARKET OPERATOR
Long-term Capacity Market
Chief Executive Officer RAO “UES of Russia”
Pedro Cruz Yábar Brussels, 21st June 2016
Presentation transcript:

CONFERENCE: Regulators Role in Developing Energy Infrastructure, Investments and Operational Rules for Networks: EU and Russian Experience and Plans Florence, February 6-7, 2012 The Russian Capacity Market: Main Principles and Pricing Oleg BARKIN, Deputy Chairman of the Board on Market Development, NP Market Council

22 Background of the Russian Capacity Market Capacity is a special commodity, which when sold signifies the producers availability for electricity generation and when acquired guarantees the consumer the possibility of purchasing the necessary volume of electricity Main reasons for introducing a capacity market in Russia: limited possibilities for generators to compensate fixed costs in the short-term electricity market (taking into account the absence of special reserve payments, the lack of a mature market for long-term contracts and the existence of price caps on the electricity market) the need to provide incentives for the construction of new generating facilities and the upgrading of existing facilities The capacity market in its existing state was introduced in Russia on January 1, 2011 (the first selection for 2011 was conducted at the end of 2010, the second for 2012 – in October 2011). Capacity sale revenues amount to around 30-35% of generators annual revenues (this figure was around 50% in the regulated market). Currently a significant share of generating facilities is in need of upgrade or replacement. The total volume of the investment program for the construction of new generating facilities on the wholesale market (in prize zones) up to 2020 amounts to 41.2 GW (30 GW – thermal, 11.2 GW – nuclear & hydro). 2

33 The Long-term Capacity Market Objectives Ensuring long-term stability/ reliability – preventing deficiency in the power system Minimizing the total cost of electricity and capacity for consumers Creating a generation mix that is as efficient as possible Creating regional price signals for the development of generation, consumption and network facilities Improving the industrys investment climate by providing suppliers with long-term guarantees Stimulating investments in the construction and upgrading of power equipment 3

44 Market Price Zones and Capacity Free Flow Zones 4 The capacity market operates in wholesale market Price Zones: I – Europe & Urals II – Siberia Price zones are split into Free Flow Zones (FFZs) that take account of planned capacity supply limits between them I Price Zone II Price Zone Regions with tariff regulation 4

The Capacity Market: Total Cost Efficiency Principle Payments received through the capacity market, do not have to fully recover the suppliers fixed costs, as the supplier will be able to recover a part of his fixed costs in the electricity market – this arrangement enables competition based on total costs 55 Costs Revenue Plant APlant BPlant C Payments for capacity: the value of capacity sold through contracts or at market prices Payments for capacity: the value of capacity sold through contracts or at market prices Payments for electricity: the value of electricity sold through contracts, on the DAM and the BM Payments for electricity: the value of electricity sold through contracts, on the DAM and the BM Fixed Costs Variable Costs (fuel etc.) 5

Delivery and payment period(X years) Delivery and payment period – 10 years after commissioning (nuclear, hydro – 20 years) Construction of new facilities and upgrade of existing facilities Construction of new facilities and upgrade of existing facilities Main Mechanisms in the Capacity Market Delivery and payment period (1 year) Upkeep Upgrade Decommissioning Upkeep Upgrade Decommissioning Regulated contracts ~ ~ ~ ~ ~ ~ ~ ~ Free Bilateral contracts C C C C CSC must-run contracts C C C C C ~ ~ C No capacity payment ~ ~ ~ CCS for 1 year mandatory contracts ~ 6 Delivery and payment period (1 year)

Main Mechanisms of the Capacity Market Capacity sold based on the results of Competitive Capacity Selection (CCS) Selling capacity selected during CCS that was not sold under other types of agreements Regulated Contracts (RCs) Electricity and (or) capacity sale and purchase contracts between the supplier and the buyer, prices match electricity and (or) capacity tariffs set by the FTS (only for supply of the population and other equated categories of consumers) Capacity of generating facilities, for which CSCs have been concluded + Capacity of new NPPs and HPPs, for which agreements for the sale and purchase of capacity of new NPPs and HPPs have been concluded Capacity of generating facilities, for which CSCs have been concluded + Capacity of new NPPs and HPPs, for which agreements for the sale and purchase of capacity of new NPPs and HPPs have been concluded Selling thermal capacity under long-term contracts Selling nuclear and hydro capacity on conditions similar to those of CSCs Capacity of must run generators Selling the capacity of generating facilities that were not selected during the CCS, but must continue operating for technological or other reasons Free Capacity Sale and Purchase Bilateral Contracts (FCCs) Selling capacity for which capacity sale and purchase contracts (FCC) have been concluded, provided that it was selected at the CCS 7

88 Competitive Capacity Selection Competitive selection price Demand for capacity Capacity was not selected – will not be paid for (unless classified as must-run) Capacity was not selected – will not be paid for (unless classified as must-run) Price Volume (priority) Accounting for the volumes of mandatory investment projects (CSCs, including nuclear and hydro) During competitive selection: the limits of capacity transfer between FFZs are taken into account the capacity of generating facilities, the technical characteristics of which ensure power system operation (regulation range, ramp up and ramp down rates), is selected, minimum technical requirements are set 8

99 Anti-Monopoly Regulation In the run-up to the competitive selection The FAS of Russia analyzes the competition in free flow zones and determines the following: During selection Controlling the economic justification behind price bids After selection In the event that the FAS identifies a case of price manipulation competitive selection results may be annulled by decision of the NP Market Council Supervisory Board and a repeat selection carried out 9 To improve competition: measures aimed at expanding (combining) FFZs should be taken on a regular basis – for FFZs with limited competition a maximum price (threshold) is set and approved by the Government – for FFZs, where competition exists – the selection is carried out without price caps. Wholesale market participants submit information on their affiliates to the FAS of Russia (since the entry into force of the resolution on anti-monopoly control rules) – the FAS may set special conditions for the participation of certain suppliers in the competitive selection

10 Competitive Capacity Selection with Price Caps Competitive selection price Maximum (threshold) price Demand Demand for Capacity Capacity was not selected – will not be paid for (unless classified as must-run) Capacity was not selected – will not be paid for (unless classified as must-run) Price Volume Volumes of mandatory investment projects (CSCs, including nuclear and hydro) are accounted for During competitive selection: suppliers submit bids containing prices that do not exceed the maximum price of capacity, thus establishing the supply curve (bids containing prices that exceed the threshold level are not taken into account) the capacity of generating facilities, the technical characteristics of which ensure power system operation, is selected the minimum capacity sale price is set Minimum price 10

11 Competitive Capacity Selection without Price Caps Demand 15% of the most expensive supply Price Volume CSC volumes (including nuclear and hydro) are accounted for Particularities of competitive capacity selection without price caps: a supplier that owns a significant share of generation in an FFZ may only submit a price bid for a volume of capacity not exceeding 15% of total capacity in the FFZ, a price-taking bid is submitted for the remaining volume 15% of the most expensive supply is not used in the marginal price calculation the capacity of generating facilities, the technical characteristics of which ensure power system operation, is selected, HOWEVER the selection price is calculated without taking technical parameters into account Competitive selection price Selection not accounting for technical parameters Volume Selection accounting for technical parameters Not selected Paid at the marginal price Paid at the tariff Competitive selection price 11 Price

12 Capacity Payment based on Competitive Selection – the Delivery Year NOT selected Must-run generating facilities Other generating facilities Paid at the CCS price, (the most expensive units – at the tariff) Capacity tariff (less the revenue on the competitive electricity market) No capacity payment (only electricity market revenues, or decommissioning) Decommissioning is temporarily impossible for valid reasons (reliability concerns, heat supply, insufficient network capacity etc.) Existing generating facilities based on competitive selection SELECTED Generating facilities paid based on competitive selection results 12

13 Insufficient Capacity Selected at the CCS Competitive selection price Price Volume New capacity is contracted on CSC terms CSCs accounted for Supply during competitive selection does not meet demand 13 Selected capacity For investment projects chosen during the additional selection contracts similar to CSCs are concluded. The price in these contracts is equal to the bidding price (but not above the capacity price contained in CSCs for facilities of the same type) 13 Demand

14 Capacity Supply Contracts (CSCs) The background of CSCs: When RAO UES of Russia was reorganized generating companies (OGKs/TGKs) were established, their controlling stakes were acquired by new owners through additional share issue purchase The terms of selling these shares were set based on the need to fund investment programs, the list of which was initially approved by the RAO UES of Russia BoD In timeframes and certain characteristics of the investment programs were updated and the contractual arrangements of CSCs were refined – the contracts were then resigned on the new terms In 2010 long-term supply contracts for new nuclear and hydro capacity (similar to CSCs) were signed The planned volume of capacity commissioning under CSCs amounts to roughly 41,2 GW (30 GW thermal, 11.2 GW nuclear + hydro) The planned volume of capacity commissioning under CSCs amounts to roughly 41,2 GW (30 GW thermal, 11.2 GW nuclear + hydro) 14 A CSC is a generating companys obligation to commission new capacities with predefined characteristics in a predetermined timeframe subject to guaranteed payment for commissioned capacity over a certain period of time The fulfillment of investment obligations under CSCs is provided for by special mechanisms of control over their execution and by the contractual liabilities of the parties for failure to fulfill such obligations. Market rules also contain a set of provisions promoting the fulfillment of CSCs.

CSCs: Pricing The price for capacity under CSCs is calculated so as to compensate the following components: Reference capital expenditures that depend on the units characteristics (for example, for gas-fired generation over 250 MW – 720, for coal-fired generation over 225 MW – 1230) Operating costs – 2000 per MW a month – for gas-fired generation – 3075 per MW a month – for coal-fired generation Property tax Costs associated with technological connection to electric and gas networks are calculated based on actually incurred costs Payment period under the contract – 10 years, payback period – 15 years. The basic rate of return on invested capital used is WACC=14% (if the rate of return on long-term federal loan bonds deviates from 8.5% – the WACC is recalculated) Only a part of total costs is compensated (excluding technological connection costs) – the rest is compensated by DAM profits. For example: 75% – for gas-fired generation with a capacity of 150 to 250 MW in the 1st price zone, 95% – for coal-fired generation in the 2nd price zone. Accounting for the book value of generation assets 15

Capacity certification – determining the maximum volume of capacity that can be supplied by this generating unit for the respective year Only certified capacity is paid for in the volume of selected capacity (not more) Volume of Capacity Supplied to the Wholesale Market Capacity selected at the CCS Certified capacity In the CCS the selected volume of capacity is determined for each generating facility: Non-certified capacity – non-payment + fine Supplied capacity Actually supplied volume of capacity for each month Based on the suppliers fulfillment of generating equipment availability requirements (set by Government Resolution) the System Operator determines the fraction of the maximum volume that was actually supplied to the wholesale market. Auxiliary requirements are also deducted The part of certified capacity that was not supplied is not paid for 16

17 Particularities of Capacity Market Participation for Nuclear and Hydro Existing nuclear and hydro generators participate in competitive selection procedures on the same terms as others, however in the FTS sets a markup to the capacity price for existing nuclear and hydro generators in order to fund investment projects and safety costs as of 2013 – a markup to the market price of capacity is only set if wholesale market revenues are insufficient for safe operation (paid out in the following period) New nuclear and hydro generating facilities sell capacity through contracts similar to CSCs are given the right to postpone commissioning for up to 1 year without being fined (subject to prior notification 1 year before the initial commissioning date) prices for new facilities are set by the FTS, electricity sales revenues and funds received as part of Proper Use of Funds or the investment part of the tariff are deducted from the price the term of contracts for nuclear and hydro generation is 20 years with an estimated payback period of 25 years the volume of new nuclear and hydro capacity under these contracts amounts to 11.2 GW 17

18 Payment for Capacity by the Buyers Volume of capacity purchase on the wholesale market: the purchase volume is proportionate to actual peak consumption for large consumers – a possibility to independently plan (with a responsibility to stay within planned volumes) and fix capacity purchase volumes in advance – with account of the planned reserve factor payment for new CSC capacity – evenly between the consumers of the price zone payment for capacity selected at the CCS at FFZ prices (localized price signals) payment for new capacity selected if supply during CCS is insufficient – evenly between the consumers of the free flow zone (localized price signals) Mechanisms of purchasing capacity through CSCs and new nuclear and hydro contracts purchasing must-run capacity through free contracts at the competitive capacity selection price 18

19 Free Contracts Free Capacity Sales and Purchase Contracts (FCCs) are registered before the capacity supply period FCCs can be both over-the-counter and exchange-traded, they may also contain any kinds of provisions for electricity supply (FECCs) FCCs may only be concluded within one FFZ The volume of capacity sold/purchased under FCCs is accounted for when determining the volume of capacity that a buyer must purchase at the competitive selection price, by reducing this volume when determining the volume of capacity that a supplier may sell at the competitive selection price, by reducing this volume The volume of capacity sold under FCCs may not exceed the volume of capacity actually produced by the supplier (in connection to this FCC) the volume of capacity actually purchased by the buyer and not covered by other mechanisms (in connection to this FCC) Free bilateral contracts are a mechanism of hedging the supply price significantly improve the industrys investment climate Free bilateral contracts are a mechanism of hedging the supply price significantly improve the industrys investment climate 19

Buying Capacity Different mechanisms of capacity purchase CSC, NPP/HPP Must-run CCS FCC CCS The volume to be purchased at CCS prices is the volume left over from other mechanisms Peak·k Registered FCC Actual FCC 1 MW Based on the results of each month the volume of capacity to be purchased on the wholesale market is determined 20 CSC, NPP/HPP Must-run

21 Long-term Capacity market: Macroeconomic Effect Improved investment climate in the electricity industry of Russia emerging long-term price characteristics of the market and levels of payment for facilities under CSCs transition to a system of long-term capacity sale and purchase contracts (CSCs and contracts based on competitive selection results) establishing regional price signals, as well as levels and terms of payment that provide incentives to upgrade existing capacities Better appeal of market pricing mechanisms to consumers introducing new quality and cost criteria to the system of selecting generating facilities and as a result smaller number of inefficient power plants emerging possibility of long-term capacity price forecasting and electricity consumption cost management in the future – increased market elasticity as a result of payments shifting from capacity to electricity 21

Thank you for your attention!