Lift Design Example The following notes give an example for design of lifts.

Slides:



Advertisements
Similar presentations
Chapter 2 Table of Contents Section 1 Displacement and Velocity
Advertisements

Chapter 3: Position, Speed and Velocity
II. Describing Motion Motion Speed & Velocity Acceleration
“God Is Not…” “God is not a man” Numbers 23:19 God’s dependable nature
Work Work: Work is said to be done when the point of application of a force moves and it is measured using the product of force and the distance moved.
V In the study of kinematics, we consider a moving object as a particle. Displacement Kinematics in One Dimension (Phy 2053) vittitoe.
1 Using Kinematic Equations 1. Write down the symbols, values and units (in SI) of given quantities 2. Write down the symbol of the quantities required.
Reaction-time Problem # 1
Classroom Bill of Rights
Part 3 Probabilistic Decision Models
$100 $400 $300$200$400 $200$100$100$400 $200$200$500 $500$300 $200$500 $100$300$100$300 $500$300$400$400$500.
Division Estimator (WIA and DNBI)
THE EVIDENCE OF PARDON I. THE VALUE OF EVIDENCE, Acts 1:3 II. IS KNOWLEDGE POSSIBLE? Job 19:25; Acts 2:36; 2Cor. 5:1; 1Jno. 3:2; 2:3 III. PARDON EXPLAINED,
The Derivative in Graphing and Application
Chapter 4 Linear Motion.
Signing Plan Design - At Grade Intersections TEM Chapter Application Guidelines - Regulatory Signs.
Chapter 10 NOTES PRACTICE PROBLEMS.
Review Questions: Ch 2 A car starts from rest after 9 seconds is it moving at 81 m/s. What is the car’s acceleration? 81/9 = 9 m/s2.
(i) its uniform retardation, (ii) time taken to come to rest,
Traffic Impact Study “Study to evaluate the impact on a roadway network due to a proposed development”
Con Law Card Answers.
Velocity - The rate at which the position of an object changes with time in a particular direction. There are two ways we discuss velocity. Average velocity.
Waiting Line Management
Process Flow Analysis The Little’s Law The main source for preparing these slides is Managing Business Process Flow Anupindi, Chopra, Deshmoukh, Van.
1 Frequency Distribution: Mean, Variance, Standard Deviation Given: Number of credit hours a sample of 25 full- time students are taking this semester.
§ 6.2 Areas and Riemann Sums. Area Under a Graph Riemann Sums to Approximate Areas (Midpoints) Riemann Sums to Approximate Areas (Left Endpoints) Applications.
Three Key Process Measures: Flow Rate
OF ALL MERCER MIDDLE SCHOOL STUDENTS HAVE ADMITED TO CONSUMING WATER
Summarize things so far…
Part 1 /2 High School by SSL Technologies Physics Ex-39 Click Potential energy is stored energy because it has the “potential” of being used at a future.
1 Ardavan Asef-Vaziri Oct. 2011Operations Management: Waiting Lines 1 Polling: Lower Waiting Time, Longer Processing Time (Perhaps) Waiting Lines.
Reagan/Clinton Compare/Contrast Essay. I. Reagan and Clinton both argue... but... A.Reagan argues B.Clinton argues.
23-8 3x6 Double it Take Away 6 Share By 9 Double it +10 Halve it Beginner Start Answer Intermediate 70 50% of this ÷7÷7 x8 Double it Start Answer.
Introduction to Queuing Theory
Chapter 4 Linear Motion.
Aim: How can we distinguish between speed, velocity and acceleration?
2 x0 0 12/13/2014 Know Your Facts!. 2 x1 2 12/13/2014 Know Your Facts!
4.6 Quick Graphs Using Slope-Intercept Form 1 GOAL
Partial Products. Category 1 1 x 3-digit problems.
Chapter 11 Using Energy.
2 x /10/2015 Know Your Facts!. 8 x /10/2015 Know Your Facts!
5 x4. 10 x2 9 x3 10 x9 10 x4 10 x8 9 x2 9 x4.
EMIS 8374 LP Review: The Ratio Test. 1 Main Steps of the Simplex Method 1.Put the problem in row-0 form. 2.Construct the simplex tableau. 3.Obtain an.
Multiplication Facts Practice
Graeme Henchel Multiples Graeme Henchel
0 x x2 0 0 x1 0 0 x3 0 1 x7 7 2 x0 0 9 x0 0.
MULTIPLICATION OF INTEGERS
Count to 20. Count reliably at least 10 objects. Use ‘more’ and ‘less’ to compare two numbers. Count reliably at least 10 objects. Estimate number of objects.
Class 13: Question 1 Which graph represents an object slowing down, where D is distance and t is time. Assume that units are the same for all four graphs.
1 Design of Evacuation System for High-Rise Building Danqing Yu.
Universal Data Collection (UDC) Mapping Project
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=

MOTION Unit 9, Chapter 11.
THEOREM 1 Net Change as the Integral of a Rate The net change in s (t) over an interval [t 1, t 2 ] is given by the integral.
ПОРТФОЛИО профессиональной деятельности Белово 2015 Таюшовой Натальи Борисовны Преподавателя дисциплин «Химия», «Биология»
Introduction The selection of the vertical transportation equipment is the most important decision to be made by the designer The passenger, freight elevators.
Plenary: rules of indices
Design of Evacuation System for High-Rise Building Danqing Yu
Flow diagrams (i) (ii) (iii) x – Example
Bellwork When was the FFA founded?.
ОПШТИНА КУРШУМЛИЈА.
A car is decelerated to 20 m/s in 6 seconds
Index Notation Sunday, 24 February 2019.
Понарамалық сабақ.
УВС АЙМГИЙН НИЙГЭМ ЭДИЙН
Motion in One Dimension
8 Core Steps of success: I.Step:1 : DREAM SETTING: II. Step: 2 : LIST MAKING : IV. Step: 4 : SHOW THE PLAN: III. Step: 3 : INVITATION: V. Step: 5 : FOLLOW.
Presentation transcript:

Lift Design Example The following notes give an example for design of lifts

Traffic Design - Nos. and Size of Lifts • Estimation of population • Quality of service required – The up-peak interval of an office tower: 20s or less – excellent system 30s – satisfactory system • Quantity of service required – The handling capacity within 5 minutes • Estimation of arrival rate Handling capacity = (5minx60x0.8xLift Car Capacity in nos. of persons)/(up peak interval x population above terminal floor of zone)

(cont.) • Round Trip Time (RTT) by up peak model RTT = 2Htv + (S +1)ts+ 2Ptp Where, RTT = round trip time in seconds H = highest call reversal floor S = average no. of stops tv= time to transit 2 adjacent floors at rated speed in seconds ts = time consumed when making a stop in seconds tp= passenger transfer time for entering or exiting the lift car in seconds P = 0.8xlift car capacity in person

Question: Lift Traffic Design Design Input: An office building of 10 floors above the main terminal is to be built, each floor of 1200 sqm of net space. The inter-floor distance is 3.3m. The required up peak interval is 30s (i.e. satisfactory grade) Estimation of population: assume 12sqm per person per floor, Assume 12.5% population peak arrival rate Assumed lift rated speed = 1.6m/s Given that: • ts=7.7s (from code) • tp=1.2s (assumed) • H=9.5, S=6.7 (from code)

Design Output: Determine the following information: i) Persons per floor ii) Number of persons per arrival iii) Nos. of lift trips per 5 minutes iv) Car size required (person car) v) Total travel distance per lift vi) Transit time between 2 floors vii) RTT (Round Trip Time) viii) Nos. of car required ix) Handling Capacity (persons per 5 mins) x) What is the difference between quantity of service and quality of service

Results: i.e. Pop=1200/12=100 persons per floor •, i.e. 0.125x0.8x100x10flr=100 persons • Qty of service: Nos of trip in 5 minutes = 5minx60/30s=10 • Nos. of person per trip = 100/10 = 10 • The required car size is 10/0.8 = 13-person car • Total travel distance = 3.3x10=33m • Assumed rated speed = 1.6m/s • tv=3.3/1.6=2.1s • ts=7.7s (from code) • tp=1.2s (assumed) • P=13x0.8=10.4 persons • H=9.5, S=6.7 (from code) • RTT=(2x9.5x2.1)+(6.7+1)7.7+(2x10.4x1.2)=124.2s • Since up peak interval required is 30s, i.e. 4 cars are required • The up peak interval is 124.2/4 = 31.1s • The up peak handling capacity is (300/124.2)x10.4x4 = 100.5 persons / 5min