Shut 95SS2-235 (245)
IF draining to Recovery Header, THEN check SHUT 95SS2-238 (248) AND
IF draining to Recovery Header, THEN check SHUT 95SS2-238 (248) AND check OPEN 95SS2-237 (247)
IF draining to Drain Header , THEN check SHUT 95SS2-237 (247) AND
IF draining to Drain Header , THEN check SHUT 95SS2-237 (247) AND check OPEN 95SS2-238 (248)
Check OPEN 95SS2-234 (244) AND 95SS2-236 (246)
Check SHUT V1 (V2) on jumper
Insert jumper into test connections for A (B) Hotwell Conductivity cell.
Jumper Installation Sign Attachment 11 as installer. Have a second person verify proper installation AND sign Attachment 11 as verifier.
Throttle OPEN V1 (V2) to obtain about 100 cc/min on 95FI-118 (120).
Hang tag on installed jumper identifying PC-02 Hang tag on installed jumper identifying PC-02.01 as installation procedure