© BMA Inc. 2009. All rights reserved. Value Stream Capacity Understanding Value Stream Decision Making.

Slides:



Advertisements
Similar presentations
Demystifying 6.
Advertisements

Understanding Value Stream Decision Making
© BMA Inc All rights reserved. Lean decision making Box score.
© BMA Inc All rights reserved. Decision-making Making routine decisions without the help of standard costs.
Ozone Level ppb (parts per billion)
Managing Processes and Capabilities CHAPTER THREE McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
Fundamentals of Cost Management Chapter 10 Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin.
Standard Business Roadmap
Airbus Production System
Value Stream Mapping AGENDA Introduction to mapping
Pull System Workshop THE GOAL: Directly link all processes - from the customer back to raw material suppliers - to improve responsiveness, shorten lead.
Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 1 Process Analysis Operations.
Bringing Sanity to Clinical Work Life Lean in Healthcare Michael Nelson, MD Blue Corn Professional Services, LLC.
By Anastasia Lidya Maukar
Process Analysis If you cannot describe what you are doing as a process, you do not know what you are doing. W.E. Deming.
Capacity Planning.
Capacity Planning For Products and Services
Chapter 5 Capacity Planning For Products and Services
Confidential - All Rights Reserved - © Capacity Analysis Fill in Supplier Name and Supplier Location (Address) Fill in Part Name (Ex: Bush, Button,
Managing Capacity Chapter 6.
Activity-Based Costing and Management Management Accounting: The Cornerstone for Business Decisions Copyright ©2006 by South-Western, a division of Thomson.
Business Processes Sales Order Management Aggregate Planning Master Scheduling Production Activity Control Quality Control Distribution Mngt. © 2001 Victor.
Cost-Revenue Analysis for Decision Making
© BMA Inc All rights reserved. Decision-making Making routine decisions without the “help” of standard costs.
1.Over Production: Producing more than is needed Over Production: Over Production: 2.Waiting: Idle Time (Down Time) Waiting: 3.Non-Utilized Talents: Under.
JIT, TPS, and Lean Operations
VALUE STREAM MAPPING Analysis of Material Transport.
Lean Operations (JIT) Module
1 IRWIN  a Times Mirror Higher Education Group, Inc. company, 1996 Facilities Layout.
The Production Process
Lean Operations (JIT) Module
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 15 Just-In-Time Systems.
Summary: Review of Lean Principles
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Value Stream Mapping.
Process Improvement Strategies Takt Time Future State Value Stream Map
Value Stream Mapping How to Create the Future State Issue: You have mapped a current state, so what should your ideal or future state map look like? Overproduction.
Production Planning and Control Introduction
Financial benefits of lean improvement
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
8 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Lean Systems 8.
1 A Fundamental Principle of TPS Produce to Demand 1.Make only what is needed when it is needed. 2.Base production and planning on Takt Time. 3.Develop.
Just-in-Time and Lean Systems
California User Group October 11, 2011 Santa Barbara, CA Paul Rubin Advanced Repetitive – Advanced Tools for Managing WIP.
File G: Value Stream Cost Analysis Exercise Using Simplified File F Template.
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 1 LEAN SYSTEMS TOOLS AND PROCEDURES.
© 2009 BMA Inc. All rights reserved.  Capacity analysis provides an overview of how effectively you use time in each cell.  The time is categorized.
© BMA Inc All rights reserved. Decision Making.
Supplier Development project Tools for supplier development Inspiration for tools to be used in workshops.
Production and Operations Management: Manufacturing and Services
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Lean Supply Chains Chapter 12.
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
CHAPTER 9 Lean Manufacturing.
Chapter 12 Lean Production. Chapter 12 Lean Production.
IENG 451 / 452 Just In Time Processes: Cells, Stores, Kanban, Demand
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
An introduction to Factory Physics
Process Design and Analysis
Value Stream Mapping GEOP 4316.
Value Stream Mapping (VSM) Training
Chapter 5 Process Analysis.
Value Stream Mapping ASQ March 2018.
Process Improvement Strategies Takt Time Future State Value Stream Map
Luxfer Gas Cylinders – S&OP Process Improvement
Luxfer Gas Cylinders – S&OP Process Improvement
Work Measurement and Lean Application
Chapter 5 Process Analysis.
Inputs and Outputs to APP
Presentation transcript:

© BMA Inc All rights reserved. Value Stream Capacity Understanding Value Stream Decision Making

© BMA Inc All rights reserved. Understanding Value Stream Capacity The production quantity that can be achieved at each step in the value stream or production process. There are usually one or two production steps (cells, machines, or work centers) that constrain the flow through the value stream or business unit. We need to identify the production capacity at each step in the value stream (or production flow) so that we can understand the flow through the entire process. Where is the data required for this analysis? –On the Value Stream Maps

© BMA Inc All rights reserved. Analyzing the capacity Productive capacity Value added activities Provides value to the customer Comes directly from customer pull Non-productive capacity Non-value-added activities Change-overs, unplanned maintenance, making for stock, defects/rework, etc. Also meetings, 5S, improvement activity Available capacity Capacity that is not currently being use for productive or non-productive activities.

© BMA Inc All rights reserved. OEM Value Stream Map SupplierCustomer Kanban Shipping S&OP Demand ForecastsPurchase Forecasts Order SupplierCustomer Shipping Assembly Welding 3,000 per Month Machine Shop Machine Shop Machine Shop Machine Shop Machine Shop Machine Shop Machine Shop Qty = 30,000 C/T = 70s Batch = 1500 Set Up = 10,800s Scrap = 10% Rework = 20% Downtime = 15% Inspection = 10% Insp Time = 120s # cells = 8 Crew Size = 4 # of people = 34 Shifts = 1 Qty = 15,000 C/T = 180s Batch = 600 Set Up = 1200s Scrap = 5% Rework = 10% Downtime = 5% Inspection=100% Insp Time = 30s # cells = 5 Crew Size = 1 # of people = 10 Shifts = 2 Qty = 3,000 C/T = 210s Batch = 20 Set Up = 600s Scrap = 0% Rework = 10% Downtime = 0% Inspection=100% Insp Time = 60s # cells = 2 Crew Size = 5 # of people = 10 Shifts = 1 Qty = 3,000 C/T = 120s Batch = 1 Set Up = 0s Scrap = 0% Rework = 2% Downtime = 0% Inspection=0% Insp Time = 0s # cells = 1 Crew Size = 1 # of people = 1 Shifts = 1 DATA BOXES

© BMA Inc All rights reserved. Cycle Time: How often a part or product is completed by a process. (or: the time taken for an operator to go through all his/her work elements before repeating them.) C/T Cycle time includes all processes VA & NVA Cycle time is measured by tracking it with a stop watch We match the cycle time to the customer takt time The process is under control if the cycle time is consistent Standard Cycle Time

© BMA Inc All rights reserved. Crew size - the number of people in the cell or operation required to produce to the cycle time recorded on the Value Stream Map # of cells = the number of cells running in parallel. Similar cells, working on the same products and performing the same process step. Crew size = 5 # of cells = 1 Crew size and number of cells

© BMA Inc All rights reserved. Calculate the Capacity for the Machine Shop SupplierCustomer Kanban Shipping S&OP Demand ForecastsPurchase Forecasts Order SupplierCustomer Shipping Assembly Welding 3,000 per Month Machine Shop Machine Shop Machine Shop Machine Shop Machine Shop Machine Shop Machine Shop Qty = 30,000 C/T = 70s Batch = 1500 Set Up = 10,800s Scrap = 10% Rework = 20% Downtime = 15% Inspection = 10% Insp Time = 120s # cells = 8 Crew Size = 4 # of people = 34 Shifts = 1 Qty = 15,000 C/T = 180s Batch = 600 Set Up = 1200s Scrap = 5% Rework = 10% Downtime = 5% Inspection=100% Insp Time = 30s # cells = 5 Crew Size = 1 # of people = 10 Shifts = 2 Qty = 3,000 C/T = 210s Batch = 20 Set Up = 600s Scrap = 0% Rework = 10% Downtime = 0% Inspection=100% Insp Time = 60s # cells = 2 Crew Size = 5 # of people = 10 Shifts = 1 Qty = 3,000 C/T = 120s Batch = 1 Set Up = 0s Scrap = 0% Rework = 2% Downtime = 0% Inspection=0% Insp Time = 0s # cells = 1 Crew Size = 1 # of people = 1 Shifts = 1 DATA BOXES

© BMA Inc All rights reserved. Step 1. Calculate the Total Available Employee Time (#employees x #days x Labor Hrs per shift) Step 2. Calculate the Employee Productive Time (Qty per Month x Cycle Time x Crew Size) Step 3. Calculate the Emp. Productive Capacity Percentage. (Employee Productive Time / Total Available Time) Step 4. Calculate the change-over time, scrap & rework time, downtime, inspection time. C/O = (quantity/batch size) x Change-over time Scrap/rework = (Qty produced / (1- (scrap + rework %) ) * (scrap + rework%) x Cycle Time x Crew Size D/T = Downtime% x Total Available Time Inspection= (Total produced + scrap/rework) x Inspection % x Inspection time Over-production = OP Qty x Cycle Time * Crew Size 5S & Clean-up = 5S Time x #Employees x #days Meetings = Meeting Time x #Employees x #days TPM = TPM Time per day * #days Step 5. Calculate the Total Non-Productive Time Sum of Step 4 Step 6. Calculate the Emp. Non-Productive Capacity Percentage Total Non-Prod Time / Total Available Time Step 7. Calculate the Emp. Available Capacity Percentage. 100% - (Prod. Capacity + Non-Prod Capacity) Calculate the employee capacity

© BMA Inc All rights reserved. Machine Shop Capacity - employees

© BMA Inc All rights reserved. Machine Shop Capacity EMPLOYEE CAPACITY Cell output is driven by Employee Time rather than Machine Time. There is more machine capacity than employee capacity MACHINE CAPACITY

© BMA Inc All rights reserved. Capacity Calculations when you have Multiple Product Families Calculate the weighted average of the cycle time, change-over, etc.

© BMA Inc All rights reserved. Value Stream Capacity Value Stream demand = 3,000 units/month Takt Time = 180 sec Average product has 5 welded sub-assy Average sub-assy has 2 machined components Machine Shop makes 30,000 items Welding Shop welds 15,000 sub-assy Assembly assembles 3,000 units Shipping ships 3,000 units Maximum Capacity is 3,000 units because Machine Shop can only make 30,000 parts