Capacity Capacity – Is the maximum amount of work that an organization is capable of completing in a given period of time.

Slides:



Advertisements
Similar presentations
1 EMBA-2, BUP EO Strategic Capacity Planning.
Advertisements

© BMA Inc All rights reserved. Decision-making Making routine decisions without the help of standard costs.
Whiteboardmaths.com © 2007 All rights reserved
Throughout Problems.
Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 1 Strategic Capacity Management.
Capacity Planning and Queuing Models
Halil SATIK Industrial Engineering Department, Dokuz Eylul University, Turkey.
Capacity Planning.
Chapter 11 Strategic Capacity Management
Throughput Throughput, Utilization, Bottleneck, Effective Capacity, Theoretical Capacity, and Capacity Leverages. November 11, 2011 Ardavan Asef-Vaziri.
Flow Rate and Capacity Analysis
Capacity Planning ABI301.
Confidential - All Rights Reserved - © Capacity Analysis Fill in Supplier Name and Supplier Location (Address) Fill in Part Name (Ex: Bush, Button,
Network and System Design
7. PV System Sizing Herb Wade Consultant
The West Central Women’s Resource Centre H.O.M.E.S Program Presents Rewarding Work.
Higher Business Management
Lecture 2 Complex Power, Reactive Compensation, Three Phase Dr. Youssef A. Mobarak Department of Electrical Engineering EE 351 POWER SYSTEM ANALYSIS.
Unit 2 Manufacturing Operations Sections: 1.Manufacturing Industries and Products 2.Manufacturing Operations 3.Production Facilities 4.Product/Production.
Line Balancing Problem A B C 4.1mins D 1.7mins E 2.7 mins F 3.3 mins G 2.6 mins 2.2 mins 3.4 mins.
Questions Addressed by Cost-Volume-Profit Analysis
Section 1.1, Slide 1 Copyright © 2014, 2010, 2007 Pearson Education, Inc. Section 8.3, Slide 1 Consumer Mathematics The Mathematics of Everyday Life 8.
8.4 Simple and Compound Interest
Week-3 Criteria for work loads
Jones & Robinson: Operations Management All operations need to know the likely customer demand for their goods or services on any given day, week or year.
Piece-Rate System ECONOMIC OF LABOUR & SOCIO-LABOUR RELATIONS Demos of the discipline © Filippova I.H. Time Rate System Remuneration Vladimir Dahl East-Ukrainian.
QUALITY ASSURANCE Work Load. Workload is the sum of the work achieved or to be achieved, obtained by multiplying the raw count of each individual procedure.
Simple Interest (MAT 142) Simple Interest.
Project : Man Utilization FMS Cell Unit 1104 DSES 6620 Spring 2002 William Harris.
Perencanaan Kapasitas Produksi
Facilities and Aggregate Planning. Overview As you know there are 24 hours a day, 7 days a week. What can you get done in a week period? Firms need to.
capacity planning and control
Labour.
Application of Lean Production Case Study from Garment Sector of Pakistan 28 March, 2011 Presenters: Mr. Haider Sagheer Mr. Qasar Wasique Ahmed Dr. Nabeel.
Lecture 6 Sewing Machine Beds ….
Interest on Loans Section 6.8. Objectives Calculate simple interest Calculate compound interest Solve applications related to credit card payments.
CREDIT VOCABULARY.  Credit = a promise to pay in the future for an item you purchase today.  Finance charge = the cost of using credit. This is usually.
Chapter 4 Process Design.
Chapter 5 Section 5.1 Simple Interest. The Mathematics of Finance In these sections we will learn about of the more practical uses of mathematics that.
1 A Fundamental Principle of TPS Produce to Demand 1.Make only what is needed when it is needed. 2.Base production and planning on Takt Time. 3.Develop.
Announcement-exam rules
Principles of Cost Accounting 15 th edition Edward J. VanDerbeck © 2011 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated,
Planning in production systems Slovak University of Technology Faculty of Material Science and Technology in Trnava.
World University of Bangladesh
The Income Statement BBI1O1. What is an Income Statement Remember, a Balance Sheet is a snapshot of a business on one day in time Remember, a Balance.
Consumer Loans © 2010 Pearson Education, Inc. All rights reserved.Section 9.3, Slide Determine payments for an add- on loan. Compute finance charges.
POWER POINT LESSON S S 3 ECONOMICS NATIONAL INCOME. NATIONAL INCOME CAN BE DEFINED AS THE TOTAL MONETARY VALUE OF GOODS AND SERVICES PRODUCED IN A GIVEN.
PRESNTATION OF ALL DEPARTMENT MONTH OF MAY-2011
Chapter 1 The Economic Way of Thinking
Ch 12: Payroll Accounting Ms. Alltucker Accounting II.
CHAPTER 8 CAPACITY. THE CONCEPT Maximum rate of output for a process Inadequate capacity can lose customers and limit growth while excess capacity can.
Section 5-2.  The work done by a machine is work output. Work output = resistance force x resistance distance.  The work done on a machine is work input.
1 Bakersfield City School District Average Daily Attendance Information.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
PSAA Curriculum Unit Physical Science Systems. Problem Area Energy and Power Systems.
F2:Management Accounting. Designed to give you knowledge and application of: Section D: Cost accounting techniques D1. Accounting for materials D2. Accounting.
NO Credit If an individual has not used credit, they will not have any information in their credit report Not having a credit report can cause an individual.
Business Math 1.4 Commissions.
Productivity and efficiency
Analytical Tools for Process Analysis and Improvement
Section 13-2 Consumer Credit.
Value Stream Costing Mahmoud Al-Odeh, PhD Bemidji State University.
Paper F2 management Accounting.
Paper F2 Management Accounting
Sources of consumer credit
Process and Capacity Analysis Capacity Analysis Tutorial
BASIC INDUSTRIAL ENGINEERING TERMS
Holidays Act 2003 Top 5 Issues
How Do Machines Work Chapter 4 Section 2.
3 MONTHS CM ANALYSIS (DEC’18 TO FEB’19) & FEEDBACK REPORT
Presentation transcript:

Capacity Capacity – Is the maximum amount of work that an organization is capable of completing in a given period of time.

How to determine capacity requirement ? Understand the work load Determine the unit of work Identify service levels for each workload.

Capacity of a sewing line is commonly measured in terms of number of garments produced per shift, per hour or per month. But as garments do not have standardized work content, pcs per hour is not the correct representation of capacity. Capacity of one sewing operator is 60 minutes per hour maximum.

Efficiency It is primarily a measure of the effectiveness of the manager and supervisor and as such is best applied to sections / departments / factories and not the individual operators.

Efficiency = (SMV earned on standard / attended time ) x 100 It is usually calculated for a line and not really relevant to the individual unless incentives are paid on efficiency and not performance.

Efficiency or line utilization is calculated by minutes produced / minutes attended expressed as percentage.

In sewing line of 20 operators a style of 20 SMV is produced in 8 hour shift. If the average daily production of the style is 400 pcs / shift then the line utilization or line efficiency can be calculated as under :

Minutes utilized = SMV x pcs / shift = 20x400 Minutes attended = number of operator X number of minutes per shift = 20 x 480 = 9600 So, the line utilization or line efficiency is 8000 x 100 / 9600 = 83.33% This measure is also called as balance efficiency.

SAM or SMV SAM – Standard Allowed Minutes SMV – Standard minute Value SAM and SMV are considered to be the same. SMV earned is the measure of work done by operator. It is calculated from output from an operation generated in attended minutes and SMV of the operation. SMV earned = ( SMV x output in number of units )

It is usually calculated for individuals as well as for a line. As it is needed for individuals for incentive payment calculation and performance and needed for lines for efficiency calculation. Also sometimes aggregated for departments and factories to get factory efficiency.

Lost time or lost output Reasons for time loss or output loss : Poor balancing No or improper feeding of the cut parts. Non availability of accessories ( thread, zipper, cord etc ) Shifting of operators resulting start up loss. Machine breakdown Loss due to repairs