Traffic assignment.

Slides:



Advertisements
Similar presentations
Unit-iv.
Advertisements

Transport Fundamentals
and 6.855J Cycle Canceling Algorithm. 2 A minimum cost flow problem , $4 20, $1 20, $2 25, $2 25, $5 20, $6 30, $
and 6.855J Dijkstras Algorithm with simple buckets (also known as Dials algorithm)
Feedback Loops Guy Rousseau Atlanta Regional Commission.
Chapter 4: Informed Heuristic Search
Outline Minimum Spanning Tree Maximal Flow Algorithm LP formulation 1.
ITS THE FINAL LECTURE! (SING IT, YOU KNOW YOU WANT TO) Operations Research.
1 1 Slides by John Loucks St. Edwards University Modifications by A. Asef-Vaziri.
Dantzig-Wolfe Decomposition
PRACTICAL IMPROVEMENT: A-STAR, KD-TREE, FIBONACCI HEAP CS16: Introduction to Data Structures & Algorithms Thursday, April 10,
§3 Shortest Path Algorithms Given a digraph G = ( V, E ), and a cost function c( e ) for e  E( G ). The length of a path P from source to destination.
Outline  Recap Network components & basic mechanisms Routing Flow control  Continue Basic queueing analysis Construct routing table.
1 Routing and Wavelength Assignment in Wavelength Routing Networks.
Management Science 461 Lecture 2b – Shortest Paths September 16, 2008.
Shortest Paths and Dijkstra's Algorithm CS 110: Data Structures and Algorithms First Semester,
Vehicle Routing & Scheduling: Part 1
GEOG 111 & 211A Transportation Planning Traffic Assignment.
Vehicle Routing & Scheduling
Chapter 7 Network Flow Models.
Shortest Path Problems Directed weighted graph. Path length is sum of weights of edges on path. The vertex at which the path begins is the source vertex.
Tirgul 13. Unweighted Graphs Wishful Thinking – you decide to go to work on your sun-tan in ‘ Hatzuk ’ beach in Tel-Aviv. Therefore, you take your swimming.
Norman W. Garrick Trip Assignment Trip assignment is the forth step of the FOUR STEP process It is used to determining how much traffic will use each link.
TRIP ASSIGNMENT.
The Shortest Path Problem
1 1 Slide © 2000 South-Western College Publishing/ITP Slides Prepared by JOHN LOUCKS.
NetworkModel-1 Network Optimization Models. NetworkModel-2 Network Terminology A network consists of a set of nodes and arcs. The arcs may have some flow.
Network and Dynamic Segmentation Chapter 16. Introduction A network consists of connected linear features. Dynamic segmentation is a data model that is.
Shortest Paths Introduction to Algorithms Shortest Paths CSE 680 Prof. Roger Crawfis.
1 Shortest Path Calculations in Graphs Prof. S. M. Lee Department of Computer Science.
Source: NHI course on Travel Demand Forecasting (152054A) Session 10 Traffic (Trip) Assignment Trip Generation Trip Distribution Transit Estimation & Mode.
Operations Research Assistant Professor Dr. Sana’a Wafa Al-Sayegh 2 nd Semester ITGD4207 University of Palestine.
Networks and the Shortest Path Problem.  Physical Networks  Road Networks  Railway Networks  Airline traffic Networks  Electrical networks, e.g.,
Some network flow problems in urban road networks Michael Zhang Civil and Environmental Engineering University of California Davis.
TCP Traffic and Congestion Control in ATM Networks
David B. Roden, Senior Consulting Manager Analysis of Transportation Projects in Northern Virginia TRB Transportation Planning Applications Conference.
Minimax Open Shortest Path First (OSPF) Routing Algorithms in Networks Supporting the SMDS Service Frank Yeong-Sung Lin ( 林永松 ) Information Management.
1 1 © 2003 Thomson  /South-Western Slide Slides Prepared by JOHN S. LOUCKS St. Edward’s University.
1 Network Models Transportation Problem (TP) Distributing any commodity from any group of supply centers, called sources, to any group of receiving.
Graphs A ‘Graph’ is a diagram that shows how things are connected together. It makes no attempt to draw actual paths or routes and scale is generally inconsequential.
1 An Arc-Path Model for OSPF Weight Setting Problem Dr.Jeffery Kennington Anusha Madhavan.
CEE 320 Fall 2008 Route Choice CEE 320 Steve Muench.
Distance Vector Routing
Travel Demand Forecasting: Traffic Assignment CE331 Transportation Engineering.
Network Problems A D O B T E C
Spanning Trees Dijkstra (Unit 10) SOL: DM.2 Classwork worksheet Homework (day 70) Worksheet Quiz next block.
CSE 373: Data Structures and Algorithms Lecture 21: Graphs V 1.
Transportation Planning Asian Institute of Technology
Network Analyst. Network A network is a system of linear features that has the appropriate attributes for the flow of objects. A network is typically.
SHORTEST ROUTE PROBLEM A Networking Model Report for DPA 702 QUANTITATIVE METHODS OF RESEARCH By: ALONA M. SALVA Cebu Technological University.
1 1 Slide © 2005 Thomson/South-Western Chapter 9 Network Models n Shortest-Route Problem n Minimal Spanning Tree Problem n Maximal Flow Problem.
Route Choice Lecture 11 Norman W. Garrick
St. Edward’s University
Shortest Path Problems
Shortest Path from G to C Using Dijkstra’s Algorithm
Disjoint Path Routing Algorithms
Network Routing.
Shortest Path.
MATS Quantitative Methods Dr Huw Owens
A* Path Finding Ref: A-star tutorial.
CSE 373: Data Structures and Algorithms
Route Choice Lecture 11 Norman W. Garrick
Communication Networks
Advanced Computer Networks
Chapter 6 Network Flow Models.
Incremental Assignment (fixed demand)
Shortest Path Algorithm for Weighted Non-negative Undirected Graphs
Dijkstra's Shortest Path Algorithm
Shortest Path Solutions
Graphs: Shortest path and mst
Presentation transcript:

Traffic assignment

Transit person trip table (O&D) Vehicle trip table (O&D) Trip generation Trip distribution Mode split Transit person trip table (O&D) Vehicle trip table (O&D) Trip assignment Loaded transit network Loaded highway network

Shortest path-min. tree building what is a tree? If for each origin node h, at the completion of a pass through the algorithm all other nodes in the network are arrived at by one link only, the set of paths from h to the nodes is called “a tree”. The process of determining the minimum cost path is called “tree building”. The tree together with the minimum path costs from the origin node to all destination nodes is referred to as “skimmed tree” (giving rise to the term “skim table” in TDF)

An example tree

Dijkstra’s algorithm function Dijkstra(Graph, source): for each vertex v in Graph: // Initializations dist[v] := infinity // Unknown distance function from source to v previous[v] := undefined // Previous node in optimal path from source dist[source] := 0 // Distance from source to source Q := the set of all nodes in Graph // All nodes in the graph are unoptimized - thus are in Q while Q is not empty: // The main loop u := vertex in Q with smallest dist[] if dist[u] = infinity: break // all remaining vertices are inaccessible from source remove u from Q for each neighbor v of u: // where v has not yet been removed from Q. alt := dist[u] + dist_between(u, v) if alt < dist[v]: // Relax (u,v,a) dist[v] := alt previous[v] := u return dist[] In the following algorithm, the code u := vertex in Q with smallest dist[], searches for the vertex u in the vertex set Q that has the least dist[u] value. That vertex is removed from the set Q and returned to the user. dist_between(u, v) calculates the length between the two neighbor-nodes u and v. The variable alt on line 13 is the length of the path from the root node to the neighbor node v if it were to go through u. If this path is shorter than the current shortest path recorded for v, that current path is replaced with this alt path. The previous array is populated with a pointer to the "next-hop" node on the source graph to get the shortest route to the source.

Dijkstra’s algorithm in plain words 1. to initialize the origin is the only solved node. The distance to the origin is 0. The solved set is empty except the origin node. 2. find all the unsolved nodes that are directly connected by a single arc to any solved node. For each unsolved node, calculate all of the “candidate distances” (there may be several of these for one unsolved node because it may directly connect to more than one solved node): choose an arc connecting the unsolved node directly to a solved node. The “candidate distances” is (the distance to solved node) + (length of arc directly connecting the solved and the unsolved node). 3. choose the smallest candidate distance: add the corresponding unsolved node to the solved set distance to the newly solved node is the candidate distance add the corresponding arc to the arc set 4. if the newly solved node is not the destination node, then go to step 2. Else, stop and recover the solution. length of the shortest route from origin to destination is the distance to the destination node. Shortest route is found by tracing backwards from the destination node to the origin (or the reverse) using the arcs in the arc set. It is usually easiest to trace backwards because each node is reached from exactly one other node, but may have outwards arcs to several other nodes.

An example Find the shortest paths from node 1 to all other nodes in the network 1 6 2 1 4 2 3 2 1 3 5 6

Example solution Step 1: 0 Step 4: 6 1 6 2 1 4 Step 3: 5 2 3 2 1 3 5 6 Solved node list Dist fr O. to node Solved arc set 1 3 2 1-3 5 3-2 4 6 2-4 7 4-6 8 4-5

Another example Find the shortest paths from node A to all other nodes B C D E F G H 3 5 2 13 6 4

Another example Find the shortest paths from node 6 to all other nodes 2 1 2 5 3 5 3 4 3 4 6 3 3 3 8 5

Inputs to assignment O-D matrix Network

Terminology (1) Trip assignment: “loading the network”; volumes are assigned to links Free flow speed: speed under no congestion Free flow travel time: travel time under no congestion Path finding: finding the path with the minimum impedance Path loading: loading vehicles to links comprising a path Level of service: a qualitative measure describing the operation conditions Capacity restraint: the volume loading process is constrained by the capacity of the link

Assignment methods Non-equilibrium (heuristic) assignments All or nothing: link travel times are determined beforehand and trips are assigned at once Incremental assignment: link travel times are updated through fixed proportions and trips are assigned iteratively Capacity constraint: link travel times depend on link volumes and final assignment is the average of the last several iterations

All or nothing assignment Simple all-or-nothing method is the fundamental building block in traffic assignment procedures. Step 1: find shortest paths between origin and destination zones Step 2: assign all trips to links comprising the shortest routes

Incremental assignment A simple but inconsistent way to account for capacity and congestion effects. Step 1: identify shortest paths between origin and destination zones Step 2: assign a fixed portion of the trips to links comprising the shortest routes Step 3: if all assigned, stop, otherwise, continue to step 4 Step 4: update link travel times

Example Consider a simple transportation network that has one origin and one destination and two links/paths that provide access from the origin to the destination. One link is 7.5 miles long and has a capacity of 4000 vehicles per hour and a speed limit of 55 miles per hour. The other link is 5 miles long and has a capacity of 2000 vehicles per hour and a speed limit of 35 miles per hour. Assuming that 5000 drivers wish to make the trip from the origin to the destination, find the loaded network?

All or nothing assignment Link 1 capacity: 4000 vehicles; speed = 55 mph; distance = 7.5 miles Free-flow travel time = 7.5/55 = 8.18 minutes Dest. Link 1 origin Link 2 Link 2 capacity: 2000 vehicles; speed = 35 mph; distance = 5 miles Free-flow travel time = 5/35 = 8.57 minutes All-or-nothing suggests that link 1 is the shortest path from origin to destination and will be assigned with all 5000 vehicles and link 2 will be assigned 0 vehicles

Incremental assignment Link 1 capacity: 4000 vehicles; speed = 55 mph; distance = 7.5 miles Free-flow travel time = 7.5/55 = 8.18 minutes Link 1 Dest. origin Link 2 Link 2 capacity: 2000 vehicles; speed = 35 mph; distance = 5 miles Free-flow travel time = 5/35 = 8.57 minutes Let us first assign 1000 vehicles to link 1 and then update link travel time, which will be: The next 1000 vehicles will still be assigned to link 1, which gives a travel time of 8.26. The next 1000 vehicles will still be assigned to link 1, which results in 9.48 min. Thus, link 2 now becomes the shortest path, and therefore, the next 1000 vehicles to link 2, which gives 8.76 min. Thus, the last 1000 vehicles will be loaded on link 2, which will give a travel time of:

Example: do all-or-nothing and incremental assignment 2 Link 4 4 Link 1 1 Link 3 Link 5 Link 2 3 From\to 1 2 3 4 100 50 Observed O-D flow Link characteristics link 1 2 3 4 5 t0l 10 15 Cl 300 500 150 200