Capacity Enhancement Development Policy and Planning ASIOACG/7 & INSPIRE/3 29 th & 30 th May 2013 Dubai, UAE David Webb (Airservices) & Tomonori Tsuruzono.

Slides:



Advertisements
Similar presentations
Why would you want to do a CPEIR and how might you benefit?
Advertisements

IFATCA's Perspective on TEM and NOSS
Global ATM Operational Concept
International Federation of Air Traffic Controllers Associations Bert Ruitenberg Human Factors Specialist IFATCA's Perspective on TEM and NOSS.
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
Project Portfolio Management for Everyone Knowth Consulting Presents.
Building open regional innovation strategies: New opportunities provided by Smart Specialisation Strategies Claire Nauwelaers Independent STI policy expert.
Continuous Climb Operations (CCO) Saulo Da Silva
PEOPLE MANAGEMENT DEVELOPMENT PROGRAM
INSTRUCTIONAL LEADERSHIP: CLASSROOM WALKTHROUGHS
Rachal Roach Tim Hyder Chris Green
DISTRIBUTED Multi-nodal ATFM Operational Trial project
PBN Airspace Concept Process
1 Get Organised! Dr. Tamara O’Connor Student Learning Development Student Counselling Service
1.4.1 Poverty Alleviation Project Management 1 POVERTY ALLEVIATION PROJECT MANAGEMENT UPA Package 1, Module 4.
Elements of Highway Design Highway Design SafetyEfficiency.
Delmar Learning Copyright © 2003 Delmar Learning, a Thomson Learning company Nursing Leadership & Management Patricia Kelly-Heidenthal
Project Human Resource Management
IPortfolio assignment Mandatory Unit evidence. Centres may use some or all of these activities or some of their own devising to help candidates complete.
Unit4-IT Project BTEC NATIONAL – UNIT 4 Project Management.
Principles and Strategies of KEYS 2.0 Data Analysis and Interpretation GAE Training January 1009 Jacques Nacson Senior Policy Analyst NEA New Products.
High-level forum on strategic planning for statistics: Bishkek, May 2006 Why statistics? Why strategic planning? Presentation by PARIS21 Secretariat.
Certificate IV in Project Management Introduction to Project Management Course Number Qualification Code BSB41507.
Michalis Adamantiadis Transport Policy Adviser, SSATP SSATP Capacity Development Strategy Annual Meeting, December 2012.
Initial thoughts on a Global Strategy for the Implementation of the SEEA Central Framework Ivo Havinga United Nations Statistics Division.
Successful IT Projects slides © 2007 Darren Dalcher & Lindsey Brodie Successful IT Projects By Darren Dalcher & Lindsey Brodie
Service Transition & Planning Service Validation & Testing
CANSO Role in ATFM/CDM in APAC
PROJECT MANAGEMENT. A project is one – having a specific objective to be completed within certain specifications – having defined start and end dates.
Unit4-IT Project BTEC NATIONAL – UNIT 4 Project Management MS PROJECT.
Process Assessment Method
Presentation to QCS Network Seminar 13 December 2012 Customer Contacts Reduction Project.
Role of the Facilitator Dairy Profit Teams
Why must we do Data Teams? We know the implementation of DT benefit STUDENTS -helps teachers identify exceeding/proficient students and plan for targeted.
The Development of BPR Pertemuan 6 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
Required Total System Performance (RTSP) Bernard Miaillier EUROCONTROL Agenda Item 3 EUROCONTROL.
2.4 Key Management Roles KEY CONCEPT
INTEGRATED ASSESSMENT AND PLANNING FOR SUSTAINABLE DEVELOPMENT 1 Click to edit Master title style 1 Evaluation and Review of Experience from UNEP Projects.
SSAP The European Strategic Safety Action Plan (SSAP) The History & Rationale.
A D A P T A T I O N STAP Could contribute to the clarification of the scientific and technical issues underpinning the debate Brainstorming on Social Issues.
Prepared by Amira Selim 31 st October 2009 Revised by Dahlia Biazid Requirements Analysis.
UNIT III. A managerial problem can be described as the gap between a given current state of affairs and a future desired state. Problem solving may then.
P3 Business Analysis. 2 Section F: Project Management F1.The nature of projects F2. Building the Business Case F4. Planning,monitoring and controlling.
AGRO PARKS “The Policy Cycle” Alex Page Baku November 2014.
Moving away from the fish-eye view Integrating Surveys for the Ecosystem Approach 29 May 2013, Ingeborg de Boois (WGISUR)
Best PMP Certification Course in Bahrain
Causal Analysis & Resolution (CAR) Support Category
Facilitation Tool: Team Agreement
Unit 6 Application Design Practice Assignment.
Presented by United Arab Emirates
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
Continuous Climb Operations (CCO) Saulo Da Silva
SIP/2012/ASBU/Nairobi-WP/7
Global ATM Operational Concept
Collaborative Decision Making “Formulating CDM Strategies”
Version 0.1Assessment Method Overview - 1 Process Assessment Method An objective model-independent method to assess the capability of an organization to.
Continuous Climb Operations (CCO) Saulo Da Silva
ASEAN PBN Routes Objectives:
CANSO Role in ATFM/CDM in APAC
Engineering design is the process of devising a system, component, or process to meet desired needs. It is a decision-making process in which the basic.
Data Visualizations Working Group
SESSION 3 Statistical Co-operation in Thematic Areas
BSBWOR301 Organise personal work priorities and development
State Presentation Example
DIAGNOSTIC FRAMEWORK: National Accounts and Supporting Statistics
Balanced Approach to Noise Mitigation
BALANCED ASSESSMENT.
Session 1: How to Have an Effective Meeting
DIAGNOSTIC FRAMEWORK: National Accounts and Supporting Statistics
Performance Monitoring and Feedback
Presentation transcript:

Capacity Enhancement Development Policy and Planning ASIOACG/7 & INSPIRE/3 29 th & 30 th May 2013 Dubai, UAE David Webb (Airservices) & Tomonori Tsuruzono (Emirates Airline)

ASIOACG WG – Dubai – May 2013 Philosophy The Work Program always considers Safety as the first priority; Efficiency and Capacity works are prioritised based on the greatest common benefit, and priorities are agreed by the group; The Safety and Efficiency balance is considered; and The work program is aligned with ICAO Policies and Plans

ASIOACG WG – Dubai – May 2013 Identify (Desired Operational Outcome) Analyze (Constraints or gaps that need to be overcome) Plan (Solution) Adapt (Monitor and Review) Process

ASIOACG WG – Dubai – May 2013 Identify Identify desired operational outcome Problem on ATC and/or Operator Efficiency enhancement. Area in the region Timing in the day and/or year

ASIOACG WG – Dubai – May 2013 Analyse Determine the Constraints or gaps that need to be overcome Determine root cause and related factors Determine Adaptable ASBU concept. Measure the required level. What item need to be considered for achieve ASBU concept.

ASIOACG WG – Dubai – May 2013 Plan Adaptable technology and technique Evaluate requirement for ANSP and Airline Assign tasks to ANSP and Airline Schedule detail tasks. Agree priority

ASIOACG WG – Dubai – May 2013 Adapt Monitor the process and track the tasks Evaluate the result of works. Check further requirement of enhancement.

ASIOACG WG – Dubai – May 2013 Policy Discussion Include in ASIOACG Terms of Reference?

ASIOACG WG – Dubai – May 2013 Questions, Discussion & Agreement Refer to Discussion Paper –Capacity Enhancement Development Policy and Planning