Purpose overview of the form and use of the AER’s augex tool Not

Slides:



Advertisements
Similar presentations
CHAPTER22 CASH FLOW STATEMENTS.
Advertisements

Multiple Indicator Cluster Surveys Survey Design Workshop
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
Bruce Mountain Director Electricity Tariff Revolution: some questions Presentation to Energy Efficiency Council Annual Conference.
Nuttall Consulting. Purpose overview of the form and use of the AERs repex tool Not Detailed reference material on the underlying spreadsheets Defence.
CE Electric UK – Potential developments in long-term charging arrangements and IDNO charging methodologies 1 April 9, 2008 Potential developments in long-term.
Revenue Metering. 2 The Settlements Process Transfer Funds $ $ Invoice Participants Reconcile Markets Gather and Process Metering Data.
SAMPLE DESIGN: HOW MANY WILL BE IN THE SAMPLE—DESCRIPTIVE STUDIES ?
A DNO Perspective by Stephen Parker for Structure of Charges Workshop 15 July 2003.
The Australian Energy Regulator Expenditure Forecast Assessment Guidelines Opex base-step-trend 8 May 2013.
Preliminary Impacts of Wind Power Integration in the Hydro-Qubec System.
Presentation Subject Header Connected for Success Appendix C- Audit Requirements Economic Benchmarking Backcast Data Template.
The Australian Energy Regulator Expenditure Forecast Assessment Guidelines General discussion of draft guidelines 2 September 2013.
US Department of Energy Smart Grid Computational Tool (SGCT) Overview Note: View presentation in Slide Show mode for best results
TNSP Outputs for Use in Economic Benchmarking AER Economic Benchmarking Workshop #2 14 March 2013 Denis Lawrence and John Kain.
The Australian Energy Regulator Public Forum April 29 Expenditure incentive guidelines Presentation on key issues.
Spreadsheet Demonstration New Car Simulation. 2 New car simulation Basic problem  To simulate the profitability of a new model car over a several-year.
1 © 2012 John Wiley & Sons, Ltd, Accounting for Managers, 4th edition, Chapter 14 Strategic Investment Decisions.
Better Regulation Expenditure Forecast Assessment Guideline 12 February 2013.
1 Econometric Load Forecasting Peak and Energy Forecast 06/14/2005 Econometric Load Forecasting Peak and Energy Forecast 06/14/2005.
2011 Long-Term Load Forecast Review ERCOT Calvin Opheim June 17, 2011.
The Australian Energy Regulator. Today’s agenda Presentations from : ◦AER — Chris Pattas, General Manager - Networks ◦Consumer Challenge Panel — Hugh.
An Overview of Our Regulatory Proposal
Adeyl Khan, Faculty, BBA, NSU Compared to planning, developing org. structure, developing strategies, goals and motivating employees.
The Australian Energy Regulator Expenditure Forecast Assessment Guideline Category analysis Connections and Customer Driven Works.
1 Topics for discussion Network services Calculating RAB allocation Calculating average asset age Calculating line and cable.
VENCorp Revenue Proposal 1 July 2008 to 30 June 2014 Initial Public Forum Presentation.
So What? Operations Management EMBA Summer TARGET You are, aspire to be, or need to communicate with an executive that does not have direct responsibility.
Board Staff Presentation Stakeholder Conference – August 5-8, 2008 INCREMENTAL CAPITAL MODULE July 28, 2008.
Draft decisions Access Arrangements for APT Allgas and Envestra (Qld) Warwick Anderson General Manager, Network Regulation 1 March 2011 Public.
Business Funding & Financial Awareness CAPITAL BUDETING J R Davies May 2011.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
The Australian Energy Regulator Expenditure Forecast Assessment Guidelines Applications of Economic Benchmarking Techniques 6 June 2013.
Australian Energy Regulator Predetermination conference: AER draft decisions on NSW electricity distribution regulatory proposals December 2014.
Ad Hoc Constraints Objectives of the Lecture : To consider Ad Hoc Constraints in principle; To consider Ad Hoc Constraints in SQL; To consider other aspects.
ERCOT Long-Term Demand and Energy Forecasting February 20, 2007 Bill Bojorquez.
BPA M&V Protocols Overview of BPA M&V Protocols and Relationship to RTF Guidelines for Savings and Standard Savings Estimation Protocols.
The Australian Energy Regulator. Today’s agenda Presentations from : ◦ AER – Chris Pattas, General Manager – Networks ◦ Consumer challenge panel – Ruth.
Highway accident severities and the mixed logit model: An exploratory analysis John Milton, Venky Shankar, Fred Mannering.
The Australian Energy Regulator Economic benchmarking TNSP outputs data.
The Australian Energy Regulator Public Forum NSW electricity distribution & transmission revenue proposals July 2014.
The Australian Energy Regulator Expenditure Forecast Assessment Guidelines Auditing requirements for RINs and economic benchmarking data 9 October 2013.
Better Regulation workshop distribution outputs and environmental factors.
FRAMEWORK FOR FINANCIAL REPORTING
Getting Ready! Potential issues for consumers Ergon Distribution Network Regulatory Proposal Bev Hughson, Consumer Challenge Panel (CCP) 2 September 2014.
Building Simulation Model In this lecture, we are interested in whether a simulation model is accurate representation of the real system. We are interested.
The Australian Energy Regulator Expenditure Forecast Assessment Guideline Category analysis Connections and Customer Driven Works.
HOUSEHOLD AVERAGING CAS Annual Meeting 2007 Alice Gannon November 2007.
DNPC08 Review of Standard LDZ System Charges 6 September 2010.
Blue Grass Energy Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
The Australian Energy Regulator Economic benchmarking DNSP outputs and environmental factors.
Getting Ready! Potential issues for consumers Queensland Distribution Network Regulatory Proposals Bev Hughson, Consumer Challenge Panel (CCP) 8 August.
Demand Forecast Deviations Working Group Presented to: Stakeholder Advisory Committee Presented by: Pat Doran January 24, 2007.
Public Forum 10 December 2014 SAPN Regulatory Proposal Bev Hughson Consumer Challenge Panel Member.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
Default price-quality paths for gas pipeline services Briefing on the Commission’s final decision for financial market analysts 28 February 2013.
Capex Regulation in Australian NEM NZ Commerce Commission workshop – March 2010.
Transmission Pricing Webinar 12 October Agenda for Webinar Introductions Purpose Potential Areas of Change – Overview –Revenue Proposal –Business.
Identifying drivers of expenditure. Reasons for spending money 2 Effective regulation requires an understanding of why a business spends money Many different.
Top-down models of operating and capital expenditure.
Submission on the draft ODV Handbook WEL Networks 14 th April 2004.
Examples of capital expenditure models. Overview 2 Capex models developed and used by a number of regulators internationally Most commonly used as part.
MANAGEMENT AND COST ACCOUNTING
Distribution Loss Factors for Cost To Serve study
First Quarter Fiscal Year 2016
Resource Adequacy Demand Forecast Coincidence Adjustments
LDZ System Charges – Structure Methodology 26 July 2010
MECH 3550 : Simulation & Visualization
AUG Query Responses 21st November 2013.
Oklahoma Municipal Retirement Fund Asset Allocation Discussion
Presentation transcript:

Augmentation capex regulatory tool - AER augex tool tutorial Presentation Nuttall Consulting

Purpose overview of the form and use of the AER’s augex tool Not Detailed reference material on the underlying spreadsheets Defence of the tool’s regulatory role and suitability Nuttall Consulting

Summary Background Augex model data requirements Overview of workbook – augex modelling tool Overview of augmentation algorithm Discussion of issues raised Nuttall Consulting

Background Nuttall Consulting

Background – capex category Capex driver Capex activity Replacement Additional assets Demand driven: customer connection replacement and development of assets to facilitate the connection of customers Augex tool Demand driven: augmentation replacement and development of network assets to increase the capacity of the network Repex tool Non-demand driven replacement of aged assets with modern equivalents installation of new assets Nuttall Consulting

Background - key aims Regulatory tool NOT planning/management tool Should account for main driver at aggregate level but not concerned with excessive detail Allow intra- and inter-company comparisons Targeting of matters for detailed review Development of benchmarks But not intended to determine specific network constraints and solutions Nuttall Consulting

Overview Similar in form to repex tool Asset state network utilisation and capacity growth in peak demand Planning parameters utilisation thresholds augmentation costs Outputs forecast capacity forecast costs forecast utilisation Similar in form to repex tool Similar to tools used by ESV and NSPs Nuttall Consulting

Overview Tool is spreadsheet based - uses VBA functions Does not rely upon proprietary – or “black box” – algorithms Uses probability model – to apply utilisation threshold relatively simple to independently verify Asset utilisation = peak loading / normal rating Nuttall Consulting

Anticipated application Augex tool assessment 1 - Base-case Prepare individual DNSP models based upon DNSP data 2 - Calibration Derive planning parameters from actual historical information of DNSP Prepare individual DNSP calibration models 3 - Comparison Derive benchmarks parameters based upon set of DNSPs’ calibrated planning parameters Prepare individual DNSP benchmark models inform other elements of the review for example, targeting matters for more detailed review, set expenditure allowance Nuttall Consulting

Data requirements Nuttall Consulting

Network representation - segments Multiple network segments used to improve accuracy allows for differences between networks reduce impact of aggregation e.g. differences in planning parameters Individual segments represent typical planning components sub-transmission lines – load type and/or arrangements sub-transmission/zone substations – load type and/or transformer number distribution feeder – load type distribution substations – load type 15 – 30 separate segments Nuttall Consulting

Network representation - grouping Each network segment must be assigned to a group allows aggregation for analysis and reporting Example distribution groups Sub-transmission lines CBD distribution feeders CBD distribution substations Sub-transmission substations Urban distribution feeders Urban distribution substations Zone substations Short rural distribution feeders Short rural distribution substations Long rural distribution feeders Long rural distribution substations Nuttall Consulting

Segment input data For each network segment Asset state data Utilisation profile – array of the capacity (MVA) of assets at utilisations (0% to 151% - in 1% increments) Utilisation annual growth rate – %pa average over study period Planning parameters Utilisation threshold – mean and standard deviation (assumes a normal distribution) Capacity factor – capacity added = capacity factor x capacity requiring augmentation Augmentation unit cost - (k$ per MVA of capacity) Nuttall Consulting

Data – asset status Obtain: loading, rating, type and growth data Form of data required: loadings, ratings, types, should reflect actual data individual components: sub-transmission lines and substations, zone substations, and distribution feeders grouping of data for distribution substations (and LV feeders?) latest loading and rating data is used to develop utilisation profile input other actual data is used to assess changes (calibration) Nuttall Consulting

Data – asset status General comments Actual maximum demand should exclude abnormal operating conditions Maximum demand estimate acceptable if not directly measured Distribution feeders – trunk model maximum demand at feeder exit rating of main trunk section Distribution substations expect segments to be based upon load type or categories of substation capacity or substations type Demand growth rates – most appropriate that are available for category Nuttall Consulting

Data – capex and capacity Obtain: historical and future capex and capacity Form of data required: Capex should be exclusive of corporate overheads Unmodelled capex – separately identify augmentation capex that is not considered to be related to utilisation and peak demand growth Assuming there will be an “augmentation” capex category in the regulatory reporting requirements – overall capex should be reconcilable to this category The type of capacity should reflect rating types defined for asset status Capex ideally should be “as commissioned” Nuttall Consulting

Supporting information Explanations of data sources, calculations, assumptions for tool data inputs rationale for segments if defined by NSP basis of asset status data - maximum demand, ratings, growth rates derivation of planning parameters Nuttall Consulting

Possible other supporting information Other responses to aid understanding of data Inclusions and exclusions in capex actual development costs, direct project analysis/planning costs, other costs allocated to the project Capex-capacity allocations rules it is expected that internal systems may not align to AER groups Explanation of unmodelled capex Project/program descriptions, drivers, outcome on capacity Comparability with other DNSPs Differences that may impact augmentation requirements – utilisation levels, project types and costs Nuttall Consulting

Overview of workbook Nuttall Consulting

workbook structure Input sheets Output sheets Chart sheets Model initialisation data sheet – “Tables” segment data input sheet – “Asset data” Output sheets Asset category summary sheet – “Utilisation profile summary” Augmentation forecast sheet – “aug forecast” Chart sheets Utilisation profile – “utilisation profile chart” Augmentation forecast – “Forecast Ch1” and “Forecast Ch2” Internal calculation sheets Nuttall Consulting

Overview of demo model Nuttall Consulting

See handbook for more detailed reference material Nuttall Consulting

Augmentation algorithm Nuttall Consulting

Forecasting – for each segment probabilistic model to account for variations in the threshold (similar to asset lives in repex model) Nuttall Consulting

VBA function Array function =aug_calc(utilisation profile index, capacity profile, growth, capacity factor, utilisation threshold, SD, method, years) Inputs utilisation profile index – array of utilisation (%) increments capacity profile – array of capacity (MVA) matched to utilisation profile index growth – average per annum compound growth in peak demand (%) capacity factor – as discussed utilisation threshold – mean utilisation at augmentation point (%) SD – standard deviation of utilisation at augmentation point (%) method – augmentation algorithm method (only 1 at this time) Years – number of years for forecast Outputs Array of forecast capacity added by year Array of forecast average utilisation by year Nuttall Consulting

VBA function – worked example Assume a network segment is defined in the model Where – utilisation threshold Mean utilisation threshold = 65% SD of threshold = 5% Capacity factor – 0.5 (i.e. add 1 MVA for every 2 MVA requiring augmentation) Augmentation cost = $1,000 per MVA added Nuttall Consulting

VBA function – worked example VBA function steps through each element of the utilisation profile to prepare a forecast for the existing capacity at that utilisation level That is, the capacity that has survived to that utilisation level For each element of capacity in the utilisation profile Step 1 – calculate for each forecast year the amount of capacity requiring augmentation (the probabilistic calculation) Step 2 – calculate the amount of capacity to be added (using the capacity factor) Post-function calculation - expenditure forecasts calculated outside of VBA function as - capacity added x augmentation cost For example, assume we still have 100 MVA that is utilised at 60% Nuttall Consulting

Step 1 – probability calculation Proportion of capacity requiring augmentation (CRA) at utilisation, u, given the capacity has survived to be utilised at 60% = 𝑢𝑛𝑐𝑜𝑛𝑑𝑖𝑡𝑖𝑜𝑛𝑎𝑙 𝑝𝑟𝑜𝑏𝑎𝑏𝑖𝑙𝑖𝑡𝑦 𝑓𝑜𝑟 𝑎𝑢𝑔𝑚𝑒𝑛𝑡𝑖𝑛𝑔 𝑎𝑡 𝑢𝑡𝑖𝑙𝑖𝑠𝑎𝑡𝑖𝑜𝑛, 𝑢 𝑢𝑛𝑐𝑜𝑛𝑑𝑖𝑡𝑖𝑜𝑛𝑎𝑙 𝑝𝑟𝑜𝑏𝑎𝑏𝑖𝑙𝑖𝑡𝑦 𝑓𝑜𝑟 𝑎𝑢𝑔𝑚𝑒𝑛𝑡𝑖𝑛𝑔 𝑤ℎ𝑒𝑛 𝑢𝑡𝑖𝑙𝑖𝑠𝑒𝑑 𝑎𝑏𝑜𝑣𝑒 60% Nuttall Consulting

Step 1 – transform u to year using peak demand growth for that segment – assume here it is 2% pa. transform the x-axis from utilisation to forecast year Nuttall Consulting

Step 2 – capacity added For each forecast year Using forecast capacity requiring augmentation (CRA) Capacity added = CRA x capacity factor For example in year 1, CAR is 7.7 MVA (utilised at 61.2%) Capacity added = 7.7 MVA x 0.5 = 3.9 MVA Utilisation of augmented capacity = demand associated with CAR / (CAR + capacity added) = (7.7 x 61.2%) / (7.7 +3.9) = 41% utilisation Return to step 1 to calculate any later augmentation associated with this augmented capacity. Nuttall Consulting

Common issues Nuttall Consulting

Common issues raised Anomaly for high growth rates More detail in manual HV trunk feeder model Use of N-1 rating rather than N for utilisation Sensitivity to utilisation threshold Including LV segments Clarifications on modelling certain circumstances Cross feeder ties Non-trunk HV feeder augmentations Projects with long lead times Meshed networks Preparing $/MVA for different projects Weather correcting utilisation Augmenting one segment to address constraints on other segments Nuttall Consulting

Questions? Nuttall Consulting