Potential Second Access Currently we are working on approval access to 2 nd Avenue under CP tracks as shown in top left photo. Our entrance would be across.
Final Project 7th semester Maria Amparo Prieto Project: Svanekøkkenet Århus Office Building.
CERTIFICATE 4 IN BUILDING BCGBC4004A. 18 week course First 10 weeks in classroom Following 8 in computer room 1.30pm pm (with 15 min break) Assessments.
Estimating & Tendering. Estimating work involves dealing with Measurements and quantities Pricing and rates Subcontract packages Tender preparation.
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
What are they and what are they used for?. Contract Documents Architects working drawings Specifications Schedules Bill of Quantities.
John Boon ZUT November Procurement Systems The organisation of the interaction between the purchaser of a new building and the suppliers of goods.
CERTIFICATE 4 IN BUILDING BCGBC4004A N. Preston / M Martin Cert IV Estimating 2012.
HOUSE BUSINESS COMMITTEE PRESENTATION BY GHRC ON CITY GATE PROJECT 13 th October, 2014.
How to do an estimate. Steps 1) Estimate from bottom up –How you construct the project –Lets you get an understanding of project path –Lets you find errors.
Activities CTC-415. Activity Consumes Time Usually consumes resources (cure time for concrete) Definable start and finish Assignable – V. important –
Construction Technology Bachelor of Science (hons) in Quantity Surveying ITS April 2008.
Review of Plans & Estimating Introduction Architect’s Responsibilities Types of Estimates Factors Affecting Cost Film Project:
REPLACEMENT AND MAINTENANCE OF LIFTS GIVING ACCESS TO LHC UNDERGROUND AREAS TENDERING PROCEDURE IT-4056/EN 105 December 2014 Floris Bonthond.
Building Industry Game B.I.G. - Building oror Building/Heavy Associated Schools.
Owner Has Idea and Conducts Feasibility Study GoNo Go End of Project Pursue A/E Hire A/E to Design Project Scope of Work Defined Contract Negotiated Go.
TENDERING PROCEDURE IT- 3927/EN
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Specification & Quantities Estimating
Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
An-Najah National University Faculty of Engineering Civil Engineering Department Construction Project Management “Medical Center In Al-Daheria” Prepared.
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
P ROJECT M ANAGEMENT. Case study Assumptions Methodology Discussion.
CON 2001 CVE 4070 Construction Methods/Engineering Changes & Extra Work Prof. Ralph V. Locurcio, PE.
1 EASTERN MEDITERRANEAN UNIVERSITY FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING CIVL 493 Construction Management Assoc. Prof. Dr. Ibrahim YITMEN.
CON 2001 Construction Methods Tool #1 - Construction Scheduling Presented by Elia Twigg, P.E. (Prof. Ralph V. Locurcio, P.E.)
Final Accounts. Accounts Submissions Last Bill for Contracted Works ( excluding Retention) Presented at Practical Completion Practical Definition dependant.
FINAL PROJECT 7TH SEMESTER ARCHITECTURAL TECHNOLOGY AND CONSTRUCTION MANAGEMENT M ARTA G AGO P ENALBA PROJECT : 32 DWELLINGS IN VEJLEVEJ.
Marketing to Main Contractors Winning Work from a Main Contractor Paul Clarkson Iain Flatters Construction Director Group Procurment Manager.
PWGSC - KOREA 2nd JCC Meeting Canadian Federal Real Property Construction Contracting Presentation by Bruce Fletcher Director General – CASMS - PWGSC November.
Contract and Tender form Phases of Designing Phases of Implementation VIA / TCU 4th semester workshop S2016 Contract and Tender form S2016 VIA University.
Construction Tender Process Tender steps between Client, Contractor and Subcontractor Dr A Kimmance.
Roles and responsibilities PM
Project Management Lecture 22
Construction prodecure of Building
Temporary Works – P8 Project Practice.
Estimating Project Costs
Contractor’s Post-contract Cost Management Processes
RIBA Plan of Work 2013.
TENDERING PROCEDURE IT-3981/EN
Highways & Infrastructure Best Value Construction Procurement Presentation November, 2017.
Civil Engineering Construction Technology and Organization
The project's conception: A feasibility study is done
Awarding Criterion for late tender: the lowest bid- why?
Awarding Criterion for late tender: the lowest bid- why?
HANDICAPPED PEOPLE RESIDENT
The Documents Necessary for Tendering a Project for Bids:
The Documents Necessary for Tendering a Project for Bids:
Pier Foundations Piers Suspended floor Ground beam Next slide.
Wellington Condominiums Project
Structured Solutions Inc. IMS Definition
Construction Engineering Change Order - 2 Prof. Ralph V. Locurcio, PE
Time schedule for implementation as main contractor
Construction Engineering Change Order - 2 Prof. Ralph V. Locurcio, PE
Quantities and Price.
The project´s specifications, and the connection between the contract´s different specifications.
Quantities and Price.
TCU-PROJECT: 7TH Semester Course
Contract and tender form Phases of designing Phases of implementation
Recap QUANTITIES Taking out quantities
Payment of the contractor: the cumulative value of work done
Wbs, CONTRACTORS & GIVING A BID
Procurement & Strategic Sourcing
The Form of Procurement for the EcoHome Project
RIBA Plan of Work 2013.
Muskat Secondary School Project
Architecture & Interiors Design Process
QUANTITIES Taking out quantities
Advancd Measurement and Contract Administration
Presentation transcript:

6th. Semester Schedule: 1st. Week

6th. Semester Schedule: 2nd. Week

6th. Semester Schedule: 3rd. Week

Link to CAM re Successive Estimation (Page 39-43) 6th Semester Plan On the basis of the delivered 3D model from the Client, each contractor-group has been invited to bid for the project. So, in this 6th Semester, each group is a main contractor. Each group must: Submit a bid on the delivered bidding forms at the presentation on 12th March We pretend that each group is a winner, and must plan the execution of the project (use MS-Project) – establish a time schedule for the works of the main contract, establish the layout for the building site (cabins, cranes, roads, etc.), look at site safety and quality assurance. Student-groups must present this on 16th March. A simulation of the execution of works is done, and groups must fill-in interim certificates for the works done, and do the final costs report for the project. Do the handing-over procedure for the project to the Client. Student groups present 3 and 4 on 22nd March Link to CAM re Successive Estimation (Page 39-43)

Awarding Criterion for late tender: the lowest bid- why? Because: when the project goes to Detail Design, the Client has 100% influence on the design of the project (i.e. the project´s quality and quantity has been stated), so the only criterion left to compete on is the price!!

Each group must submit a bid for the project by 12th March Main (Prime) Contracting, which is usually used in connection with ”late tender” on the basis of an architect´s detail design project, will be the basis for this project. Client Client´s Brief Client´s architect does 3D model design The Client seeks the lowest bid on the basis of the design done by his architect, which in this case, is the delivered Revit 3D Model. Each group must submit a bid for the project by 12th March MAIN CONTRACTOR A (Company A) MAIN CONTRACTOR B (Company B) Contractor´s estimation division works-out bid Contractor´s estimation division works-out bid The contractor with the lowest bid wins the contract and gets to do the construction on site, but in this “school situation”, everyone will simulate construction on site

Concrete Element Works: (alternative as insitu cast walls/slabs) The estimation comprises the Main Contractor´s own production, and is as follows: Concrete Works: Stripping necessary topsoil (for whole site area) to a depth of 20 cm. and soil excavation in connection with establishing foundations, basement structures, and slabs, etc. Formwork and concrete works in connection with the aforementioned structures Concrete Element Works: (alternative as insitu cast walls/slabs) Establishing concrete wall and slab structures in the building, including all mounting, casting, shoring, formwork and scaffolding. Masonry Works: All brickwork cladding on outer walls, tile-work in and on bathrooms´ walls and floors. Building Site: site establishment and management must be supplied by the Main Contractor The cost of the Carpentry, Painting & Finishing, and M&W works have been priced by sub-contractors (see next slide). These must be added to the Bidding Form. The Ground and Sewage Works will be delivered by the Client himself Each Group must consider themselves to be a Main Contractor, and they must price their own works (in red below) and the building site establishment and management. Used the delivered spreadsheet for Successive Estimation

The Tender Time Schedule for the Project

THE WBS (Work Breakdown Structure ) is the prerequisite for CALCULATING THE COST OF THE PROJECT AT DETAIL DESIGN PHASE (or DESIGN DEVELOPMENT PHASE) Note: the items on WBS correspond to the Bidding Forms

When your group has estimated the cost of the Building Site, Concrete Works, Masonry Works, and Concrete Element Works, add on the given prices for the Carpentry, M&E and Painting and Finishing works, and submit the bid on the delivered Bidding Forms in a closed envelope on the 3rd March to the teachers The completed bidding forms will form the basis for the “competition” between groups