NREL Wind Integration Workshop By Electric Power Systems, Inc. June 28-29, 2010.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

1 FREQUENCY LINKED DISPATCH AND ELECTRICITY PRICING (An unconventional approach for tackling the peculiar problems existing in India) - Bhanu Bhushan -
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
NAESB Coordinate Interchange Version 1 Standard Revision 1, Draft 5 August, 2005.
NAESB Coordinate Interchange
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
WORKSHOP ON UTILITY WIND INTEGRATION STUDIES: MODELS AND METHODS Panel 6 – Base Load Unit Cycling Costs Gene Danneman P.E. June 24 & 25, 2010.
Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
Pacific Gas and Electric Company Long Term Procurement Plan Proceeding Renewable Integration Model Results and Model Demonstration October 22, 2010 Workshop.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
0 - 0.
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
BREAKOUT SESSION 2 Smart Grid 2-B: Grid Integration – Essential Step for Optimization of Resources Integrating Intermittent Wind Generation into an Island.
Standard Market Design (SMD) in New England Federal Energy Regulation Commission Conference on Standard Market Design January 22, 2002 David LaPlante Vice.
TIM MASON RENEWABLE RESOURCE INTEGRATION IEP ASSOCIATION ANNUAL MEETING FALLEN LEAF LAKE 5 October 2011.
1 Overview. 2 Benefits of RATC Applications Real-time corrective Hour ahead corrective and preventive Day ahead corrective Day ahead market/economic based.
Capacity Planning For Products and Services
© New York Independent System Operator, Inc. All Rights Reserved. New Challenges Facing System Operators Stephen G. Whitley President & Chief.
© S Haughton more than 3?
Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
1 Review of AC Circuits Smith College, EGR 325 March 27, 2006.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
© 2012 National Heart Foundation of Australia. Slide 2.
SSG-WI System Model Data Requirements [PART 1] September 5, 2002 Las Vegas, NV.
Electricity distribution and embedded renewable energy generators Martin Scheepers ECN Policy Studies Florence School of Regulation, Workshop,
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
Week 1.
California Energy Commission 1 Energy Workshops for W&WW Agencies UTILITY STRATEGIES FOR SHIFTING PEAK DEMAND PERIOD WATER & ENERGY USE REGIONAL STRATEGIES:
We will resume in: 25 Minutes.
CpSc 3220 Designing a Database
ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
Making Clean Local Energy Accessible Now December 16, 2013 Flattening the Duck Dynamic Grid Solutions for Integrating Renewables.
NREL Wind Integration Workshop By Electric Power Systems, Inc. June 28-29, 2010.
Challenge of Large Scale Wind Power Integration - Introduction to the Workshop Pradeep Perera Principal Energy Specialist Asian Development Bank.
Jim Mcintosh Director, Executive Operations Advisor California ISO Independent Energy Producers 2011 Annual Meeting - October 5, 2011 Stanford Sierra Conference.
Aidan Tuohy Technical Leader/Project Manager, EPRI ERCOT Emerging Technology Working Group (ETWG) 09/24/2014 Transmission System Considerations for Integrating.
Integration of Large-Scale RES in Island Power Systems Prof. Nikos Hatziargyriou, National Technical University of Athens
Electric Power Infrastructure: Status and Challenges for the Future Mark Lauby Director, Reliability Assessments and Performance Analysis.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Avista’s Flexibility Overview James Gall Senior Power Supply Analyst Contact:
Golden Valley Electric Assoc. Inc © 2012 GVEA. All rights reserved. GVEA BESS Expected and Actual Performance Dan Bishop Golden Valley Electric Assoc Fairbanks,
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Overview What's is micro grid Over view of electric grid
K E M A T & D C O N S U L T I N G Power System Conference, Clemson, South Carolina, March 8-11, 2005 Principles and Issues Relating to the Interconnection.
Daudi Mushamalirwa Luanda June, 2014 Technical issues of the stability of small size electric systems composed of wind generators and conventional generating.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
Integrating Wind Energy Capabilities of Wind Power Plants Mark Ahlstrom Wind Energy: A Good Citizen of the Electric Grid Four Corners Wind Resource Center.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
Current Operational Challenges Computing the West – North Limits Potential IROLs Local Voltage & Thermal issue (OOME) High Voltage Outages.
Oncor Transmission Service Provider Kenneth A. Donohoo Director – System Planning, Distribution and Transmission Oncor Electric Delivery Co LLC
Smart Grid Vision: Vision for a Holistic Power Supply and Delivery Chain Stephen Lee Senior Technical Executive Power Delivery & Utilization November 2008.
October 15, 2012 PV & Storage Workshop ERCOT’s Interconnection Process John Adams Principal Engineer.
This module will dig deeper into Smart Grid implementation issues. It will focus on two key issue of particular interest to the PNW: 1)How the Smart Grid.
Minnesota Renewable Energy Integration and Transmission
Wind Management at MISO
Grid Integration of Intermittent Resources
Planning Tools Overview
MIT tour of the California ISO Control Center March 31, 2015
EU-IPA12/CS02 Development of the Renewable Energy Sector
Module 4 Smart Grid Implementation Issues
RE Grid Integration Study with India
Planning Tools Overview
Solar Energy Commercialization
Jim Mcintosh Director, Executive Operations Advisor California ISO
Presentation transcript:

NREL Wind Integration Workshop By Electric Power Systems, Inc. June 28-29, 2010

Wind Integration in the Railbelt Challenges and Issues - Islanded Electrical System - Power Regulation - Transmission Capacity - Wind Forecasting & Scheduling - Dispatch & Control Responsibility - Control Agreements & Implementation - Voltage Ride-Through Requirements - Frequency Ride-Through Requirements Slide 2

Wind Integration in the Railbelt Challenges and Issues - Curtailment Procedures & Authority - Fuel Impacts - Hydro-Thermal Inefficiency - Transient Stability, Short Circuit - Transmission Access Slide 3

Islanded Power Systems Limited Inertia - Displaced hydro/thermal decreases frequency stability - Increased transient frequency excursions Unit Displacement - Difficult to displace thermal units due to lack of emergency support Limited Voltage Stability - Displacement of base load units can increase voltage instability Limited Regulating Units Slide 4

Power Regulation Upward Regulation - Amount of unloaded capacity on other generation units that can be used to make up for decreases in wind power Downward Regulation - Amount of loaded generation capacity that can be unloaded to allow for increased wind energy Regulation Expense - Regulation costs vary with unit commitment, time of day and type of unit. Slide 5

Power Regulation Regulation Ramp Rate - The rate at which generation can increase up or down to meet changes in load or wind generation - Regulation ramp rates are generally limited to 4-5% of the units capacity/minute for long-term unit maintenance - Typical ramp rates for thermal units in Railbelt range from1.25 MW/ minute to 3.4 MW/minute - Typical ramp rates for hydros range from 5 MW/minute to 25 MW/minute - Hydros have time constants of 7-15 seconds for upward regulation Slide 6

Transmission Capacity Transmission Constraints - Anchorage – Fairbanks Intertie - Anchorage – Kenai 115 kV line Transmission today is scheduled energy delivery Following wind integration, transmission must include regulation capacity Transmission utilization will decrease with regulation scheduling Slide 7

Transmission Capacity Transmission capacity constraints including regulation will reduce spill energy available from Bradley Transmission capacity including regulation constraints will decrease energy deliveries from Kenai Slide 8

Wind Forecasting & Scheduling Forecast for daily/weekly wind energy Interchange scheduling between utilities Responsibility for forecast deviations Wind modeling and development costs Slide 9

Dispatch & Control Responsibility for wind monitoring & control area interchange Alarm and control responsibility Curtailment control Slide 10

Control Agreements Control agreements required for dynamic scheduling Hardware/software changes required for dynamic scheduling Coordination of regulation capacity requirements Slide 11

Voltage Ride-Through VRT is defined for both high and low voltage conditions Transmission, subtransmission and distribution reclosing coordination requirements Consistency throughout Railbelt Slide 12

Frequency Ride Through FRT is defined for both high and low frequency conditions Must coordinate with Railbelt generation Cumulative wind capacity may represent the largest contingency on the Railbelt FRT must be consistent throughout Railbelt Slide 13

Curtailment Procedures/Authority Curtailment of wind for generation requirements Curtailment for transmission Curtailment for system conditions Curtailment between control areas Curtailment by host control area Unauthorized disconnects Incident resolution Slide 14

Fuel Impacts Off-schedule wind energy – off-schedule gas requirements Gas scheduling requirements by plant Gas penalties applicable to over/under utilization, 3,000 mcf/day Gas penalties $30/mcf for variance Gas delivery may not be capable of sustaining generation ramp rates Penalty allocation will be difficult Slide 15

Hydro-Thermal Inefficiency Hydro currently utilized to: - Mitigate gas constraints - Mitigate transmission constraints - Mitigate thermal generation costs Hydro value is currently optimized to result in least cost generation Hydro not scheduled during off-peak or shoulder load periods depending on thermal unit commitments Slide 16

Hydro-Thermal Inefficiency Hydro with wind integration: - Provide regulation capacity on hydro & thermal units - Mitigate gas constraints - Mitigate transmission constraints - Mitigate thermal generation costs Hydro optimized to provide regulation Hydro scheduled during all load periods with insufficient thermal regulation Balance of regulating hydro energy vs ponded wind energy difficult to forecast Slide 17

Transient Stability, Power Flow, Short Circuit Impacts Standardized procedures and methodologies across Railbelt Wind models for each important, but difficult to obtain Without unit de-commitment, not much impact on stability, power flow or short circuit Slide 18

Transmission Access Transmission access costs and methodologies must be developed across Railbelt WTG facilities on other circuits need system specific transmission rates Transmission interconnection studies and requirements should be consistent Slide 19