High Level Features of UK-Link Replacement

Slides:



Advertisements
Similar presentations
Liz Pearce / Ruth Martin 2003
Advertisements

The Prime Ministers Chief Science Advisor Sir Peter Gluckman Waikato Management School Friday 10 May 2013 Briefing for scientific community National Science.
Future Airspace Strategy (FAS) Heathrow Airport Consultative Committee 31 st March 2010 Phil Roberts Assistant Director of Airspace Policy 1 1.
On Device Portals Presented By:. Mobiletain & The On Device Portal Consortium The ODPC was formed by Mobiletain/B2 Group to: Further the advancements.
©2011 MasterCard. Proprietary and Confidential MasterCard® M/Chip™ Advance Integrated Data Storage Page 1 November 9, 2011 Integrated Data Storage gives.
Senior Stakeholder Forum 04/02/2014. Agenda UK-Link Programme Update –Including Data Cleansing Update Nexus Modification Update Faster Switching EU Reform.
Implementation of Non Effective Days Nexus Workgroup – March
Pro’s and Con’s of Codes UNC Code Administrator Working Group 28 August 2008.
Michael Barrett Founder Nok Nok Labs Camera Fingerprint Sensor Microphone Secure Execution Secure Storage Location Motion, Heartbeat, etc. M7 Face.
VLab Web Application Architecture Xinyi Dong 10/1/
7 th Floor Tricorn House | Hagley Road | Birmingham | UK | tel + 44 (121) | fax + 44 (121) Resource Sharing InterLibrary Loan Migration.
What is a GIS? F 1.2 Getting Started F 1.2 Some Definitions of GIS F 1.3A Brief History of GIS F 1.4 Sources of Information on GIS.
Introduction to Database using Microsoft Access 2013 Part 1 November 4, 2014.
Senior Stakeholder Forum Wednesday 19 th June 2013.
Data Center Infrastructure
Understanding Data Warehousing
Living in a Digital World GCSE ICT Unit 1. What are we going to study?
Industry Dialogue on xoserve Services Progress Report for Ofgem 5 th December 2006.
CMS Transition Overview 22 nd July Key Attributes CMS Consequential Change Project is scoping high level change requirements as a result of Project.
14895 East 14 th Street, Suite 300  San Leandro, CA phone /  fax  Systems Integration Secrets.
UK Link Programme Update to PNUNC June 17 th 2013.
3/5/2009Computer systems1 Agile Modeling and Prototyping Prototyping Agile Modeling a collection of innovative, user-centered approaches to systems development.
“Implementing Spectrum Trading” the recent consultation Presentation to SMAG Open Forum December 2002 Geoff Chapman Radiocommunications Agency.
Time for change rethinking the future.  The concept.  The architecture.
Flexiblelearning.net.au get into flexible learning Sharing E-Learning Resources in VET Vivienne Blanksby Program Leader Resources for Teaching, Learning.
Feature Synopsis Normalize appraisals to suite corporate policy requirements. Flexible configuration to normalize at a predefined level in employee hierarchy.
Références, date, lieu Xoserve Service Model – Shipper’s View Total Gas and Power Ltd Gaz de France ESS.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
C.A.G.I.S. Helpdesk System Sean Winfield March 6, 2006 Senior Design III.
ENIAC was the first digital computer. It is easy to see how far we have come in the evolution of computers.
Conception Scoping the project Investigating the work Determining the product Defining requirements How do we know when to move from one stage to the.
ERCOT – MISO DC Tie Study Comments
1 CEG 2400 Fall 2012 Network Servers. 2 Network Servers Critical Network servers – Contain redundant components Power supplies Fans Memory CPU Hard Drives.
High Level Features of UK-Link Replacement 22nd November 2006.
ProofRite Kevin Conroy Dave Levin François Guimbretière.
Industry Dialogue on xoserve Services 14 th September 2007.
DSC Change Committee UK Link Future Releases Proposed Approach
FGO: ASA Service Line Review
INTRODUCTION.
IDEA d.o.o. Accommodating rapid growth with an IBM System x and System Storage solution Business challenge: Because of rapid growth, Serbian food retailer.
Date of download: 10/30/2017 Copyright © ASME. All rights reserved.
UK Link Programme Update to PNUNC August 13th, 2013
UNC Digital Library Project
Points to be Considered while selecting an LMS
QuickBooks Enterprise Support- Get Instantly Solution from Technician
PHP Scripts Mall Online Payment Gateway Script - Payment Gateway Script - Payment Processor Script.
QuickBooks Enterprise Support- Find Solution for accounting software issues
CMSi New Features.
Modernizing web service standards: The next version of WFS
PCS Day 2016 CMS Vienna, 23rd November 2016.
Integrated Policy Sales and Medical Screening Solution 2016
Itcoinitcoin ASAS. 4 I4 I,
UK Link Programme and ‘Nexus’ UNC Modifications
R&N Timeline June-19 Sept-19 (EUC) Nov-19 Minor Release D4
Smart Metering Portfolio DCC Day 1 UK Link Committee DCC Day 1 Shipper File Format Representation Thursday 08th August 2013.
CEN 5035, Software Engineering
UNC Modification Proposal 0385 Inclusion of DNOs as Users in User Pays Arrangements Phil Lucas 7 June 2011.
Release 3 Scope Selection and Plans
Transporter Initiated SPA Confirmations on behalf of User Potential Impact Discussion with UK Link Committee.
Connected System Exit Points - Update
Applications Development - Unit Testing
Lessons Learnt UKLC - November 2015
User Pays Principles and Governance
Nexus Workstream 30 April 2009.
GRP Progress & Plans The GRP project was established to deliver an updated design utilising fully supported hardware and software for Gemini. GRP is replacing.
Gemini Code Contingency Review
XRN4658 – OTR UNCVR Amendment
UK Link Timeline June-19 Sept-19 (EUC) Nov-19
Enabling Large Scale Utilisation of Class 3
THE GROWTH ENVIRONMENT.
Presentation transcript:

High Level Features of UK-Link Replacement 8th November 2006

High Level Features Supports service lines currently defined in the ASA and associated UNC processes. Scope to improve interfaces with users in order to make use of new technologies. Design intended not to preclude the potential integration of SPA processes for iGTs. Assumed no major change in transaction rates. Flexible design to reduce the cost of likely future change. Sufficient storage capacity to meet future data growth for the next five years based on current growth rates. No significant regime changes before commencement of replacement.