Public Works Standard Drawings Subcommittee Meeting

Slides:



Advertisements
Similar presentations
Presentation by: LT Environmental, Inc.. Why Stormwater Matters Water is a precious resource that must be protected. Flood-defensive measures will protect.
Advertisements

Measurement for Civil Engineering works
11 Grant Park Sewer Rehabilitation Project BES Project #E10346 Bid # SCOPE: Rehabilitation, Replacement, or Relocation of Sanitary & Combined Sewers,
1 Effluent Guidelines for Construction Greg Davis USEPA
A State’s Perspective of the EPA’s Effluent Limitations Guidelines 40 CFR Part 450 Jeffrey B. Shaver, PE, CPESC AASHTO Subcommittee On Design July 27,
Module 4: Temporary Sediment Controls. Learning Objectives n Identify locations for sediment control BMPs n Identify applications for different types.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.
Design of Open Channels and Culverts CE453 Lecture 26
Design of Open Channels and Culverts
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
Erosion Control/Damage Topic H. Erosion & Sentiment Control Defined by: – Environmental Regulations – State and federal laws – Standard specifications,
Erosion Control on Construction Sites David Athey, PE Deputy Public Works Director, Engineering City of Atascadero.
Connecticut Department of Transportation: Office of Environmental Planning (OEP) Statewide Drainage Maintenance Activities State owned Rail Facilities.
Inspecting Construction of Bioretention Facilities Carlton Thompson and Jeff Cowling.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons.
Professional Engineering Services For Restoration Project John Mitnik, P.E. Engineering & Construction Bureau Chief Operations, Maintenance & Construction.
Dan Cloak, P.E. 18 September 2007 to achieve water quality benefits in Contra Costa County Implementing Low Impact Development.
Structures Protect Structural Integrity Wood/less durable check dams vs. stone/more durable check dams Green Girl LDS.
October 8, 2008 Spokane, WA Doug Walters, P.E. King County DOT
MDOT Storm Water Management Plan Module 2: Best Management Practices
Riverside County Flood Control and Water Conservation District Murrieta Creek Flood Control, Environmental Restoration and Recreation Project June 2006.
By: Rick Ayers Yates County Soil & Water Conservation District
GUTTERS and INLETS Gutter : A gutter is a triangle open channel along the curb stone of streets which carry the storm water along streets to inlets. Inlets.
The Pennsylvania Horticultural Society motivates people to improve the quality of life and create a sense of community through horticulture.
Low Impact Development [presenters name] [presentation date] Integrated Management Practices Controlling Stormwater Quality and Quantity using.
Nathan Davis Steven Reid Kristen Ulmer Graduate Assistant: Nathan Dye.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Water Harvesting. Water harvesting measures These are artificial recharge measures that capture rainfall and run-off and store it in the soil profile.
Water Street Hydrologic and Hydraulic (H&H) Analysis (Drainage Study) Water Street Hydrologic and Hydraulic (H&H) Analysis (Drainage Study) City of Platteville.
1 Common Issues on Site Re-certification Training For Level IA Fundamentals Certified Personnel Issued May 2009.
Basic Hydrology & Hydraulics: DES 601
Basic Hydraulics: Storm Water Management concepts
Lesson Understanding Soil Drainage Systems. Interest Approach Ask students the question, “What determines how fast water will flow through a funnel?”
Item 6b. Project Vicinity Park Ave Bridge Existing Park Avenue Bridge.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Linford School Drainage Improvements 21 March 2016 City of Laramie.
City of Clarksville Storm Water Management Manual Revisions 2014.
Construction of On-Site Stormwater Treatment and Flow Control Facilities Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting.
Highway and Road Projects: When to Treat Runoff William Fletcher Water Resources Program Coordinator Geo/Environmental Section ODOT.
Stormwater Management
Detailed planning for fish farm construction Once the site has been selected, then initiation of planning begins. There are two main related components.
2nd Street Drainage and Paving Improvements
City of Orinda 2017 Annual and Measure J &L Pavement Rehabilitation Projects City Projects No & 4115.
Town of Brighton, Department of Public Works
There are 2 Types of Bridge Inspectors – Class B and Class A.
Supervisor, RIDEM RIPDES Permitting Program
EFFECTIVE EROSION AND SEDIMENTATION CONTROLS FOR IN-CHANNEL PROJECTS
Hays County Commissioners Court
General Road Construction Information
The Alabama Transportation Rehabilitation and Improvement Program
Inspector Challenges.
A CASE STUDY OF COASTAL EROSION & MANAGEMENT
Construction Drawings
Replace This Text with Committee Name
EPA Public Meeting Dallas, Texas May 10, 2005
13-block rotation schedule
August 28, 2018.
Colchester Interceptor System Improvements Project
Water Harvesting.
Site Plan Requirements
Stormwater Pollution Prevention Plans
Hydraulics Updates to the IndianaDesign Manual
Kaituna River Re-diversion and Te Awa o Ngatoroirangi / Maketū Estuary Enhancement Project 7 November 2018 Community Meeting Murray Brock video.
PWCS Fifth Edition DIVISION 1000 Edits
Public Works Standard Drawings Subcommittee Meeting
Replace This Text with Committee Name
Stream Crossing Replacement Policy
City of Austin Watershed Protection Department CIP Project design/implementation Thank you for the opportunity to show the committee what the Watershed.
Unified Development Code
Presentation transcript:

Public Works Standard Drawings Subcommittee Meeting Monday September 24, 2018 Swing Space – Large Conference Room

Standard Specification Reference AS PROVIDED IN PLANS BY OWNER OR OWNER’S REPRESENTATIVE Standard Specification Reference Date Standard Drawing No. New Drawing AND SPACING

Standard Specification Reference Date Standard Drawing No. New Drawing

Replace 1090A with iSWM 3.30 and 3.31

202.12 * 1090A 202.12 * 1090B Standard Specification Reference Date Standard Drawing No. 1090A Standard Specification Reference 202.12 * Date Standard Drawing No. 1090B

Replace 1100 with iSWM Figure 3.20

Standard Specification Reference Date Standard Drawing No. 1100

Additional Edits Drawing Titles

Exit Exit - Area - Area

BLOCK AND GRAVEL BLOCK AND GRAVEL

INLET PROTECTION-AREA INLET PROTECTION-AREA EXCAVATED IMPOUNDMENT

The following slides outline the edits made at the last meeting on August 6, 2018

For channel material, see Note 6 Update Drawing Date Longitudinal slope Swale max. swale For channel material, see Note 6 Update Drawing Date

Provide edits/additions below: 9. For temporary stabilization rip-rap; width, depth, and surface water elevation should be designed by owner or owner’s representative. 10. Refer to Drawing 1230A and B for turf reinforcement mat. 11. See integrated Stormwater Management Manual for more information on interceptor swale. Replace “grades” with “longitudinal slopes” swale STABILIZED RIP-RAP PLANS SEE NOTES 9 AND 10. 95% Update Drawing Date

Plan view should include an “outlet flow” arrow. See note 5 Update Drawing Date

Standard Specification Reference Arrows are upside down STANDARD DRAWINGS 1030A AND 1030B. Standard Specification Reference 202.7* Date Standard Drawing No. 1040B

Provide edits/additions below: 7. See integrated Stormwater Management Manual for more information on Diversion Dikes. 8. For temporary stabilization rip-rap; width, depth, and surface water elevation should be designed by owner or owner’s representative. 9. Refer to Drawing 1230A and B for turf reinforcement mat. “Refer to Item 202.7 in the Standard Specifications.” Replace “grades” with “longitudinal slopes” swale STABILIZED RIP-RAP SEE NOTES 8 AND 9. PLANS Update Drawing Date 1040C

Replace 1050A with iSWM 3.32

Standard Specification Reference 6” x 6” OR 4” x 4” WELDED WIRE MESH STRUCTURE deep Standard Specification Reference 202.8 * Date Standard Drawing No. 1050A

Provide edits/additions below: 6” x 6” or 4” x 4” WELDED WIRE MESH Update Drawing Date

Replace 1080A with iSWM 2.2 REMOVE FROM PWCS

WILL NOT INCLUDE IN PWCS Standard Specification Reference 202.10 * Date Standard Drawing No. 1080A

REMOVE FROM PWCS Provide edits/additions below: 8. See iSWM Manual for more information on Sand Bag Check Dam REMOVE FROM PWCS 202.10

New Subcommittee Volunteer Mathew L. Busby, PE, Lockwood, Andrews, & Newman, Inc. - Background in general civil engineering, 2008 SMU graduate - Served as a full-time construction manager and inspector for a year - Substantial experience in subsurface utility engineering (SUE), utility coordination, and utility relocations. - Focus is municipal work now, including street rehabilitations and replacements, culvert rehabilitations and replacements, bridge rehabilitations, erosion control, drainage design, roadway design, and water and wastewater facilities, rehabilitations, and replacements.

Determine action items for subcommittee members and NCTCOG staff Next Steps Determine action items for subcommittee members and NCTCOG staff

Next Meeting Next Meeting scheduled for Monday October 22, 2018 at 10 a.m., Six Flags Conference Room Future Meeting Dates November 12, 2018 November 19, 2018 November 26, 2018 December 3, 2018 December 17, 2018 Thanksgiving PWC