Neutron guide Shielding Concept

Slides:



Advertisements
Similar presentations
BARTOSZEK ENGINEERING 1 The Design of the Booster Collimators Larry Bartoszek BARTOSZEK ENGINEERING 3/10/03.
Advertisements

Finding Surface Area Step 1: Flatten the 3-D figure A rectangular prism will flatten to 6 rectangles. Depending on the dimensions of the 3-D figure, you.
Framing Agriculture Structures
N. Dos Santos1 TX54 Mobile Shielding Door 106th CEMESTE – N. Dos Santos/ TS-LEA Floor steel plates and anchors system Chassis assembly Chassis.
Rosier Ph. – IPNO – Detector Dpt. – 27/05/2011APRIME HPS collaboration meeting 1/24 1- Vacuum chamber proposal 1.1- Stainless steel chamber design and.
Skilled Trades 1201 Floor Framing
WA105 General Meeting at CERN 21 & 22-January-2014 Enrique Calvo Alamillo.
The main function of the divertor is minimizing the helium and impurity content in the plasma as well as exhausting part of the plasma thermal power. The.
Rectangular framed structures
Chapter 19 Floors.
Common Commercial Construction Materials
Preliminary studies for Muon shield modification to accommodate LCLS II Alev Ibrahimov December, 2010 BSY.
December 2008 Geneva Proposed amendments to the UNECE Regulation No. 29 on truck cab safety Russian Federation Transmitted by the expert from the Russian.
PSB dump endoscopy 30 th May 2013 Alba Sarrió on behalf of EN-STI-TCD Thanks to Pascal Mesenge (EN-MME)
COMMERCIAL SERIES TRI-POINT ANCHORING SYSTEM
Floor Framing Unit 29.
Wall and Ceiling Construction
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
PAVSYS PAVSYS ™ PAVSYS PAVSYS MODULAR ENGINEERED SUSTAINABLE HABITATS.
1 Discussion for basic options — engineering video conference July 12, 2006 Outline Water pool — advantages — issues, problems, engineering options Aquarium.
Wood Construction CTC-375.
SOME COMMON RELATIONS USED IN BUILDING ESTIMATES
Unit A3-9 Framing Agriculture Structures Problem Area 3 Construction Systems.
DHCAL m3 module Ciemat status Enrique Calvo Alamillo EVO meeting 1 July 2010.
ZDC Remote Handling Tool Structure and Force Analysis P. Debbins University of Iowa December 10, 2009.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l History l Requirements l Environment l Design l Structural Integrity l Preparation l.
Some naïf ideas on cryostats , BNL-LBNF meeting D.Mladenov, M.Nessi.
Chapter 43 Common Commercial Construction Materials.
Fundamentals of Structural Detailing
READING QUIZ A wedge is a __________. A) truss B) frame C) machine D) beam.
Beamline Readiness Review - Hutch Beamline Microdiffraction March 28, 2006.
13/04/2012www.ruukki.com | Profiled Products Group | PUBLIC1.
Chapter 23: Structural Drafting
TAS at IP5 Present situation and plans François BUTIN TS/LEA.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
We have to fix the design of the flanges on the 1 st horn frame to which the target support beams are attached.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l Requirements l Environment l Design l Structural Integrity l Preparation l Installation.
The HCAL barrel absorber structure
The four basic types of structures are :
Flange Plates to be Welded to Beam Flanges.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
EAR2 Beam Line Report on the Status C. Weiss EAR2 Beam Line - Report on the Status1.
Intelligent! Impressive! Incredible!
LHCb Radiation Shielding Wall – Lifting Tool Overview.
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
Baby Mind C OIL DESIGN AND ASSEMBLY SCENARIOS Helder Silva Phillipe Benoit Alexey Dudarev Gabriela Rolando Herman ten Kate Etam Messomo Laurent Nicola.
Target Systems and Monolith Design Update Rikard Linander Group Leader Monolith and Handling April 2, 2014.
First Wall Panel - Overview
Framing Agriculture Structures
SX1 manipulation VERSION 1 Version
CreaZen® Decorative Railing System
Escalator Installation
PANDA Yoke of the Magnet
NOVA DESK RANGE.
Introduction Used for covering spaces in the form of roof or floor
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
TAS at IP1 Present situation and plans
Framing Agriculture Structures
Design of Distribution Feedbox at LHC P7
Section and Details Vocabulary and Basic Information
Additional Upstream Coil Shielding
Beam dump for J-Parc neutrino facility
Roof design Bunker Project CDR
Rad safety and activation
Senad Kudumovic Design engineer
The Mechanical Engineering & Technology (MET)
ROOFS.
April 19th 2017 Work Unit AIK CDR of the CDS-SL Installation integration.
Bunker Wall Design Wall
Bunker Wall Design Wall ESS
Presentation transcript:

Neutron guide Shielding Concept Senad Kudumovic 14.08.2018

D03/D01 and E02 Height difference between D03 and E02 - 1000 mm Side view Top view Height difference between D03 and E02 - 1000 mm

D03/D01 Concept 1 Step 1: “U” steel frame anchored to the floor Optional: Instead of ”U” shape, split into 2 pillars and beam. HEA 140 Material available: CARBON STEEL - S235JR / S355JO / S355J2 - EN 10025 Stainless Steel- 304, 304L, 316

D03/D01 Concept 1 Step 2: Steel plates bolted to the side of the frame Plates to be thermal cutted and welded together without additional machining Bolt free surface from the ouside which will allow close contact between steel and concrete Total thickness: 2x50 mm = 100 mm

D03/D01 Concept 1 Step 3: Concrete slabs bolted to the side of the frame 2nd layer connected to the first layer 1st layer connected to the frame,

D03/D01 Concept 1 Step 3: Roof blocks resting on the side walls

D03/D01 Concept 1 Maintenance of inside components Full access by removing three pieces 3 lifts ≈1800 mm opening length

D03/D01 Concept 1 Front view Streaming 10 mm gap Top view

D03/D01 Concept Logistic HEA 140 Size: ≈ 2900 x 1200 mm Weight: ≈130 kg Size: ≈ 3000 x 1500 x 300 mm Weight: ≈3 t Size: ≈ 3000 x 1600 x 100 mm Weight: ≈3.5 t

D03/D01 Concept 2 Side walls installation Blocks installed in line Steel plates bolted to concrete block

D03/D01 Concept 2 Roof blocks installation Roof blocks resting on the side walls

D03/D01 Concept 2 Maintenance of components inside Full access by removing three pieces 3 lifts ≈1800 mm opening length

D03/D01 Concept 2 Streaming Front view 10 mm gap Top view

D03/D01 Concept 2 Logistic Size: ≈ 1800 x 1600 x 400 mm Weight: ≈3.5 t

D03/D01 (E02) Concept 3 Similar as Concept 2 but with supporting blocks Blocks installed in line Applicable to E02 (without supporting blocks) Steel plates bolted to concrete block

D03/D01 (E02) Concept 3 Logistic Size: ≈ 1800 x 1600 x 400 mm Weight: ≈3.5 t Size: ≈ 1700 x 1250 x 700 mm Weight: ≈4.1 t Size: ≈ 2600 x 1800 x 300 mm Weight: ≈3.5 t

C3C Blocks/E02 Streaming???

C3C Blocks/E02

CSPEC example D03-Concept1 and E02 Concept 3 E02 – aproximate length 100 m Total mass of steel ≈ 390 t Total mass of concrete - Walls ≈ 580 t - Roof ≈ 345 t D03 – aproximate length 30 m Total mass of steel ≈ 200 t Total mass of concrete - Walls ≈ 280 t - Roof ≈ 130 t

Dimensions

Q/A Questions ???