Use of Emergency Engines for Emergency DR Is Good Policy June 24, 2013

Slides:



Advertisements
Similar presentations
Electric Generation on High Electric Demand Days New Jersey Clean Air Council Annual Public Hearing April 1, 2009 Tonalee Carlson Key New Jersey Dept.
Advertisements

Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
Gloria Godson VP, Federal Regulatory Policy Reliability Pricing Model Part 2.
Modeling the New 1-Hour Nitrogen Dioxide (NO 2 ) and Sulfur Dioxide (SO 2 ) NAAQS Alan Dresser Research Scientist I October 14, 2011.
Examples of 1-Hour NO 2 and SO 2 Modeling William O’Sullivan Director, Division of Air Quality NJDEP June 14, 2011.
COMAR Distributed Generation Conceptual Amendments June 2013.
Demand Response in New York State Northwest Power and Conservation Council DR workshop February 24, 2006.
Update: National Ambient Air Quality Standards Association of California Airports September 15, 2010 Phil DeVita.
NRG’s Huntley Plant and a Just Transition Risks Facing Coal-Fired Generators in 2014 and Coming Years David Schlissel Director of Resource Planning Analysis.
Enhancing Interruptible Rates Through MISO Demand Response: WIEG Annual Meeting June 19, 2008 Presented by: Kavita Maini, Principal KM Energy Consulting,
Susan Covino Senior Consultant, Emerging Markets March 31, 2015
NAMEPA 2014 Annual Conference New York City Canada and North American Emission Control Area RDIMS #
Clean Air Act Section 111(d) Indiana Energy Association September 11, 2014 Thomas W. Easterly, P.E., BCEE Commissioner IN Department of Environmental Management.
Greenhouse Gas Emissions Reductions from Wind Energy : Location, Location, Location? Duncan Callaway SNRE & Department of Mechanical Engineering
Texas Lignite Industry. Texas Lignite  Because >95% of lignite mining operations in Texas are in support of electric generation…..whatever impacts the.
Use of Emergency Engines for Emergency DR Is Good Policy June 24, 2013.
Proposed Revisions to Colorado Air Quality Control Commission Regulation No. 7 Garry Kaufman Air Pollution Control Division Air Pollution Control Division.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
Electric Generation Reliability Remarks Before the Pennsylvania Public Utility Commission 2011 Summer Reliability Assessment Meeting June.
A Glimpse Into Summer: Evaporating Demand Proprietary and Confidential 1 Melissa Westaway Meteorologist/Demand Forecaster.
Standby Generators & Demand Response What is Demand Response Why Demand Response Works PJM‘s DR Programs Financial Benefits Participation Requirements.
Jenell Katheiser Doug Murray Long Term Study Scenarios and Generation Expansion Update January 22, 2013.
Did the recession impact recent decreases in observed sulfate concentrations? Shao-Hang Chu, US EPA/OAQPS/AQAD October, 2011.
Summer 2004 and Beyond Lon W. House, Ph.D ACWA/Edison Joint Presentation June 24, 2004.
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
EPA Cooling System Regulations Hall of States Briefing February 22, 2011.
GHG BACT Analysis Case Study Russell City Energy Center May 2010 Donald Neal Vice President, EHS.
Stationary and Area Source Committee Update OTC Committee Meeting September 13, 2012 Washington, D.C. Hall of the States 1.
EPA’s Proposed Clean Power Plan House Committee on Natural Resources and Environment February 12, 2015 Tegan B. Treadaway Assistant Secretary Office of.
The Regulatory Assistance Project 177 Water St. Gardiner, Maine USA Tel: Fax: State Street, Suite 3 Montpelier, Vermont.
Methyl Bromide Update: Reregistration and Montreal Protocol April 23, 2009 Reddick Fumigants.
Chicago Advanced Energy Demand Response & CSP Evolution Kellen Bollettino Comverge Inc. 10/23/14.
PJM© Demand Response in PJM 2009 NASUCA Mid-Year Meeting June 30, 2009 Boston, MA Panel: Price Responsive Demand – A Long-Term Bargain.
Coupled Energy Market Trading and Air Quality models for improved simulation of peak AQ episodes Caroline M. Farkas, Annmarie G. Carlton, Frank A. Felder,
Emergency Demand Response Concept Overview and Examples Presented to: ERCOT December 3, 2004 Presented by: Neenan Associates.
Preparation of Control Strategies EGU Sector Clean Air Markets Division U.S. EPA Office of Air and Radiation 17 October 2007.
FERC Staff’s Report on Demand Response and Advanced Metering.
Operations Report Kent Saathoff System Operations ERCOT.
Programs/Products that ERCOT Does Not Presently Offer ERCOT Demand Side Working Group New DR Product Options Subgroup Jay Zarnikau Frontier Associates.
New Ozone NAAQS Impacts: What Happens Next with a Lower O3 Standard? Nonattainment Designation and Industry’s Opportunity to Participate New Ozone NAAQS.
California Independent System Operator 1 Department of Market Analysis California Independent System Operator California ISO Creation Time: July,
1 Long Range Transport of Air Pollution Air pollution can travel hundreds of miles and cause multiple health and environmental problems on regional or.
© 2016 Portland General Electric. All rights reserved. I NTEGRATED R ESOURCE P LAN 2016 OPUC Meeting April 21, 2016.
2018 LTSA Workshop August 2017 RPG Meeting Welcome to.
Integrated Resource Plan 2016
Transmission Planning in ERCOT- Overview
Natural Gas –generation intersection
Wind Management at MISO
EPA’s Response to the 2000/2001 Energy Crisis
First in Service First in Value
New Source Review (NSR) Program Basics
Allegheny Power Residential Demand Response Program
Kenneth Craig, Garnet Erdakos, Lynn Baringer, and Stephen Reid
Leveraging Energy Infrastructure to Drive Revenue
Zonal Electricity Supply Curve Estimation with Fuzzy Fuel Switching Thresholds North American power grid is “the largest and most complex machine in the.
Michael I. Henderson ISO New England Inc.
Key Findings and Resource Strategy
Maryland's Air Quality: Nitrogen Reductions and the Healthy Air Act
Cold Snap Task Force Update
Background High Electric Demand Day (HEDD) Initiative
Demand resource emergency energy measurement and verification
Examples of 1-Hour NO2 and SO2 Modeling William O’Sullivan Director, Division of Air Quality NJDEP April 28, 2011.
Boiler Sheltered Initiative
Exceptional Events Rulemaking Proposal
Enforcing the NAAQS Case Study Sean Taylor
Mike Mumper & Brian Kick Good afternoon
Northeast Regional Greenhouse Gas Initiative
COMAR Distributed Generation Conceptual Amendments
Restructuring Roundtable June 29, 2001 David Schlissel
DOGM Collaborative Meeting
Presentation transcript:

Use of Emergency Engines for Emergency DR Is Good Policy June 24, 2013

Outline Emergency demand response (DR) versus non-emergency EPA found no correlation between emergency DR and high ozone NESCAUM analysis not representative Compliance costs for strict limits are prohibitive Strict limits will cost MD consumers much more

Use of engines in demand response Emergency Demand Response (DR) Used as measure of last resort Only PJM can call event and must follow NERC EEA Level 2 Procedures Program called by PJM just prior to voltage reductions when no other options are available PJM – Emergency Load Response Program (ELRP) Non-Emergency DR or Peak Shaving Dispatched for non-emergency (e.g., economic) reasons and site can decide when to operate

Ozone exceedances do not correlate with emergency DR Analysis of Emergency DR events and measured ozone concentrations 2005 – 2011 PJM, ISO NE, NYISO, and ERCOT No correlation between emergency DR and high ozone concentrations Although some emergency DR events are called during high ozone days, many DR events occur on non-exceedance ozone days and many more have high ozone alerts but no DR events Data does not show that use of emergency engines during DR events causes high ozone In many instances the ozone concentrations are high or higher on the days preceding an event

Emergency DR events do not correlate with high ozone days See Analysis of Emergency DR and Ozone Concentrations; February, 2012 Date Geographic Extent Duration (Hours) High O3 Day? Notes May 26, 2011 Norfolk portion of Dominion 2 Yes in MD, No in DE Only 1 out of 17 monitors in MD showed a slight exceedance (76 ppb) May 31, 2011 Mid Atlantic and Dominion July 22, 2011 Mid Atlantic (subset) 6 (BGE, PECO, DPL, DLCO); 5 (JCPL, METED) Yes Highest observed O3 for July was on July 2 which was not a DR event September 24, 2010 6 Three MD monitors only exceeded std by 2 ppb September 23, 2010 5.5-6 depending on zone One MD monitor only exceeded std by 1 ppb August 11, 2010 DC portion of Pepco Ozone concentrations higher previous day July 7, 2010 4-5.5 depending on zone July 5-6 recorded higher concentrations June 11, 2010 Pepco Only 4.2 No May 26, 2010 Pepco Only (DC Only) 2.7 August 8, 2007 Mid Atlantic 4-5 depending on zone August 6 and 7 had exceedances August 2, 2006 4 No in MD, Yes in DE August 3, 2006 5 July 27, 2005 July 25-26 recorded higher concentrations August 4, 2005 3

Monitored ozone concentrations in MD Need to examine days prior to ELRP events July 7, 2010; ERLP Event in Mid Atlantic (subset); 4 to 5.5 hours depending on zone August 11, 2010; ELRP Event in DC Portion of Pepco; 6 hours July 27, 2005; ELRP Event in Mid Atlantic and Dominion; 4 Hours

EPA found no correlation between emergency DR and high O3 EPA Response to Comments; January 14, 2013 NESHAP Docket Memo “This robust and comprehensive study concluded that there is no correlation between emergency DR and high ozone concentration.” “While EPA acknowledges that emergency DR may be called during HEDD in the summer when days are especially warm and ozone is problematic, the use of emergency DR at such times cannot be directly correlated as causing or contributing to the ozone exceedances.” “The EPA does not agree that emissions of diesel exhaust are likely to go up significantly compared to the estimates used in the original rule, given the very limited usage of such engines in emergency DR. It is worth noting that the circumstances during which these engines will be permitted to run under the rule are in circumstances that would prevent blackouts, which, if not prevented, would mean the use of all emergency engines in the affected area, which would create substantially greater emissions from diesel engines than if these limited emergency DR engines are used for a short period of time.” “Further, in the event of blackouts, people’s health and safety are jeopardized. During a blackout, there are human health effects that can result from extreme weather temperatures, hot or cold, that become uncontrollable during the loss of electricity. …. in a study published by NIH, it was found that during the blackout of 2003 New York City put people in greater health peril.”

Use of generators on High Electric Demand Days (HEDD) As noted by EPA in the Federal Register Notice (January 30, 2013) “While the EPA is sensitive to these concerns, the availability of these engines for a more tailored response to emergencies may be preferable in terms of air quality impacts than relying on other generation, including coal-fired spinning reserve generation.” “While EPA acknowledges that emergency DR may be called during HEDD in the summer when days are especially warm and ozone is problematic, the use of emergency DR at such times cannot be directly correlated as causing or contributing to the ozone exceedances. Also, the fact is that many DR events occur on days when ozone standards were not exceeded and in many cases ozone levels are high or higher on days before a DR event, according to available data.”

NESCAUM analysis is not representative From EPA’s Response to Comments “The EPA finds that analysis to be limited based on a very brief analysis period (2 days) and may not be representative and justified in supporting a conclusion that emergency generators clearly contribute to HEDD events and the EPA does not know what those estimates are based on from that study. “ “The EPA does not believe NESCAUM can conclude without a doubt that emergency DR correlates with high ozone days. Again, the analysis was only over 2 days.” “Also, in the alternative, the EPA does not know what those backup engines would have been replaced with. The results of the analysis conducted for the report are only applicable for areas with capacity market and may be dependent upon fuel price assumptions. Further, other studies spanning for a longer time looking at many events over many years in different areas of the United States shows a different result .”

Compliance costs for strict limits are prohibitive Caterpillar Quote to upgrade non-tier rated 2 MW diesel engine to Tier 4 emission limits: Parts (including SCR and DPF): $261,772 Labor: $101,000 Total: $362,772 plus additional annual operating costs Best Available Control Technology (BACT) is typically $10,000/ton or less DR Operation Hours NOx Removed ($/ton) 100 $221,200 60 $368,700 8.8 (Avg of 2005-2011) $2,513,664

Engines will be withdrawn which will cost consumers 99%+ generators participating in emergency DR in MD will drop out of the ELRP if MDE imposes stricter limits Companies participate in DR because they do not need to do anything to their engines Not a single engine in non-emergency DR programs in EnerNOC’s portfolio is planning to upgrade for non-emergency NESHAP compliance and the costs are much lower ($60K per engine) Very few engines participate in ELRP in NJ and DE due to high costs of controls Without generators participating in MD in ELRP, electricity costs will increase by over $200M per year

Don DiCristofaro ; Air Quality Meteorologist Consultant ddicristofaro@enernoc.com; 617-834-8408