National Aluminium Company Limited Integrated operations : Bauxite – Alumina – Aluminium – Power Investor Presentation.

Slides:



Advertisements
Similar presentations
EcoTherm Plus WGB-K 20 E 4,5 – 20 kW.
Advertisements

Números.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Earning Release 3Q, 2001 Samsung Electronics October 22, 2001.
Analysis of Financial Statements
Fill in missing numbers or operations
/ /17 32/ / /
Reflection nurulquran.com.
EuroCondens SGB E.
Worksheets.
Cost Behavior, Operating Leverage, and Profitability Analysis
Copyright © 2013 Elsevier Inc. All rights reserved.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
Presented by The Coal Rush Revisited: R. W. Beck, Inc. IPED COAL POWER CONFERENCE January 18-19, 2007 St. Petersburg, FL Nicholas P. Guarriello An Economic.
Electricity and Natural Gas Supply, Reserves, and Resource Adequacy CMTA Energy Conference Energy: Growing Californias Economy William J. Keese California.
Addition and Subtraction Equations
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
Create an Application Title 1Y - Youth Chapter 5.
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
1  1 =.
Summative Math Test Algebra (28%) Geometry (29%)
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
June Energy consumption in Korea 4 primary & final energy consumption CO 2 emissions LNG Nuclear Renewables, etc Oil Coal Energy Industrial.
Break Time Remaining 10:00.
This module: Telling the time
The basics for simulations
Nitco Limited Investor Update January 28, 2009 October - December 2008.
Introduction to Cost Behavior and Cost-Volume Relationships
PP Test Review Sections 6-1 to 6-6
The Pecan Market How long will prices stay this high?? Brody Blain Vice – President.
INDIA: END OF THE SUGAR CYCLE? PRESENTED BY: ABINASH VERMA, DG, ISMA
Look at This PowerPoint for help on you times tables
Copyright © 2009 Pearson Prentice Hall. All rights reserved. Chapter 8 Capital Budgeting Cash Flows.
Cost-Volume-Profit Relationships
Capacity and Constraint Management
Measuring the Economy’s Performance
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
15. Oktober Oktober Oktober 2012.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
© Vattenfall AB The Swedish Power Market Presented for Invest in Sweden Agency and Sun Microsystems Stockholm 20 March, 2009 Sandra Grauers Nilsson, Vattenfall.
Charging at 120 and 240 Volts 120-Volt Portable Vehicle Charge Cord 240-Volt Home Charge Unit.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
Least Common Multiples and Greatest Common Factors
Evaluating a Firm’s Financial Performance
Before Between After.
: 3 00.
5 minutes.
EnvironmentEnvironnementCanada Nusa Dua, Bali, Indonesia September 5 – 7, Part 4: LFG Utilization.
2Q14 and 1H14 Results. 2 Disclaimer This presentation contains statements that can represent expectations about future events or results. These statements.
Speak Up for Safety Dr. Susan Strauss Harassment & Bullying Consultant November 9, 2012.
Static Equilibrium; Elasticity and Fracture
Resistência dos Materiais, 5ª ed.
Clock will move after 1 minute
Lial/Hungerford/Holcomb/Mullins: Mathematics with Applications 11e Finite Mathematics with Applications 11e Copyright ©2015 Pearson Education, Inc. All.
National Aluminium Company Limited Integrated operations : Bauxite – Alumina – Aluminium – Power Investor Presentation.
Analyzing Financial Statements
Select a time to count down from the clock above
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Asst. Prof. Dr. Mahmut Ali GÖKÇE, Izmir University of Economics Spring, 2007 (c) 2001 Contemporary Engineering Economics 1 Financial.
National Aluminium Company Limited Integrated operations : Bauxite – Alumina – Aluminium – Power Share Holders & Financial Advisors May 2010.
National Aluminium Company Limited Integrated operations : Bauxite – Alumina – Aluminium – Power & Port Facilities Share Holders & Financial Advisors March.
Presentation transcript:

National Aluminium Company Limited Integrated operations : Bauxite – Alumina – Aluminium – Power Investor Presentation

SPECTRUM OF OPERATIONS 8 TH LARGEST BAUXITE DEPOSIT IN THE WORLD. LOW ENERGY CONSUMPTION. 6.3 MTPA CAPACITY. MECHANIZED MINES WITH HIGH PRODUCTIVITY. TRANSPORT THROUGH CONVEYOR BELT (14.6 KM). 100% CAPACITY UTILIZATION. 2.1 MTPA CAPACITY SPL. HYDRATES, SPL. ALUMINA AND ZEOLITE ADDED. CO-GENERATION POWER OF 74 MW FROM PROCESS STEAM. 100% CAPACITY UTILIZATION. DE-BOTTLENECKING TO INCREASE CAPACITY TO MTPA BY Bauxite Mine Panchpatimali Alumina Refinery Damanjodi

SPECTRUM OF OPERATIONS CAPACITY 0.46 MTPA TECHNOLOGY FROM RTA. AMONG LOW COST PRODUCER. INTEGRATED ANODE MAKING, ALUMINIUM CASTING AND ROLLING. INGOTS, BILLETS, WIRE RODS, SOWS & STRIP COILS. 45,000 MT CAPACITY ROLLED PRODUCTS UNIT. CAPACITY: 1200 MW - HIGH PLANT LOAD FACTOR. ADVANCED ELECTROSTATIC PRECIPITATOR (99.9% EFFICIENCY) TO CONTROL POLLUTION. ZERO DISCHARGE OF EFFLUENTS. CAPACITY TO HANDLE SHIPS UPTO 35,000 DWT. MECHANIZED MOBILE SHIP LOADER. MECHANIZED STORAGE FACILITIY. EXPORT OF ALUMINA AND IMPORT OF CAUSTIC SODA. Aluminium Smelter Angul Thermal Power Plant Angul Port facility Vizag

SPECTRUM OF OPERATIONS Wind Power Plant Andhra Pradesh and Rajasthan Capacity: MW commissioned at Andhra Pradesh Capacity:47.60 MW at Rajasthan

PRODUCTION Q - 1 FY Q - 2 FY Q - 3 FY Total up to Q Total up to Q FY Bauxite (MT) 14,62,99715,21,71215,20,44545,05,15435,52,166 54,19,391 Alumina Hydrate (MT) 481,500478,500465,50014,25,50012,70,300 18,02,000 Aluminium (MT) 84,52774,58078,806237,913305, ,384 Electricity-CPP (MU) 1,3271,1841,2493,7604,582 6,076 Wind Power (MU)

SALES Q Q Q Up to Q Up to Q FY Alumina – Export (MT) 274,890365,089304,420944,399638, ,117 Alumina – Domestic (MT) 7,9638,5388,61125,11229,414 40,605 Aluminium - Export (MT) 32,92320,36524,42977,717105, ,161 Aluminium - Domestic (MT) 52,42254,48054,367161,269198, ,941

Summary Financials Particulars Quarter EndedNine Months EndedYear Jun13Sep13Dec13 Dec Net Sales 1,537 1,7101,6214, ,809 Other Op. Income Other Non Op. Income Total Income 1,740 1,8611,7655, ,427 Less : Operating Cost 1,408 1,4701,4404, ,010 Gross Margin , ,417 Interest Depreciation Profit Before Tax Income Tax Profit After Tax

AVERAGE REALISATIONS Particulars Q Q Q Up to Q Up to Q FY Alumina Export (US$) Metal Export (US$)2,1022,0332,0772,0542,1592,191

Break up of Total Expenses ParticularsJun13Sep13Dec13Up to Q Up to Q FY Raw Materials ,168 Power & Fuel ,432 Staff Expenses ,154 Other Expenses ,320 Stock Adjustments (55)3910(06)(73)(64) Depreciation Interest Total ,522

COST BREAK UP UP TO Q Total Cost (Rs.4701 crore)

COST BREAK UP FINANCIAL YEAR – Total Cost (Rs.6522 crore)

MOVEMENT OF LME AND EXCHANGE RATE

PROFIT AFTER TAX Rs. in Crore

FINANCIALS ( PREVIOUS FIVE YEARS) Gross Sales PAT EPS Figures in Rs. Crore 1 Crore=10 Million LME

COMPARATIVE FINANCIAL PERFORMANCE HIGHLIGHTS (Nine Months ended vs ) Net sales down by Rs.106 crore (02%). Other non operating income up by Rs.30 crore (8%). Total income less by Rs.76 crore (01%). Operating cost down by Rs 246 crore (5%). Depreciation up by Rs.15 crore (04%). Profit after tax up by Rs.123 crore (35%).

COMPARATIVE FINANCIAL PERFORMANCE HIGHLIGHTS (Q3 FY-14 vis-à-vis Q2 FY-14) Net sales is down by Rs.89 crore(05%) Other income down by Rs.7 crore(05%). Total income down by Rs.96crore (05%). Operating cost down by Rs.30 crore(02%). Profit after tax down by Rs.48 crore(27%).

MAJOR FACTORS INFLUENCING RESULTS REVENUE : Increase in average realization due to exchange rate Effective sales price is lower due to lower LME Increase in Alumina Volume Lower Metal sale COST : Manpower cost due to normal increments and DA. Higher other expenses. Increasing Specific Consumptions

FINANCIAL RATIOS RATIOS(ANNUALISED)Nine Months EndedYear Gross Margin/Gross Block% Gross Profit to Capital Employed% Net Profit/ Net Worth% Net Profit/Net Sales% Return on Capital Employed% Earning Per ShareRs Book Value per ShareRs

GROWTH INITIATIVES

BROWNFIELD EXPANSION GREENFIELD GROWTH DIVERSIFICATION UP & DOWNSTREAM INTEGRATION OPTIONS FOR GROWTH

BROWNFIELD EXPANSION

EXPANSION OF REFINERY 5 TH Stream of 1 Million MT(Total Capacity – 3.3 Million MTPA) Investment – Rs. 4,500 Crore Bauxite need of Refinery Available DPR is under scrutiny

BAUXITE RESERVES MINE2013 LEVEL PANCHPATMALI162 POTTANGI70 Total232 FIGURES IN MILLION TONNES REQUIREMENT TILL YEAR MILLION TONNES MINESTATUS LIFE UPTO PANCHPATMALIOPERATING2036 WITH POTTANGIOPERATION FROM

GREENFIELD EXPANSION OPTIONS IN ALUMINIUM SECTOR

OPTIONSPLANTSINVESTMENT (IN `. CRORE) AREFINERY - GujaratRefinery Capacity – 1MTPA6,300 BSMELTER - Odisha POWER – 1260 MW SMELTER – 0.5 MTPA 16,000 CMINES & REFINERY- Andhra Pradesh MINE – 5.0MTPA REFINERY – 1.4 MTPA6,000 INVESTMENT- INDIA

OTHER PROJECTS BEING EXPLORED Caustic soda plant (2 – 3 lakh MTPA) DPR is under preparation Titanium project MOU signed with Indian Rare Earth Ltd to set up complex at Odisha Aluminium Conductor Plant MOU signed with PGCIL to set up a JV Draft Techno Economic Feasibility Report submitted by Consultant. Site selection study carried out by consultant

DIVERSIFICATION Nuclear Power Plant RENEWABLE POWER PROJECTS

1400 MW NUCLEAR POWER PLANT -JV WITH NPCIL ESTIMATED INVESTEMENT: ` 12,000 CRORE MOU SIGNED WITH NPCIL PROJECT IDENTIFIED (KAKRAPAR 3&4 UNIT) JV COMPANY FORMED COMMENCEMENT OF BUSINESS CERTIFICATE RECEIVED. NUCLEAR POWER PLANT-JV WITH NPCIL

Wind Power : 98 MW (2 Plants) 1 ST MW plant commissioned at AP. Investment Rs.274 Crore. Suzlon Energy Ltd managing O&M. 2 nd plant with capacity MW commissioned at Rajasthan Gamesa wind turbines Ltd executing the project. Investment Rs.332 crore Wind Power Plant At Damanjodi :14MW Proposal for 3 rd Wind power Plant at Mined out area of Bauxite Mines at Damanjodi. Investment of Rs.84 Crore. RFS Document under preparation by consultant. RENEWABLE POWER PROJECTS