CNRS contribution to ESS – 01/02/17

Slides:



Advertisements
Similar presentations
G. Olry for the IPN Orsay team 5 th SPL collaboration meeting, 25-26/11/2010, CERN.
Advertisements

G. Olry, H-M Gassot, S. Rousselot (IPN Orsay) EuCARD-SRF annual review 2011, 4-5 May, IPN, Orsay Unité mixte de recherche CNRS-IN2P3 Université Paris-Sud.
Spoke Cryomodules (WP4) Guillaume OLRY (CNRS/IPN Orsay) WP4 Deputy Leader April 21, 2015.
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
WP3 Required interfaces for cryostat design / integration Patxi DUTHIL SPL 3 rd Collaboration Meeting, CERN, Geneva November 12 th 2009.
SLHC Introduction to the “Workshop on Cryogenics and Vacuum Sectorization of the SPL” R. Garoby – 9/11/2009.
ESS Spoke Cryomodules: QA / QC Plans Workshop on Requirements Conformance for SRF Cryomodules, 15 th -16 th October 2014 Denis Reynet, Veronique Poux Sebastien.
Accelerator/WP High Beta Structures Alan Wheelhouse HIGH-BETA CAVITY DELIVERY April 21, 2015.
Workshop Objectives & Highlights from Daresbury Meeting Erk Jensen, CERN.
The ESS Linear Accelerator
Spoke test in vertical cryostat IPNO-UU Meeting on spoke test program, 2 nd -3 st October 2013 IPNO Team.
Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015.
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
HL-LHC Crab Cavity Review Debriefing Comments from LARP June 30, 2014.
This is an example text TIMELINE PROJECT PLANNING DecOctSepAugJulyJuneAprilMarchFebJanMayNov 12 Months Example text Go ahead and replace it with your own.
H. Danared | Cryomodule Workshop | Page 1 The In-Kind Process at ESS Håkan Danared Lund, 15 October 2014.
Project Parkway Timeline to 2011 April 1, 2010 Town Hall Meeting Steering Committee Schools February 2009 May 18, 2009 Project Parkway Community Kick-
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
General overview of WU : Cryogenic Distribution for Elliptical Linac Jarosław Fydrych Cryodistribution Project Engineer Preliminary Design Review,
Christine Darve ESS deputy WP leader Pierre BOSLAND, CEA Saclay External WP5 leader With special Acknowledgment to Nuno Elias (ESS) and Gilles Olivier.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
Pierre Bosland 4 TH OF FEBRUARY 2016 COORDINATION COMMITTEE FR-SW AGREEMENT STATUS OF THE FRENCH ACTIVITIES UNDER THE RESPONSIBILITY OF CEA.
Status of MICE RF for Step V’ (at LBNL) Derun Li Lawrence Berkeley National Laboratory December 6, 2014.
THE ESS ELLIPTICAL CAVITIES CRYOMODULES STAT US ON THE CEA SACLAY ACTIVITIES P. BOSLAND & F. ARDELLIER TAC13 07 th APRIL 2016.
Accelerator/Elliptical Cavities Cryomodules Pierre BOSLAND, CEA Saclay External WP5 leader Christine Darve, ESS deputy WP leader
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
H. Danared | Collaboration Board | Page 1 Status of In-Kind Contributions Håkan Danared Legnaro, 1 December 2014.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
LARP Crab Cavities Cryomodule Integration Meeting Final Notes A.Ratti LBNL.
A. Perin, TE/CRG, Page 2 CERN-GSI FAIR Project integration/coordination meeting 5 14 th October 2015 A. Perin, H. Derking, L. Stewart, M. Chesi,
ESS WP4 Strategy for series production ESS TAC10 – 5th to 6th November Lund Sébastien Bousson WP 4 leader.
Spoke Cryomodules Sébastien BOUSSON (IPNO), Christine DARVE (ESS) On behalf of the CNRS/IPNOrsay and ESS teams April, 2016.
H-ECCTD KICK-OFF DESCRIPTION AND CHALLENGES 16/03/2016 F. PEAUGER.
Accelerator Installation Plan: Graphical representation E. Sargsyan & L. Lari DRAFT - March March 2016.
H-ECCTD KICK-OFF DEVELOPMENT PLAN AND SCHEDULE 16/03/2016.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
P. Bosland CEA-Saclay Collaboration Board meeting Copenhagen 14/04/ Status of the French activities under the responsibility of CEA Philippe CHOMAZ.
EURISOL CB MEETING – PSI – 15 JUNE 2006 Sébastien Bousson IPN Orsay – Accelerator Division TASK 8 STATUS REPORT INFN – Legnaro IPN Orsay.
ESS Program Plan and Schedule Update
WP High Beta Cavities Delivery
Status of the M-ECCTD F. Peauger - P. Bosland
Spoke section of the ESS linac: - Status of prototypes and CDS-SL
ESS cavity procurement via in-kind contributions
Medium beta cryomodule demonstrator M-ECCTD
WG-1 Session Cavity Performance Cryomodule Performance
Hosting Orsay Walid KAABI
ESS RF Development at Uppsala University
Cryogenic C&C Scope of work
Status of the cryogenic system for B180
recent activities our company Jean Claude Le Scornet - Tomas JUNQUERA
DS Collimators TE-MSC-CI
Revision 1 to Document CWG-SFP-2/7-E 12 September 2017 Original: English Process and timetable for The elaboration of the ITU STRATEGIC and financial.
Proposed Strategic Planning Process for FY 2013/14 thru FY 2015/16
Report on HIE-ISOLDE Status
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Status of the CNRS Contribution to the ESS Accelerator
Prototype cryomodule development
Daresbury ESS In-Kind Contributions
Overall time schedule of SRF activities
Double-Spoke Cavities
Spoke section of the ESS linac: - Status of prototypes and CDS-SL
How Do We Define Acceptance of a Cryomodule? - A Discussion
Prototype cavities development
IKCA CEA Technical ANNEXES Follow up 18th DECEMBER 2015.
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
ACCSYS Collaboration Board Triestre, 3rd october 2017
Calendar Overview – Phase II – REVISED April 2019
Facility for Research Instrumentation and Accelerator Development
General Overview of WP 12 ESS Vacuum System
Presentation transcript:

CNRS contribution to ESS – 01/02/17 3 Spoke cavities 3 prototypes tested w/ excellent results Preparation & Heat treatment process @600°C validated on the two ZANON prototypes Mass production have started Niobium ordered (-> TOKYO DENKAI) Kick-off meeting Feb 1st 2017 First Nb sheets available in April 2017 Cavities ordered (-> ZANON) Kick-off meeting Jan 26th 29 cavities (26 + 3 spare / tuning procedure validation) 4 first cavities (pre-serie) should be ready end 2017 JL Biarrotte, CNRS/IN2P3

CNRS contribution to ESS – 01/02/17 3 Spoke couplers 4 prototypes fabricated 1 coupler validated (from PMB) Conditionned @nominal power Assembled on Romea cavity & sent to Upsala (Jan2017) Validation test of cavity+coupler in preparation at Upsala 3 other couplers (2 from SCT, 1 from PMB) out of order 2 broken windows (SCT), 1 brasing melting (PMB) 2 new prototypes under fabrication (PMB) Available end of march 2017 Tb conditionned & installed in prototype cryomodule Mass production should be launched within 3 months Once Upsala validation test successful Target = 1st couplers available March 2018 for first serie cryomodule assembly. JL Biarrotte, CNRS/IN2P3

CNRS contribution to ESS – 01/02/17 3 Spoke cryomodules & valve boxes Prototype valve box (CryoDiffusion) received summer 2016 Prototype cryomodule assembled Oct2016 Cryogenic tests on-going since Nov2016 Several cold leaks – reparation on-going 2K validation test still tb performed Review on spoke cryodistribution postponed to April2016 Goal = test of prototype cryomodule at nominal temperature and power end summer2017 at Upsala Serie: some easy elements about to be ordered Target = final cryomodule at Lund in June2019 (instead of January 2019 initially) JL Biarrotte, CNRS/IN2P3

CNRS contribution to ESS – 01/02/17 3 Miscellaneous Final meeting of the FR/SW collaboration – December2016 -> final report Regular meetings ESS / IPN Orsay organized every 2 weeks VAT issues a priori solved (transparent mandate ok ; internal procedure tb tested at first invoice). IK agreement CNRS/ESS signed Technical annexes: Spoke cryomodules: approved by ESS Council Cryodistribution: endorsed by IKRC#11 (Dec2016) Cryo C&C: detailed roadmap & costing under final discussion with ESS Contribution to elliptical cryomodules: agreement found with CEA – 0€ TA tb drafted & proposed to IKRC JL Biarrotte, CNRS/IN2P3