April 19th 2017 Work Unit 11.11.5.3 - AIK 11.2 CDR of the CDS-SL Installation integration.

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

Unit 45 Metal Framing Industry and Code Regulations • Light-gauge Steel Framing Members • Fasteners • Framing Tools • Metal Framing Safety • Light-gauge.
Step 1: Digging a Cellar On land, a majority of wells begin with digging a cellar from three to fifteen feet in depth. The purpose of a cellar is to align.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
WING SUPPORT CONCEPTS FOR WINGS # 2,3,6,7 AND 9 GARY MCGINNIS 09/19/ – TAPPING HOLES FOR STUDS 2 – STUD AND INSERT WELDING 3 – WELDING BRACKETS.
Flange-lok Installation Instructions Quick Installation Guide rev. DB.
The Preassembling Installation Survey & Alignment Accelerator Center of IHEP Qu Huamin 2006 / 4 / 27.
3 rd Harmonic He Vessel Welding Helium Vessel-to-Cavity No June 2008.
MICE Collaboration meeting at RAL 26 th Oct ~ 29 th Oct, 2004 Wrap up on Radiation Shielding Module Design Stephanie Yang 26 th October, 2004.
1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
SPACE FRAME Interface between the LGT and the IST 21/06/2011 Marco Ciapetti.
MR. PATTERSON CONSTRUCTION TECH 1
Installation. Indoor Unit Installation Typical Installation.
Introduction The Gamma Bracing System  Gamma bracing system is a light weight steel, structural truss bracing frame that fits INSIDE the timber studs.
The DUCTZ Experience. A Brief Overview of how DUCTZ Cleans a Heating and Cooling System.
Technical Details of the T2K Horns L. Bartoszek BARTOSZEK ENGINEERING NBI2006.
Chapter60 Parking Brakes.
CLASSE prototype: mechanical concepts G. De Michele, EPFL-PSI-CERN on behalf of CERN team SLAC, 16 th April, 2012.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
ZDC Remote Handling Tool Structure and Force Analysis P. Debbins University of Iowa December 10, 2009.
M. Karppinen TE-MSC-ML on behalf of S. Atieh, P. Cruikshank, M. Duret, J-C. Perez, V. Parma, T. Renaglia, S107, S108, Dubna teams Pressure relief valve.
CLM Maintenance. Covers : 1 - Side cover, 2 - Back cover, 3 Top cover, 4 - Lamp door, 5 - Side cover input and communication side, 6 - HEPA dust filter,
Lav meeting F. Raffaelli INFN – Sezione di Pisa C. Capoccia LNF, A. Cecchetti INFN – Sezione di Frascati CERN, Dec13 th, Feet friction studies. -Installation.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group Interface Workshops for ESS Warm-Linac: ISrc - LEBT.
Inner Triplet Review April 2007 Inner Triplet Supports Sonia Bartolomé Jiménez (TS/IC)
Motor Mounting MECH1200 Foot Mount: Simple and common Tabs or feet that are attached at the four corners of the motor and attaches to a bedplate. Sometimes.
1 InnoSys Quick Connect End Effecter Service and Maintenance Procedures Shreveport Assembly 14 MAY, 2008.
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Overview of the ESS Linac Cryogenic Distribution System
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
Potting Bench Plans Matt Howell Brooks County High School Quitman, Georgia Quitman, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
DECAM LN2 PUMP REMOVAL - CHECKLIST
VIEW SERIES with Sliding Door
Leads Institute of Technology & Engineering
Warm Vessel Leveling Islands (Piers)
STEP 1: ASSEMBLE ANGLE PLATES
Foundation – jay Desai.
OBJECTIVES Discuss parking brake pedals and automatic parking brake release. Explain parking brake linkages. Describe drum parking brakes. Describe caliper-actuated.
Assembly of the doorknob
Teleconf ACS – FREIA 28th March 2017
Girder-Magnets Installation
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
Awake Electrons Gun Introduction. - How works an electrons gun
Objectives Describe the fasteners, anchors, and adhesives used in construction and explain their uses. f. Identify various types of mechanical anchors.
Functional interfaces
TIDVG-4 TIDVG-4 Dump assembly, welding and installation Process sector BA1 February 2017 J. Humbert, (EN/MME) 06/02/2017 J. Humbert, EN-MME.
The 11T cryo-assembly: summary of design and integration aspects
Design of Distribution Feedbox at LHC P7
iSHELL Design Review Cryostat & Optics Bench
Assembly instructions for M-K all bolt together hoppercone kit.
Cryomodule Assembly Plan
Introduction The Gamma Bracing System
Installation guide for CX3 RG 7/11 compression connectors
Roof design Bunker Project CDR
Senad Kudumovic Design engineer
The Mechanical Engineering & Technology (MET)
WP11: CDS-SL CDR Overview
Neutron guide Shielding Concept
Bunker Wall Design Wall ESS
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
Positioning, alignment strategy and assembly steps
Where to Use Warning Lines
Work Unit AIK 11.2 CDR of the CDS-SL Mechanics
Simplified Procedure Draft
Hl-Lhc Triplet FSI target
Introduction The Gamma Bracing System
Presentation transcript:

April 19th 2017 Work Unit 11.11.5.3 - AIK 11.2 CDR of the CDS-SL Installation integration

CDS-SL Overview Part one : the valve box Part two : the headers units

Part one : installation of the valve boxes CDS-SL Part one : installation of the valve boxes

(floor fixation by anchors bolts) Tunnel integration Integration of the Valve box : support feet installation Intermediate plates (floor fixation by anchors bolts) Central foot Fiducials External feet Drilling jig (floor drilling) Multiplication of holes to prevent the concrete reinforcement

Electrical pulling/pushing vehicle Tunnel integration Valve box setting up Trolleys Electrical pulling/pushing vehicle

Tunnel integration Valve box setting up Put down and attach to the feet Introduction between the feet

Tunnel integration Valve box setting up Remove the 2 trolleys Ready to align

1,5” corner cube reflector Valve box alignment Alignment 7 fiducial marks 1,5” corner cube reflector (Fabien REY ESS-Alignment) 3 Adjustable and lockable feet (at 120°) Threaded shaft (fine thread) Thrust ball bearing Concave and convex washers Fine (sensitive) adjustement: - along X and Y axis : ±40mm - along Z axis : ± 50mm

Valve box and wave guide interface Space for RF distribution (wave guides) Wall Large free space under the support frame

Part two : installation of the headers units

Headers unit : Handling trolley Fine adjustement: - along X and Y axis : ±40mm - along Z axis : ± 50mm Threaded shaft (fine thread) Concave and convex washers Useful for: - transportation inside the tunnel - positioning Removable and reusable Adjusting screw Carrier ball

Tunnel integration Insertion of the header between two valve boxes Compression tooling Compression tooling 4 independant blocks The compression of the cryolines is required during installation (→ goal: free position of the bellows at cold T°)

Tunnel integration Insertion of the header between two valve boxes 5 mm gap (compression) 5 mm gap (compression) insertion Ajustment / Alignment Fixation and removal of the trolley

Tunnel integration Welding of the cryolines sleeves Relaxation of the bellows until contact between flanges Sleeves

Tunnel integration Welding of the cryolines sleeves Weld Weld Weld

Tunnel integration Welding of the cryolines sleeves Removal of the compression tooling

Tunnel integration Welding of the cryolines sleeves Sleeve He Supply line Easier to ensure the junction 4 times cut off TS lines 2 welds per sleeve VPL line

Tunnel integration Closing after global pressure test Thermal shield and MLI implementation

Tunnel integration Closing Dedicated tooling for sleeve translation

Tunnel integration Closing

Tunnel integration Closing Removal of the tooling Adjust weld weld

Tunnel integration Closing Removal of the tooling 1 m 2,2 m

Tunnel integration Continue with the installation…

CSP12 28 Novembre 2014 Thank you for your attention Special thanks to Syvain Brault (chief designer)