P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting HV-LV-DCS Status DCS barrel:G. Polese and P. Paolucci DCS endcap:A. Cimmino and.
Advertisements

P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#
Power distribution box XD1 top DTTF_Crate XD2 middle DTTF_Crate XD3 bottom DTTF_Crate Connection to DTTF_Crate through cable USE H07 ZZ-F 3G1,5 RACK S1D01.
NA62 GTK Cables & Patch Panels. TCC8_GTK1 TCC8_GTK2_GTK3.
Giovanni Polese 1 HV cabling multiconductor connettorization (600 ch) : pretest and fixing: 1 month * 2 people connectorization: 2 months * 2 people HV.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
LV and HV status of the RPC system RPC detector and trigger group.
Low Voltage LB status RPC detector and trigger group.
P. Paolucci - I.N.F.N. di Napoli 1 MTCC meeting May 06 HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV) 6/40  15% A3512N (HV) 10/10 
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
Paolucci INFN-Napoli Muon Annul Review Cern 15 September 2003 RPC cabling HV & LV cables Signal cables Position and composition of racks in UXC and USC.
17/03/2003 Referee Meeting M. Beretta 1 MDT Barrel - Complete LV-HV rack 6U 1U 4U 2U 45U 19” Tangential Fan High Voltage Crate Low Voltage Crate Heat Exchanger.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#
1 13 Octobre 2011 Laurent Roy ATCA Crate / Infrastructure in place -Rack in D3: dimension -Electrical power availability -Tell1 racks running in D3 (air.
06/03/2002Ivan Hruska EP/ATE1 LV brick for TILECAL  Overview Design summary Results from 2nd radiation tests in PSI Villingen Bulk supply Plans for future.
Cables Ian Crotty 8 May 2012 Cables for the RE4 Upscope in CMS News. The HV cables are in the Integration DB (INB/904) The Hv order is confirmed. Need.
ATLAS TRT Duke University CERN, Feb Fuse Box Status Duke University.
FTK infrastructures and DCS 02/12/20101FTK Initial Design Review - A. Lanza  Crates  Single rack layout  Cabling  Rack placement  DSS  DCS.
Rack Design Proposal as of 01/03/2013
PID meeting SNATS to SCATS New front end design
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
DCS: Temperature Probes
DCS: Temperature Probes
RPC Barrel HV & LV system Lappeenranta University
PMT cabling Gian Luca Raselli INFN Pavia
Electronics for RPC Upscope
HV & LV status LV system in W+1 and W+2 is OK
LV Test Napoli feb 05 Noise ripple: EASY - + CRATE LV cable
HV-LV, cabling & services
RPC Manufacturing Review - Pierluigi Paolucci - I.N.F.N. Napoli
RPC’s HV-LV project Introduction HV and LV requirements
RPC HV&LV systems Introduction Detector description Requirements
RPC Configuration DataBase Pierluigi Paolucci - I.N.F.N. of Naples.
RPC HV&LV systems Introduction Detector description Requirements
Pierluigi Paolucci - I.N.F.N. Naples
Pierluigi Paolucci - I.N.F.N. Naples
A. Boiano1, F. Loddo2, P. Paolucci1, D. Piccolo1, A. Ranieri2
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
Alfonso Boiano1, Flavio Loddo2, Pierluigi Paolucci1, Antonio Ranieri2
SPD cable length and rack location
RPC Detector Control System
23 Barrel chambers and 12 Endcap chambers
HV Imon in 1th MTCC period
RPC Detector Control System
RPC Detector Control System
RPC HV&LV systems Introduction Detector description Requirements
RPC Detector Control System
Dr. Pierluigi Paolucci - INFN di Napoli
HV-LV-DCS Status NEWS DCS Endcap Integration
RPC Detector Control System
Pierluigi Paolucci & Giovanni Polese
Dr. Pierluigi Paolucci - INFN di Napoli
RPC Detector Control System: towards the final system
RPC Detector Control System
RPC HV-LV project Introduction System requirements and description
RPC HV-LV project Introduction RPC description Requirements
HV & LV status LV system in W+1 and W+2 is OK
RPC Detector Control System
HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV)
RPC HV-LV project Introduction System requirements and description
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System
23 Barrel chambers and 12 Endcap chambers
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

Dr. Pierluigi Paolucci - INFN di Napoli 5/24/2019 EASY Crate board/crate channel/crate (max power) power/crate # crate/rack power/rack # A3486 LV 3 36 (11 watt/ch) < 900* 1 < 900 1ch/rack HV 4-5 24-30 (10 watt/ch) < 600** < 1800 2ch/rack 48 V - service 48 V - power EASY bus IN OUT A3486 AC/DC has 2 channels of 2 KW each * 3 boards with safety factor 2 ** 6 boards with safety factor 2 24/05/2019 Dr. Pierluigi Paolucci - INFN di Napoli Dr. Pierluigi Paolucci - INFN di Napoli

Dr. Pierluigi Paolucci - INFN di Napoli 5/24/2019 EASY crate back schema 24/05/2019 Dr. Pierluigi Paolucci - INFN di Napoli Dr. Pierluigi Paolucci - INFN di Napoli

EASY crate connection schema Dr. Pierluigi Paolucci - INFN di Napoli 5/24/2019 EASY crate connection schema Connector Cost Cable cost 48V power APP - 75A red/black + pin (14-8 awg) (2.1-8.2 mm2) 2.46 + 1.5 1 KW 2.5 (black) + 2.5 (red) + 3.0 (2 pins) = 8.0 48V service APP - 30A red/black + pin (16-12 awg) (1.5-4 mm2) 0.52 + 0.27 0.1 KW 0.52(black) + 0.52(red) + 0.54 (2 pins) = 1.58 EASY bus 50 pins flat cable 8.39 Flat 50 wires Earth Fork 7mm 0.10 48 V - service 48 V - power EASY bus IN OUT 24/05/2019 Dr. Pierluigi Paolucci - INFN di Napoli Dr. Pierluigi Paolucci - INFN di Napoli

NEW USC55 barrel HV system Dr. Pierluigi Paolucci - INFN di Napoli 5/24/2019 NEW USC55 barrel HV system 8U EASY 1 2 3 4 5 6 - fan tary heat exchange 1 2 3 4 - - - 44 U 36 input ch. 24 input ch. 48 output ch. 36 ch. 24 ch. 12 ch. HV distributor sect 11-12 sect 09-10 sect 08-07 sect 05-06 sect 03-04 sect 01-02 spare turbine 4U air deflector 2U S1H02-06 "wheel" crate schema General Information max HV EASY board: 7 ch. max EASY crate: 42 ch. HV distributor: 32 input ch (2 sectors) 16 output ch. Rack height tot: 56 U turbine 4 U air defl. 2 U Rack available height 50 U Total: 72/96 ch. We need (per wheel/rack) 72 ch  12 HV boards (reduced*) 96 ch  16 HV boards (final) 3 EASY crate (4-4-4) (6-6-4) 3 FAN crates + heat exchange 6 distributors + 1 RB4-sect4 join * RB3 and RB4 joint together (12 + 12) 24/05/2019 Dr. Pierluigi Paolucci - INFN di Napoli Dr. Pierluigi Paolucci - INFN di Napoli

NEW USC55 HV barrel racks composition Dr. Pierluigi Paolucci - INFN di Napoli 5/24/2019 NEW USC55 HV barrel racks composition HW numbers 15 EASY crates 60-80 HV boards A3512 360-480 HV channel 30+4 HV distributors 2 SY1527 mainframes 3 or 4 AC/DC 48 V - A3486 (or A3485) 136 components S1H07 4U turbine SY1527 HV 8U SY1527 LV 8U CABLE numbers EASY power (direct) 5 EASY power (daisy) 10 EASY service (direct) 2 EASY service (daisy) 14 Branch Contr. (direct) 2 Branch Contr. (daisy) 14 Fan unit contr. 15 EASY Ground - 15 SY1527 ground - 2 480 HV input + 240 HV out 800 cables AC/DC 48V service 3U 2x2 KW 34U AC/DC 48V power 3U 2x2 KW AC/DC 48V power 3U 2x2 KW AC/DC 48V power 3U 2x2 KW (spare ?) 2U air deflector 24/05/2019 Dr. Pierluigi Paolucci - INFN di Napoli Dr. Pierluigi Paolucci - INFN di Napoli

Dr. Pierluigi Paolucci - INFN di Napoli 5/24/2019 HV production Board Type Cost Quantity Total cost To order extra cost Mainframe SY1525 8,500 € 1 0 € Power 48 48V 2,350 € 3 7,050 € HVPS A3512N 3,500 € 60 210,000 € 20 *70,000 € Branch controller BC A1676 850 € 2 1,700 € Slave crate EASY3000 950 € 14 13,300 € Fan unit fan unit 800 € 11,200 € totale 247,050.00 € 77,050.00 € * 10 have been already financed (not yet ordered) = 35 KEuro 24/05/2019 Dr. Pierluigi Paolucci - INFN di Napoli Dr. Pierluigi Paolucci - INFN di Napoli

Dr. Pierluigi Paolucci - INFN di Napoli 5/24/2019 LV production Board Type Cost Quantity Total cost To order extra cost Mainframe SY1525 8,500 € 1 0 € Power 48 48V 2,350 € 10 23,500 € LVPS A3009 3,200 € 60 192,000 € Branch controller BC A1676 850 € 5 4,250 € Slave crate EASY3000 950 € 20 19,000 € Fan unit fan unit 800 € totale 223,750.00 € 23,500.00 € 24/05/2019 Dr. Pierluigi Paolucci - INFN di Napoli Dr. Pierluigi Paolucci - INFN di Napoli