Licensing update TAC 18 October 2018

Slides:



Advertisements
Similar presentations
IAEA RER/9/111: Establishing a Sustainable National Regulatory Infrastructure for Nuclear and Radiation Safety Regional Workshop on Drafting Regulations.
Advertisements

Safety at ESS. Thomas Hansson Nuclear Safety Engineer at ESS, since November 2011 Experience from Swedish Nuclear Power Plants since 1991 (Mainly Fuel.
Licensing of Nuclear Power Plants in Pakistan
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration USDOT – PHMSA HMEP Grants Major Audit Findings NASTTPO April 25,
Energy Forum 2011, Changing the Energy Paradigm and Outlook for South-Eastern EU Energy Forum 2011 Nuclear Safety Regulation in Romania Recent Developments.
2015 Safety Action Plan & Regulatory Strategy California Public Utilities Commission January 29, 2015.
Response to TAC8 and Annual Review Recommendations John Haines Head of Target Division April 2, 2014.
Leading the way; making a difference Ballast Water Management State of Affairs Hong Kong, 26 November 2013 Tim Wilkins INTERTANKO Senior Manager - Environment.
IAEA International Atomic Energy Agency Development of the Basis Document for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
European Spallation Source Overview and Status Technical Advisory Committee 1-2 April 2015 James H. Yeck ESS CEO & Director General
European Spallation Source Science Advisory Committee February 5-6, 2014 Jim Yeck CEO & Director General.
Personnel Safety Systems Stuart Birch Senior Engineer, Personnel Safety Systems November 6 th, 2014.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
PIP-II Environment, Safety, Health & Quality Assurance Strategy John Anderson Jr. DOE Independent Project Review of PIP-II 16 June 2015.
CBETA Project ALD’s Cost and Schedule Review February 6, 2017
ESS licensing process and Readiness Reviews
Cornerstone Phase 4 Update for Stakeholders October 19, 2011
Implementation Review Team Meeting
2011 Prioritization Update to Market Subcommittees
Francesco Forti University and INFN, Pisa
Overview of the FEPAC Accreditation Process
Self-Insurance Application Schedule – Key Dates*
Updates on ESS Handbook for Radiation Protection
Licensing update ESHAC #9, October 2018
Management System - update -
Radiation protection organisation
Student Administration and Support Programme and Project Timelines
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Far Experimental Hall Hutches Civil Construction
Far Experimental Hall Hutches Civil Construction
NERC Reliability Standards Development Plan
ESS Project Status Roland Garoby – Technical Director August 2018.
Status of U.S.-EU Bilateral Agreement
Cornerstone Phase 4 Update for Stakeholders October 19, 2011
XRN Nov 19 Release - Status Update
XRN Nov 19 Release - Status Update
Ciprian Plostinar Workshop on Testing and Commissioning
Student Administration and Support Programme and Project Timelines
NERC Reliability Standards Development Plan
Review of TDR Chapter 11 “Safety”
The Bunker Project Overview Zvonko Lazic
Details supporting the increase
Bunker Internal Review Welcome & Charge
Welcome and charge to the committee
Ctclink executive leadership committee May 31, 2018
Integrated Safety and Environmental Management
Imaging & Engineering STAP Meeting 12th-13th of April 2018
XRN Nov 19 Release - Status Update
ESS Management System SSM visit 24th October
Internal Audits Management Review Meetings
Radiation Protection Handbook
European Spallation Source ERIC
Welcome Update on ESS Construction Project
Radwaste: status & way forward
XRN Nov 19 Release - Status Update
High Level Readiness Reviews
Licensing update ESHAC #7, October 2017
Lessons from the 1st Safety Readiness Review
ESS Handbook on Radiation Protection Chapter 5 – Radioactive material
Charge and Agenda of the 18th TAC meeting
XRN Nov 19 Release - Status Update
Accelerator Installation Schedule
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
XRN 4927 – MiR Drop 4 - Status Update
SNS-PPU upgrades the existing accelerator structure
XRN Nov 19 Release - Status Update
General Overview of WP 12 ESS Vacuum System
Project Support Meeting January 9, 2019
Overview IAEA-ENSREG Workshop
Presentation transcript:

Licensing update TAC 18 October 2018 Johan Waldeck Senior Engineer / Licensing project manager Compliance to national law and European directives Regulated by SSM as a Complex facility Licensing activities a complex project in it self www.europeanspallationsource.se 20 May, 2019

Outline About SSM Licensing Status Work ahead

Procurement and Installation Licensing overview Preliminary Design Detailed design Procurement and Installation Commissioning Operation ESS project phases Permissibility Permit Installation Trial operation Routine operation SSM stepwise licensing process

High level trial operation plan The three stage approach for trial operation ESS wide planning determine submission dates for trial operation permits Warm LINAC Trial operation permit Full LINAC Neutron production

Licensing Project Goals Licensing plan to support execution of ESS project schedule Adequate quality of submission, minimising delays in approval process We can not afford significant requests for complementary information without delaying the start of RFQ commissioning

Progress since April Updated dimensioning scenario for Emergency Preparedness submitted to SSM in early April New scenario triggered by new experimental data on air born release fraction Decision by SSM 25 April ESS is Category 2 (NPPs Cat 1) No serious deterministic effects outside the facility Allows construction start of Science village SSM decision 7 May on information security for safety critical I&C software development

Progress since April continued Land and Environmental Court decision 19 June Final judgement of the court. Probationary period ended and preliminary conditions lifted (prohibition to start accelerator) SSM is now the sole regulator for radiation safety SSM decisions 20 June Permit for trial operation of Ion Source Permit to hold and use calibration sources SSM observers at SRR1 17-18 July Follow-up surveillance visit 30 August

SSM interactions Preview of revised conditions Physical Security Emergency preparedness Training, safety culture and Management system Agreement on principles to handle workers safety Planning meetings ESS-SSM Management meeting Agreement on how to change and extend current test stands Study visits by SSM Research Council SSM management team DGs of Nordic Radiation Safety Authorities

Interactions with ESS management Beyond weekly licensing project team meetings Close dialogue with ESS project manager and ESS installation project manager Weekly updates at ETB by Licensing Project manager Regular updates to EMT by Ass. Director Key licensing milestones in P6 plan for each construction project Explicit support and prioritization by EMT and ETB

Changes and Extensions of Test Stand permits staged approach according to project needs keeps licensing off critical path Test Stand 2 Change RF SC Cavity test Notification November 2018 Planned operation Feb 2019 Test Stand 2 RF Klystron test Permit June 2017 Operation started 13 Sept 2018 Ion Source Permit 20 June 2018 Safety Readiness Review 18 July 2018 Operation started 19 Sept 2018 Extension of permit Klystron test in gallery Submission Dec 2018 Planned operation Feb 2019 Extension of permit RF cavity test in tunnel Submission May 2019 Planned operation July 2019

Licensing timeline for trial operation As agreed at ESS-SSM management meeting June 2018 Ref Doc ready 2018-06-30 Ref Doc ready 2019-11-15 Ref Doc ready 2020-10-30 PSAR updated PSAR updated PSAR updated ESS Self Assessment Self Assessment Self Assessment Independent Safety Review Independent Safety Review Independent Safety Review Submission 2018-12-15 Submission 2020-04-30 Submission 2021-04-15 Response to questions SRR2 SRR4 SRR5 SRR1 RFQBeam BoD RBoT BoT IoS Beam 2019 2020 2021 2022 IoS permit Updated conditions Conditional permit Conditional permit Conditional permit Warm LINAC trial operation review SC LINAC trial operation review Intentional neutron production trial operation review SSM RFQ – Radio Frequency Quadropole BoD – Beam on Dump BoT - Beam on Target RBoT - Ready for Beam on Target PSAR – Preliminary Safety Analysis Report SRR - Safety Readiness Review SSM – Swedish Radiation Safety Authority

Licensing timeline for trial operation Plan adjusted for transition to new conditions Ref Doc ready 2018-10-15 Ref Doc ready 2019-11-15 Ref Doc ready 2020-10-30 PSAR updated PSAR updated PSAR updated ESS Self Assessment Self Assessment Self Assessment Independent Safety Review Independent Safety Review Independent Safety Review Submission 2019-04-30 Submission 2020-04-30 Submission 2021-04-15 Response to questions Subm. SRR2 SRR4 SRR5 Submission Submission SRR1 SRR RFQ Beam BoD RBoT BoT IoS Beam 2019 2020 2021 2022 IoS permit TS2 Extension IoS Extension For Klystron test IoS Extension For cavity test Conditional permit Conditional permit Conditional permit Warm LINAC trial operation review SC LINAC trial operation review Intentional neutron production trial operation review SSM RFQ – Radio Frequency Quadropole BoD – Beam on Dump BoT - Beam on Target RBoT - Ready for Beam on Target PSAR – Preliminary Safety Analysis Report SRR - Safety Readiness Review SSM – Swedish Radiation Safety Authority

Swedish implementation of directive 2013/59/Euratom considering ICRP, EU, IAEA, WENRA guidance Radiation protection act SFS 2018:396 replaces SFS 1988:220 Radiation protection regulation SFS 2018:506 replaces SFS 1988:293 and 2007:193 Radiation protection rule SSMFS 2018:1 replaces 2008:27, 2008:29, 2008:51, 2008:52 Radiation protection rule SSMFS 2018:3 replaces 2011:2 Updated Special conditions for ESS Many of the current special conditions is now regulated in 2018:1 Some of the remaining special conditions are less prescriptive Some special conditions has been removed due to a deeper insight to ESS Fewer and a more consistent and cohesive set of regulatory requirements Updated conditions received 15 October based on a mutually agreed transition point

Anticipated completion, changes and updates to reference documents The updated plan for NC LINAC submission including transition to new conditions Anticipated completion, changes and updates to reference documents Ref Doc ready 2018-10-15 Update of PSAR RevisedPSAR RevisedPSAR PSAR Translate updated conditions Self Assessment/Primary Safety Review Revised Self Assessment Self Assessment Implement PSR findings Independent Safety Review Translation of Self Assessment ISR report Submission 2019-04-30 Implement ISR recommendations Add translation of self assessment Oct 2018 Nov 2018 Dec 2018 Jan 2019 Feb 2019 Mar 2019 Apr 2019

Summary Permits received to allow Ion source commissioning and development of I&C software Numerous interactions with SSM Good collaboration and a clear strategy for moving forward Planning top down/bottom up Detailed schedule with weekly follow up implemented Schedule execution being challenging due to overallocation of resources or too optimistic work estimations Licensing not on critical path

Backup slides