On behalf of protection systems

Slides:



Advertisements
Similar presentations
Compressor ReVamp and Fabrication PO9452. Update Revised Concept Generation Selected some concepts Scheduled Conference call with Dresser Rand Schedules.
Advertisements

LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
7/26/2006 Wyatt Merritt 1 DECam CD1 Documentation DOE Critical Decision Process Documentation Requirements.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Week Milestone 1 Tue May 19 Milestone 2 Sat May 23 Milestone 3 Wed Jun 3 Milestone 4 Thu Jun 18 Milestone 5 Fri Jul 3 SECTION 1 May 19 - Jun.
Personnel Safety Systems Stuart Birch Senior Engineer, Personnel Safety Systems November 6 th, 2014.
1 Interfaces, Engineering and Standards. 2 Interfaces LoKI Interface document description for deliverables Elements: PBS number, Deliverable description,
Advanced Configuration
IT Strategy Roadmap Template
Timeline Roadmap Template


Week Today SECTION 1 Sub-task Sub-task 2





MON TUE WED THU
Lockheed Martin Canada’s SMB Mentoring Program
GANTT CHARTS Example Text Text Here Text Here Text Here Text Here

2017 Jan Sun Mon Tue Wed Thu Fri Sat







Jan Sun Mon Tue Wed Thu Fri Sat

2008 Calendar.

GANTT CHART can be used for scheduling generic resources as well as project management. They can also be used for scheduling production processes and.
Sun Mon Tue Wed Thu Fri Sat
CS/EE/ME 75(a) Nov. 19, 2018 Today: Prelimnary Design Review Homework.


Personnel Safety system 0 for the Ion Source and LEBT (PSS0)
Sun Mon Tue Wed Thu Fri Sat
Testing Coordination at ESS
Name: ______________________________
Introduction and Safety Plan
PSS verification and validation


1/○~1/○ weekly schedule MON TUE WED THU FRI SAT SUN MEMO
Safety Analysis and Safety Functions
2016 | 10 OCT SUN MON TUE WED THU FRI SAT
Safety Readiness Review (SRR) Thomas Hansson, ESH
Sun Mon Tue Wed Thu Fri Sat

TG3 Process /Part 2 Gábor László NSS Lead Instrument Engineer
Machine Protection PLC Based System Verification and Validation Plan
High Level Readiness Reviews
Licensing update ESHAC #7, October 2017
PSS verification and validation
Lessons from the 1st Safety Readiness Review
TSS Management: Procurement & Installation Planning
Atefeh Sadeghzadeh Control engineer – Target safety and control
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
TIMELINE NAME OF PROJECT Today 2016 Jan Feb Mar Apr May Jun


2008 Calendar.
Stuart Birch On behalf of Protection Systems Group
Presentation transcript:

On behalf of protection systems Roadmap for PSS 2018/2019 Stuart Birch On behalf of protection systems

2017 2017 Today Infrastructure design Hardware design Installation Cable containment design and BOM’s Purchase Materials (PK) Plan for installation (PK on framework) Hardware design Installation Commission System Design and BOM’s Purchase Materials (PK) 11 days Plan for installation (PK on framework) 100% 5 days 3 days 3 days 5/24 - 5/28 5/19 - 5/23 5/29 - 6/2 TS2 SRS Software design, Install & commission 10 days 65% 0 days 5 days 5 days 0 days Software Simulation 6/5 - 6/9 6/3 - 6/4 6/10 - 6/16 6/17 11 days 15% 2018 2019 2 days 4 days 5 days Week 48 Week 49 Week 5 Week 11 Week 14 Week 15 Week 16 Week 17 Week 18 6/18 - 6/23 6/30 - 7/3 6/24 - 6/29 4 days 1 day 2018-11-26 2019-02-01 2019-03-11 2019-04-01 2019-04-11 2019-04-16 2019-04-22 2019-04-30 TS2 PDR TS2 CDR TS2 FAT TS2 SAT TS2 SIT TS2 FIT TS2 PSS DEMO TS2 SRR 2017 2017 2018-11-18 2019-01-24 2019-04-24 1. ZHAW TS2 Documentation Today 2. ZHAW TS2 Documentation 3. ZHAW TS2 Documentation Documents for TS2 PDR TS2 Hazard and risk Analysis (ES&H) TS2 System description (AD) Safety Plan (PSS) TS2 Concept of Operations (PSS) TS2 SIL determination (PSS) V&V Plan (PSS) Documents for TS2 CDR TS2 PSS Electrical Drawings TS2 PSS Mechanical Drawings TS2 PSS Interface Control Documents TS2 PSS Installation and Commissioning plan TS2 PSS SIL Assessment TS2 Safety Requirements specification TS2 PSS Hardware design PSS Software planning document TS2 PSS Software design document Documents for TS2 SRR TS2 FAT Report TS2 SAT Report TS2 SIT Report TS2 FIT Report Procedures, Training documentation, presentations, etc.

2017 2017 Today Infrastructure design Hardware design PSS1 SRS Software design, Install & commission Documents for PSS1 CDR PSS1 Electrical Drawings PSS1 Mechanical Drawings PSS1 Interface Control Documents PSS1 Installation and Commissioning plan PSS1 SIL Assessment PSS1 Safety Requirements specification PSS1 Hardware design PSS Software planning document PSS Software design document Documents for PSS1 PDR PSS1 Hazard and risk Analysis (ES&H) NC LInac System description (AD) Safety Plan (PSS) PSS1 Concept of Operations (PSS) PSS1 SIL determination (PSS) V&V Plan (PSS) 11 days 100% 5 days 3 days 3 days 1. ZHAW PSS1 Documentation 1. ZHAW PSS1 Documentation 5/19 - 5/23 5/29 - 6/2 5/24 - 5/28 10 days 2019-02-23 2019-06-16 65% PSS1 PDR PSS1 CDR 0 days 0 days 5 days 5 days 2019-03-15 2019-07-01 6/3 - 6/4 6/5 - 6/9 6/17 6/10 - 6/16 11 days 15% 2018 2019 2 days 4 days 5 days Week 48 Week 49 Week 5 Week 8 Week 11 Week 14 Week 15 Week 16 Week 17 Week 18 Week 25 Week 27 6/30 - 7/3 6/18 - 6/23 6/24 - 6/29 4 days 1 day 2018-11-26 2019-02-01 2019-03-11 2019-04-01 2019-04-11 2019-04-16 2019-04-22 2019-04-30 TS2 PDR TS2 CDR TS2 FAT TS2 SAT TS2 SIT TS2 FIT TS2 PSS DEMO TS2 SRR 2017 2017 2018-11-18 2019-01-24 2019-01-24 1. ZHAW TS2 Documentation Today 2. ZHAW TS2 Documentation 3. ZHAW TS2 Documentation Documents for TS2 PDR TS2 Hazard and risk Analysis (ES&H) TS2 System description (AD) Safety Plan (PSS) TS2 Concept of Operations (PSS) TS2 PSS SIL determination (PSS) V&V Plan (PSS) Documents for TS2 CDR TS2 PSS Electrical Drawings TS2 PSS Mechanical Drawings TS2 PSS Interface Control Documents TS2 PSS Installation and Commissioning plan TS2 PSS SIL Assessment TS2 Safety Requirements specification TS2 PSS Hardware design PSS Software planning document TS2 PSS Software design document Documents for TS2 SRR TS2 FAT Report TS2 SAT Report TS2 SIT Report TS2 FIT Report Procedures, Training documentation, presentations, etc.

2017 2017 Today 11 days 100% 3 days 5 days 3 days 10 days 65% 0 days Documents for PSS1 CDR PSS1 Electrical Drawings PSS1 Mechanical Drawings PSS1 Interface Control Documents PSS1 Installation and Commissioning plan PSS1 SIL Assessment PSS1 Safety Requirements specification PSS1 Hardware design PSS Software planning document PSS Software design document Documents for PSS1 SRR PSS1 FAT Report PSS1 SAT Report PSS1 SIT Report PSS1 FIT Report Procedures, Training documentation, presentations, etc. 11 days 100% 3 days 5 days 3 days 2. ZHAW PSS1 Documentation 3. ZHAW PSS1 Documentation 5/29 - 6/2 5/24 - 5/28 5/19 - 5/23 10 days 2019-06-16 2019-10-22 65% PSS1 CDR 0 days 0 days 5 days 5 days 2019-07-01 PSS1 FAT PSS1 SAT PSS1 SIT PSS1 FIT PSS1 DEMO NCL SRR 6/5 - 6/9 6/10 - 6/16 6/3 - 6/4 6/17 2019-08-06 2019-09-05 2019-09-30 2019-10-08 2019-10-15 2019-11-01 11 days 15% 2019 5 days 2 days 4 days Week 25 Week 27 Week 32 Week 36 Week 40 Week 41 Week 42 Week 44 6/24 - 6/29 6/18 - 6/23 6/30 - 7/3 4 days 1 day Installation and component test Commission 2017 2017 Software design, Install & commission Today Software Simulation

Other work: ODH Phase 2 Target PSS Re-build the Lab Existing systems New access door system Materials access system Bunker??? Preparations for first instruments

Questions?

2017 2017 Today 11 days 100% 3 days 3 days 5 days 10 days 65% 0 days SECTION 1 May 19 - Jun 2 100% 3 days 3 days 5 days Sub-task Sub-task 2 Sub-task 3 5/19 - 5/23 5/29 - 6/2 5/24 - 5/28 10 days SECTION 2 Jun 3 - Jun 17 65% 0 days 5 days 5 days 0 days Sub-task 1 Sub-task 2 Sub-task 3 Sub-task 4 - zero duration 6/10 - 6/16 6/17 6/3 - 6/4 6/5 - 6/9 11 days SECTION 3 Jun 18 - Jul 3 15% 5 days 4 days 2 days Sub-task 1 Sub-task 2 Sub-sections 1 6/30 - 7/3 6/24 - 6/29 6/18 - 6/23 4 days Sub-sub-task 1 6/27 - 7/2 1 day Sub-sub-task 2 7/3 2018 2017 2017 Week 48 2 3 4 5 6 7 8 Today Tue May 23 Sun Jun 18 Milestone 2 Sat Jun 3 Milestone 4 Mon Jul 3 Milestone 3 Milestone 5 Fri May 19 Milestone 1