Design-Build Acquisition and Contract Incentives May 9, 2019

Slides:



Advertisements
Similar presentations
Wickwire Gavin, P.C. Minnesota Department of Transportation November 29, 2000 Michael C. Loulakis, Esq. Design-Build: Understanding the Basics.
Advertisements

Construction Engineering 221
Managing Construction Risks
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
CONTRACT A binding agreement between two or more parties for performing, or refraining from performing, some specified act(s) in exchange for lawful consideration.
Procurement Management
Contracting for Laboratory Services Ann Mullin Cleveland US Geological Survey Presented to the Environmental Protection Agency Science Advisory Board April.
Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee.
Chapter 12 Estimate Summaries and Bids. Bid Summaries The format of the summary depends for what the estimate is to be used. –Ordering materials –Calculating.
Contract Law 2014 NCHCA Education Series- January 23, 2014 Presented by Geoffrey Cantello, City of Ottawa and Ron Price, Rasmussen Starr Ruddy LLP.
Alternative Project Delivery
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
Legal Perspective on NDOT Alternative Procurements Geoffrey S. Petrov, Nossaman LLP.
Measure L Program Implementation Management Considerations Report to the Board of Trustees San Joaquin Delta Community College District July 13, 2004.
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
PROCEDURES FOR SELECTING THE CONTRACTOR
KFUPM, Department of Construction Engineering and Management Summary of AN IMPLEMENTATION MODEL FOR DESIGN-BUILD (D-B) PROJECT DELIVERY SYSTEM BY : MOHAMMAD.
Office of Traffic, Safety and Technology Module 6 Specifications and Special Provisions Traffic Control Plan Development Course.
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
Determining Innovative Contracting Methods to Reduce User Costs Stuart Thompson Utah Technology Transfer Center.
Construction: Legal Issues. Legal Issues In the Bidding Process Timing of various activities has legal implications. During the bidding process: –A bid.
Construction Contracts and Project Delivery Methods
Richard E. Thompson II, Esq.
WSPP Contract Subcommittee February 3, 2011 Meeting Notes These notes are to facilitate discussions of a WSPP REC Service Schedule, are subject to revision,
TIDEWATER GOVERNMENT INDUSTRY COUNCIL How to Analyze Party Obligations Under a Contract By Damien Walsh and Beverly Arviso.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
Do you have what it takes to win the next P3 or D-B Project? Steven Kramer, PE Vice President Jacobs.
MAKING IT HAPPEN. TRB 88 th Annual Meeting Risk Management in Public-Private Partnerships January 14, 2009 Statutory and Public Policy Approaches to PPP.
CONTRACT PRICING ALTERNATIVES Presented by: Fahad H. Al-Anazi CEM 520 February 27,1999.
Safe & Sound Bridge Improvement Program. Purpose of Meeting Introduction of Team Today’s discussion  History of Safe & Sound  DBFM to MDBB/DB split.
FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING SPRING SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.
LACCD Building the Future THOMAS HALL Director Facilities Planning and Development.
Construction Management At Risk Process
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
English for Construction Engineering Management ,建筑工 程专业英语 赖小东 授课教师:赖小东 Cell# 江西财经大学旅游与城市管理学院工程管理系.
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
Renting vs. Buying Housing
Contracting Officer Podcast Slides
Types of Fixed Price Contracts
Subaward - 2 CFR A formal legal agreement between your institution and another legal entity An award provided by a pass-through entity (PTE) to.
BOT LAW (R.A. No. 6957, as amended by R.A. No. 7718)
Contract Formulation and Administration
Life Cycle of Federal Acquisition
PRESENTER Jose A. Galan ▸ Division Director, Internal Services Department, Real Estate Development Division ▸ Current Chair of the Florida Council For.
Light Rail Transit Project
Procurement Management
Resident Engineer Training
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
12.1 Plan Procurement Management
Award Management Services
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
CDBG Procurement Date of Session, 2017 Washington, DC Brian Delvaux
Ch 11 - Procurement Management Learning Objectives
What Small and Emerging Contractors Need to Know Understanding Funds Administration © Copyright 2017 NASBP.
Safety Responsibilities
Types of contract selection based upon following:
2017 NB Building Trades Unions Conference Irving Oil Bid Award Process
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Innovative Contracting and Trns*Port
Request for Proposal & Proposal
AX7665D82 Areawide Total Maximum Daily Load (TMDL) Design-Build
Green Line Extension Project
Design-Build Process Utilizing Negotiated Selection
Traditional Steps Leading To A Bid Document
PROJECT DELIVERY METHODS
Design-Build Acquisition and Contract Incentives July 19, 2018
BIDDING DOCUMENTS AND MAIN FEATURES
Construction Contracts
Second Avenue Subway Project Execution Strategy
Presentation transcript:

Design-Build Acquisition and Contract Incentives May 9, 2019 DBIA Webinar #4 Design-Build Acquisition and Contract Incentives May 9, 2019 Presented by Evan Caplicki, Esq.

Outline DBIA Best Practices Design-Build Procurements Design-Build Contracts Completion Milestones Other

DBIA Best Practices Design-Build Done Right DBIA Best Practices https://dbia.org/best-practices/ Position Statements Manual of Practice

Manual of Practice - Contract Incentives and Design-Build Acquisition

Design-Build Procurements

Design-Build Procurements Qualifications Based Selection Best Value Selection Combination of price and technical Can also include schedule Weighted criteria Fixed Price Competitive Design Fixed Price Most Scope Build-to-Budget Integrated Assessment and Trade-off Low Bid

Procurement Incentives

Stipends A stipend is an amount paid by the owner to those shortlisted responsive proposers who are unsuccessful in obtaining contract award. Encourages participation and innovation DBIA endorses the use of stipends Federal sector, including FHWA, encourages the use of stipends Various industry surveys have shown stipends ranging from 0.01% to 0.25% of the project budget Check jurisdictional limitations

A+B Bidding Under “A + B” or cost-plus-time bidding, two factors are considered in low bid determination: “A” component is the traditional price bid “B” component is calendar days to completion Formula: A + (B x Daily Cost) = Bid value Daily Cost is determined by the Owner and provided to the Proposers in the RFP documents

Other Procurement Incentives Alternative Technical Concepts Local Preference ROW credits Package/scope

Contract Incentives and Disincentives

Time-Based Incentives Can be used throughout the project term Contract must be clear as to what constitutes “completion” for a bonus Contract must address how delays, time extensions and contract terms affect the incentives

Time-Based Incentives Consider the reasoning behind using them Does the Owner benefit from early completion? Does the bonus really incentivize the Design-Builder? Can the Design-Builder game the bonus scheme?

Completion Bonuses Daily or fixed amount bonuses for early completion Daily amount Set by the Owner Based on the daily cost saved Note Design-Builder benefits regardless by saving on daily overhead Fixed amount Design-Builder may not proceed apace if the date will not be met

Completion Bonuses for Revenue Projects Daily or Fixed Amount Tied to revenue service Options include: Daily amount based on daily cost saved and expected revenues Fixed Amount, including fixed amount for timely completion A portion of the revenue earned by the Owner during the period between early completion and planned completion Need to be coordinated with other aspects of the work, such as toll services and financing

The Disincentive: Liquidated Damages Damages agreed upon prior to contract execution Legal sufficiency Actual damages must be difficult to ascertain Must be a reasonable measure of damages in light of circumstances at the time of contracting Cannot be a penalty Considerations Sole remedy against design-builder for specified costs Can be combined with actual damages for other costs Should be commercially reasonable Need a clear trigger for the assessment of LDs Ceilings on the total amount of LDs Will the Design-Builder just price them?

Liquidated Damages for Delay Step-down between Substantial Completion and Final Acceptance Can be used throughout the project term Public agencies have wide berth in setting the amounts Liquidated damages versus stipulated damages

Other Incentives Award Fee program Risk sharing Bonus incentives for meeting pre-determined performance criteria for performance guarantees, quality, change management, claims management, timely delivery of submittals, program controls, site safety, commissioning, socioeconomic programs compliance, warranty work, or other areas DBIA Manual of Practice Risk sharing Allowances with risk sharing Performance incentives

Other Incentives Contingency pool Long term warranties Contingency amount established by owner or negotiated Change orders for eligible events are paid out of contingency Remaining contingency shared by contractor and owner Risk of insufficient contingency can be a project risk or assigned to a party Long term warranties O&M responsibility

Other Disincentives Withholding portions of monthly payments Liquidated damages for performance Buy-downs of performance guarantees to a specific level Substitutions of key personnel Environmental non-compliance “Lane rentals” Deductions for noncompliance (more typical in P3s) Disincentives are enforceable only if they meet liquidated damage prerequisites

QUESTIONS? Evan Caplicki NOSSAMAN LLP 777 South Figueroa Street, 34th Floor Los Angeles, California 90017 T 213.612.7877 M 512.809.5629 ecaplicki@nossaman.com