Complex 2030 A Preferred Infrastructure Planning Scenario for the Nuclear Weapons Complex Nuclear and non-nuclear strike capabilities Defenses Responsive.

Slides:



Advertisements
Similar presentations
1 Getting the Job Done May 2006 Complex 2030 A Preferred Infrastructure Planning Scenario for the Nuclear Weapons Complex Nuclear and non-nuclear strike.
Advertisements

Global Congress Global Leadership Vision for Project Management.
Portfolio Management at DOE/NNSA Kirby Brace Chief Operating Officer (240) (o) (954) (c)
Briefing to the Commission to Review the Effectiveness of the National Energy Laboratories (CRENEL) Joseph McBrearty, Deputy Director for Field Operations.
ERS Overview 5/15/12 | Page-1 Distribution Statement A – Cleared for public release by OSR, SR Case #s 12-S-0258, 0817, 1003, and 1854 apply. Affordable,
1 EM Update and Perspective David Huizenga Senior Advisor for Environmental Management 2012 DOE Project Management Workshop April 3, 2012.
Chapter 10 Accounting Information Systems and Internal Controls
N A T I O N A L N U C L E A R S E C U R I T Y A D M I N I S T R A T I O N O F F I C E O F D E F E N S E P R O G R A M S Fusion Ignition and Stockpile Stewardship.
Primary Benefit Types Value Discipline Benefits – Operating Excellence Reduce Cost Reduce Risk – Product Leadership Increase Revenue – Customer Intimacy.
April 6, NPR in Context Third comprehensive review of U.S. nuclear policies and posture –Previous reviews in 1994 and 2001 Conducted by DoD.
1 The Acquisition, Technology & Logistics Team must INNOVATE AND COLLABORATE to deliver EFFECTIVE, AFFORDABLE tools for the joint warfighter. Understand.
© 2006 Carnegie Mellon University Establishing a Network Centric Capability: Implications for Acquisition and Engineering Dennis Smith Complex System Symposium.
DoD Systems and Software Engineering A Strategy for Enhanced Systems Engineering Kristen Baldwin Acting Director, Systems and Software Engineering Office.
September 2005 Director of Education, Training and Research Partnerships Idaho National Laboratory and University Academic Centers of Excellence Andrew.
April 5, The President’s Nuclear Security Agenda First articulated in Prague in April 2009 –Reduce nuclear dangers and pursue the long-term goal.
FY2010 PEMP Notable Outcomes October 15, FRA, LLC Board of Directors 10/15-16/2009 Office of Quality and Best Practices Performance Evaluation Management.
Overview of NIPP 2013: Partnering for Critical Infrastructure Security and Resilience October 2013 DRAFT.
DoD Acquisition Domain (Sourcing) (DADS) Analysis of Alternatives (AoA) E-Business/SPS Joint Users’ Conference November 15-19, 2004 Houston, TX.
Association for Biblical Higher Education February 13, 2013 Lori Jo Stanfield Evaluator Team Training for Business Officers.
Environment, Safety and Occupational Health (ESOH) in the DoD Business Management Modernization Program April 2005 John Coho I&E Business Transformation.
Cultural Resource Management in the Department of Defense September 29, 2005 Maureen Sullivan Federal Preservation Officer.
Logistics McGraw-Hill/Irwin
Personnel Requirements for Implementing the New Triad Robert B. Barker December 15, 2005.
Model Contract Implementation at Sandia National Laboratories Risk Based Oversight Dan Pellegrino Sandia Site Office November, 2007.
1 Goals and Targets to Direct FY2010 Budget and Stimulus.
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
DOE ASSET MANAGEMENT PLAN
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
A (Very Basic) Introduction to the Kansas City Plant Jay Coghlan, Executive Director, Nuclear Watch New Mexico October 2007.
Laboratory Operations Board
1 27 August 2009 Maryfrances Herrera Safety and Security Interface.
PPBS Planning Programming Budgeting Systems. PPBS The Department of Defense is the only Agency to use this type of budget.budget.
Personnel and Readiness Personnel and Readiness Current Issues Dr. David S. C. Chu Under Secretary of Defense (Personnel and Readiness) September 8, 2008.
Improving performance, reducing risk Dr Apostolos Noulis, Lead Assessor, Business Development Mgr Thessaloniki, 02 June 2014 ISO Energy Management.
Shared Services Initiative Summary of Findings and Next Steps.
DoD Lead Agent: Office of the Assistant Secretary of the Army (Installations and Environment) Department of Defense Voluntary Protection Programs Center.
American Recovery & Reinvestment Act Office of Environmental Management Presentation to Regulators March 6, 2009 Cynthia V. Anderson, EM Recovery Act Program.
2016 ADC TRANSITION POLICY DOCUMENT FORUM. Key Policy Issues.
Development, Validation, Implementation and Enhancement for a Voluntary Protection Programs Center of Excellence (VPP CX) Capability for the Department.
JMFIP Financial Management Conference
Michael J. Novak ASQ Section 0511 Meeting, February 8, 2017
Oregon State Rail Plan Update
Strategic Information Systems Planning
EFCOG Startup and Commissioning Task Team Introduction
International Security and Peace
“Existing world order is being redefined.” Henry Kissinger Jan 2015
and Security Management: ISO 28000
Guiding Principles The Acquisition, Technology & Logistics Team must INNOVATE AND COLLABORATE to deliver EFFECTIVE, AFFORDABLE tools for the joint warfighter.
Identify the Risk of Not Doing BA
Goals and Targets to Direct FY2010 Budget and Stimulus
Improving Mission Effectiveness By Exploiting the Command’s Implementation Of the DoD Enterprise Services Management Framework - DESMF in the [name the.
DOE Nuclear Safety Research and Development Program
Asset Governance – Integrated Strategic Asset Management
Navy Medicine Strategic Plan FY15
SUPPLIER PARTNERSHIP 2.
The SWA Collaborative Behaviors
Overview of working draft v. 29 January 2018
UNIT – OPERATION STRATEGY
Defense Logistics: Integrated and Efficient
Implementation Guide for Linking Adults to Opportunity
Defense Health Agency Industry Exchange J-6 I&O’s Enterprise Approach by COL Beverly Beavers November 08, 2018 Authorized Use Only Authorized Use Only.
Workshop Session I.
Enterprise Architecture at Penn State
Employee engagement Delivery guide
USACE infrastructure team update
KEY INITIATIVE Financial Data and Analytics
The National Environmental Policy Act and the SRS Plutonium Bomb Plant
MODULE 11: Creating a TSMO Program Plan
Stephen Porter Safeguards & Security Working Group
I4.0 in Action The importance of people and culture in the Industry 4.0 transformation journey Industry 4.0 Industry 3.0 Industry 2.0 Industry 1.0 Cyber.
Presentation transcript:

Complex 2030 A Preferred Infrastructure Planning Scenario for the Nuclear Weapons Complex Nuclear and non-nuclear strike capabilities Defenses Responsive Infrastructure Command and Control, Intelligence, Planning “Getting the Job Done” May 2006

Vision for the Future “We can, and will, change the size, the composition, the character of our nuclear forces in a way that reflects the reality that the Cold War is over. I am committed to achieving a credible deterrent with the lowest-possible number of nuclear weapons consistent with our national security needs, including our obligations to our allies.” President Bush, May 2001

Enablers of Transformation Today Future 2001 2012 2012-2030 Future Increased confidence in warhead designs and demonstration of a responsive infrastructure will enable a reduction in total stockpile size

Principles for Change Meet national security responsibilities to the current stockpile without interruptions. Preserve a premier science and technology base as essential to future nuclear capabilities. Demonstrate all phases of production required to maintain the U.S. nuclear weapons stockpile. In partnership with the DoD, transform the stockpile consistent with the Nuclear Posture Review through concepts such as a reliable replacement warhead (RRW). Balance current life-extension programs for legacy weapons with a transition to RRW concepts. Transform the complex to be more responsive and cost-effective. Start plans with an assumption that no additional new funds are available for transformation. Operations of the complex will be simplified and essential capabilities/capacities maintained.

Complex 2030 Scenario Version 8.1

Four Long-term Strategies and A Near-Term Commitment In partnership with DoD, transform the nuclear stockpile Transform to a modernized, cost-effective nuclear weapons complex Create a fully integrated and interdependent nuclear weapons complex Drive the science and technology base essential for long-term national security Build confidence in the transformation process Stockpile Transformation Complex Integration Complex Transformation Promote S&T for assurance, dissuasion, and deterrence Build Confidence

Long-term Implementation Strategies In partnership with DoD, transform the nuclear stockpile. Transform to an RRW-stockpile by ~2030. Transform to a modernized, cost-effective nuclear weapons complex. Go to a consolidated plutonium center by 2022 with distributed modernization in place for remaining capabilities. Start NNSA scoping of a programmatic environmental impact statement on future complex alternatives in 2006. Consolidate CAT I/II special nuclear (SNM) materials – no CAT I/II SNM at national labs in the long-term, fewer locations within production plants. Create a consolidated plutonium center for CAT I/II quantities of materials. Modernize remaining production capabilities in place (e.g., uranium at Y-12). Stockpile Transformation Complex Integration Complex Transformation Promote S&T for assurance, dissuasion, and deterrence Build Confidence

Consolidated plutonium Complex 2030 1980 LLNL KCP NTS LANL Y-12 PX SNL Consolidated plutonium center SRS 14 independent sites 12 Cat I/II SNM sites Located at existing Cat I/II SNM site to be determined 8 geographical sites - modernized - reduced footprints 1 integrated network - contracts consolidated - centralized acquisition - shared facilities 3-4 Cat I/II SNM sites LLNL NTS LANL SNL PX KCP SRS Today Y-12 Stockpile size Dismantlements Complex square footage Legend: Cat I/II SNM 8 independent sites 6-7 Cat I/II SNM sites Other DOE Cat I/II SNM No Cat I/II SNM

Long-term Implementation Strategies Create a fully integrated and interdependent complex Manage risk Fewer, standard contracts Streamline processes and uniform business practices Drive the science and technology base essential for national security Define essential long-term capabilities Integrate with DOE Office of Science and enhance work-for-others Eliminate duplicative facilities and programs

“Getting the Job Done” Building Confidence in the Transformation Process NNSA short term commitments: Continue to deliver products to DoD. Eliminate backlog of surveillance units in FY 2007. Accelerate dismantlement of retired weapons by 49% from FY 2006 to FY 2007. Deliver B61-7/11 First Production Unit (FPU) in FY 2006. Deliver W76 FPU in FY 2007. Certify the W88 with a new pit and manufacture 10 pits in FY 2007. Extract Tritium in FY2007. Support the science base by completing: pit lifetime estimates (2006), ASC Purple machine (2006), MESA (2008), DARHT (2008), and NIF (2010). Support an RRW decision by the Nuclear Weapons Council in Nov 2006. Implement starting actions to achieve Complex 2030 infrastructure vision.

Key Transformation Activities Involving LLNL Support NNSA initiatives in partnership with the Department of Defense to transform the nuclear stockpile through the design and development of Reliable Replacement Warheads (RRW) Remove CAT I/II SNM from LLNL by the end of 2014 consistent with the availability of repository sites, and support the closure of Building 332. Transition large-scale hydrotesting to NTS and support closure of Site 300. Rely on capability computing at a single site at any one time (accessible complex-wide) and distributed capacity computing at multiple sites. Operate high-energy density physics facilities (e.g., NIF), as well as other major science assets, as national, shared user facilities. Establish a Supply Chain Management Center by end of 2007. Create a more integrated and interdependent system of laboratories, plants, and test sites.

Backup

January Process Output Department of Defense (DoD) Congress Secretary of Energy Advisory Board Defense Nuclear Facilities Safety Board (DNFSB) Ourselves Others November Retreat Single-Minded Initial Scenario Document Version Process for Establishing a Preferred Infrastructure Planning Scenario V.0.0 January Process Input V.1.0 Multi-Minded Middle Management V.2.0 V.3.0 V.4.0 V.5.0 January Process Output V.6.0 V.6.1 V.7.0 January Retreat Department of Defense DNFSB National Security Council Office of Management & Budget Congress Others Stakeholder Socialization V.8.0. . … V.XX.0

SEAB Task Force Recommendations NNSA 2030 Complex Recommendations Design Reliable Replacement Warhead immediately Same Accelerate dismantlements Establish Office of Transformation Create integrated, interdependent enterprise Manage risks effectively with risk-informed decision making and cost-benefit analysis Establish Consolidated Nuclear Production Center (CNPC) by ~2015 Establish distributed production centers of excellence and consolidate plutonium center at an existing Cat I/II SNM site by early 2020s Consolidate all Category I/II Special Nuclear Material (Cat I/II SNM) to CNPC long-term Consolidate Cat I/II SNM to fewer sites and within sites; remove from laboratories

Transform the Nuclear Stockpile Legacy Stockpile Program of Record Smaller but all Legacy Stockpile Legacy Stockpile Program of Record Smaller, Transformed, RRW Stockpile Transformed, Smaller RRW Stockpile – Component reuse as near-term option with new components later Things we will do: Maintain the viability of legacy weapons until replaced. Assure confidence in the reliability, safety, security, and performance of the nuclear deterrent without underground nuclear testing. Accelerate dismantlement completion from 2034 to 2023 of legacy weapons currently planned for retirement. Engage in partnership with the Department of Defense to deploy reliable replacement warhead (RRW) concepts. Work with DoD to modify legacy stockpile Program of Record: Suggest limiting number of W76-1 warheads completed in the Life Extension Program (LEP). Suggest canceling the W80 LEP now and reducing warhead numbers. Suggest reducing the number of B61-7 refurbishments and canceling the B61 non-nuclear LEP. Suggest canceling the W78 LEP. Implement a continuous design/deployment cycle that exercises the design and production capabilities and enables responsiveness of the nuclear weapons complex. Sustain capability to test.

Modernize the Nuclear Weapons Complex (Nuclear Issues) Near-term NEPA process likely not required to implement, i.e., this could be considered as the “no action” alternative. Go straight to Modernize in Place Go fast to a Consolidated Nuclear Production Center (CNPC) Program of Record Go to a consolidated plutonium center by 2022 with distributed modernization in place for remaining capabilities Near-term NEPA process likely required to implement. Go slower with a phased approach to a CNPC with Interim Facilities

Modernize the Nuclear Weapons Complex (Nuclear Issues) Start scoping of a potential National Environmental Policy Act (NEPA) process in 2006 on future complex alternatives and siting decisions. In addition, begin independent business case assessments to support decisions. Reduce the number of sites with CAT I/II special nuclear materials (SNM): Eliminate need for CAT I/II SNM security at SNL by end of 2008. De-inventory CAT I/II SNM removed from LLNL by the end of 2014 (tied to CMRR). Move SNM in 2008 or earlier. By 2022 LANL (the Laboratory) will not operate facilities containing CAT I/II quantities of SNM. The location and operator of the consolidated plutonium center will be determined following NEPA compliance actions. Upgrade Y-12 as the NNSA CAT I/II uranium center: Complete HEUMF and plan/build a UPF with a baseline capacity of 125 units per year. Achieve significant reductions in Cat I/II SNM footprint at Y-12. Plan, construct, and start up a consolidated plutonium center at an existing CAT I/II site for long-term NNSA plutonium CAT I/II R&D, surveillance, manufacturing, and storage/disposition operations. Complete the consolidated plutonium center with a capacity to support 125 RRW war reserve pits per year by 2022. Upgrade PF-4 to support an interim production rate of 30 to 50 RRW war reserve pits/year by 2012. Complete CMRR with CAT I/II capability until 2022 to support PF-4 and closure of LLNL B332 and LANL CMR. Upgrade Pantex throughput for increased assembly/disassembly operations. Use DAF as backup for weapon assembly/disassembly/dismantlement operations. Transition large-scale hydrotesting to NTS. Prepare LLNL Site 300 disposition plan in 2007. Retain tritium capabilities and consolidate R&D.

Modernize the Nuclear Weapons Complex (Non-Nuclear Issues) Establish a Supply Chain Management Center by end of 2007. Create a smaller non-nuclear production facility that is occupied by 2012 for components that cannot be outsourced. Outsource synthesis and formulation of high explosive (HE) materials as practical, outsource or consolidate large-scale HE production pressing, and consolidate HE machining to Pantex. Consolidate HE R&D and laboratory-scale testing (without Cat I/II SNM). Maintain secure transportation assets to support DOE-wide requirements. Rely on capability computing at a single site at any one time (accessible complex-wide) and distributed capacity computing at multiple sites. Operate high-energy density physics facilities (e.g., LANSCE, Omega, Z, and NIF), as well as other major science assets, as national, shared user facilities. Cease NNSA operations at Tonopah Test Range by end of 2009 through use of alternative, non-NNSA operated ranges and elimination of joint test assemblies containing SNM through alternative designs and/or test techniques.

Create a Fully Integrated and Interdependent Complex Create a more integrated and interdependent system of laboratories, plants, and test sites. Use fewer, more standard, contracts to incentivize sharing of risks & rewards across the complex and implement approaches that balance mission, safety and security. Use an independent, national-level organization to lead requirements development and cost estimating for construction projects and use a recognized contract management firm. Implement uniformity across the nuclear weapon complex in business practices, information management, program management, risk management, and RTBF. Ensure NNSA Leadership works in a uniform, integrated manner that balances competing priorities. Establish structure (e.g., systems engineering and integration contractor and clear roles/responsibilities) to balance competing priorities across missions, risks, program elements, and distributed sites. Implement an approach and culture that manages risk rather than seeks to eliminate it. Apply risk-informed decision-making to safety and security (both physical and cyber) decisions. Implement actions in response to Defense Science Board February 2006 recommendations. Ensure intellectual competition, peer review, and essential nuclear capabilities are sustained during consolidation of missions and elimination of redundancies. Implement predictive surveillance evaluations to reduce flight-test requirements.

Drive Science and Technology Base Establish a science and technology model by the end of 2007 that defines the needed capabilities required to sustain the stockpile in the long term. Recognize that Work for Others plays an essential role in maintaining capabilities required for the NNSA mission. Encourage stronger Work for Others in key mission areas. Manage the transition to a lower cost NNSA national laboratory complex. Develop a plan by the end of 2007 to eliminate duplicative facilities and programs and maintain key capabilities. Partner with the Office of Science and other leading national R&D sponsors regarding the national laboratory complex. Define options and recommended path forward by the end of 2007. Develop jointly funded, integrated programs within NNSA and the DOE Office of Science that develop the leading edge science and engineering capabilities needed for national security. Implement joint planning between the Office of Science and NNSA starting a pilot in the FY 2008 budget cycle.

Responsive Infrastructure Objectives Identify, understand, and fix stockpile problems in time to assure continued confidence in the reliability and safety of the stockpile. Dismantle warheads on a timescale consistent with policy requirements. Ensure warheads are available to augment the operationally deployed force on a timescale that supports DoD requirements. Design, develop, certify, and complete first production units of refurbished or replacement warheads on a frequency that both sustains the stockpile and exercises the supporting infrastructure and critical skills. Improve the capability to design, develop, certify, and complete production of new or adapted warheads in the event of new military requirements. Produce required quantities of warheads in time to meet military requirements. Demonstrate nuclear competencies that assure allies, dissuade adversaries, and ensure against technological surprise. Sustain readiness to conduct underground nuclear tests. Ensure an economically sustainable nuclear weapons enterprise.