Engineering and Physics Department support for LUSI

Slides:



Advertisements
Similar presentations
E PIC I MPLEMENTATION O RGANIZATION STRUCTURE Lisa Buller Mount Auburn Hospital.
Advertisements

Incident Command System
1 BROOKHAVEN SCIENCE ASSOCIATES Environment, Safety and Health Steve Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting March 29, 2012.
Team Software Process By: Bryan Peterson. Presentation Topics History Brief overview of the Team Software Process (TSP) TSP Team Launch Team-working Conclusion.
ENG M 501 Production and Operations Management Exam #3 Summary April 2009 John Doucette Dept. of Mechanical Engineering University of Alberta
LCLS Transition to Science DOE Status Review of the LUSI MIE Project LCLS NEH ARR John Arthur LCLS Experimental Facilities Division August 11, 2009 Welcome.
Tom Fornek LUSI 12 November 2008 SLAC National Accelerator Laboratory 1 LUSI Status Update Tom Fornek Project Manager.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project The Instrument Readiness Review Process John Arthur LCLS Experimental Facilities Division.
EEN [Canada] Forum Shelley Borys Director, Evaluation September 30, 2010 Developing Evaluation Capacity.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project NEH status and XFD operations Hal Tompkins, John Arthur LCLS Experimental Facilities.
1 T. Fornek 1 LUSI CXI FIDR June 3, 2009 Thomas Fornek Project Manager June 3, 2009 LUSI Coherent X-Ray Imaging Instrument Final.
1 T. Fornek 1 LUSI XCS FIDR June 17, 2009 Thomas Fornek Project Manager June 17, 2009 LUSI X-Ray Correlation Spectroscopy Instrument.
Hamid Shoaee LCLS Control April 20, 2006 LCLS Control System Organization & Integration with the rest of the lab, Accelerator.
David Pindroh Procurement Overview LUSI DOE Review 8/19/08 – 8/21/08 p.1 LCLS Ultrafast Science Instruments (LUSI) David Pindroh – LCLS Procurement Manager.
David McGiven FAC: Construction April 2006 Facility Advisory Committee (FAC) Construction Procurement David.
What is the Global Grading Project
Hamid Shoaee LCLS Control April 20, 2006 LCLS Control System Controls Organization Overview A Progress Report Hamid Shoaee.
CMM Level 3 KPA’s CS4320 Fall Organizational Process Focus (Goals) Software process development and improvement activities are coordinated across.
Engineering Management From The Top Power Behind the Storage.
November 10, 2010 Administrative Program Review at Boston College.
Chapter Three Organizational Structures.
1 E. Bong 1 XCS Final Instrument Design Review Engineering Status April 21, 2009 LUSI WBS 1.4 X-Ray Correlation Spectroscopy Final.
Electronic Faculty Effort & Cost Share Opt-In Process for Tracking Divisions Strategic Projects Spring, 2009.
Planning for security Microsoft View
Felix B. Fernandez LUSI DOE Review August 20, 2008 PMCS Overview p. 1 LCLS Ultrafast Science Instruments (LUSI) Felix B. Fernandez.
Professional Recruit Tracking System (PRTS) Purpose – Why Are We Here? –Background – Where Have We Been? –System Status – Where Are We? –Future Directions.
Management organization/ organization structure Three basic organizational structures Functional Project Matrix.
1 David Schultz 1 SLAC Self-Assessment Programs meeting ASO Requirements David Schultz LCLS Program Division Director SLAC National.
WMATA Project Implementation Manual (PIM) Stage 3, Construction Chapter 200, Authority Representative, Responsibilities and Functions Presenters: David.
THE GOVERNMENT OF THE HONG KONG SPECIAL ADMINISTRATIVE REGION FIRE SERVICES DEPARTMENT.
The Government of the Hong Kong Special Administrative Region Fire Services Department.
Managing Multiple Projects Steve Westerman California Department of Motor Vehicles Steve Young Mathtech, Inc.
3 STUDENT ASSESSMENT DEPARTMENT
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
Leading Your District To Be All That It Can Be David Williams, Deputy Director Div. of Soil & Water Conservation 2016 Spring Area Meetings.
P ERSONAL & TEAM PROCESS MODELS Lecture 05 Part -2.
Cañada College Professional Development Committee Determining Participants.
National Quality Standards Framework
National Quality Standards Framework
Nadine Kurita - LUSI Chief Engineer
Western Michigan University Central Power Plant
Accreditation External Review
Project Management W. J. Foyt
Accelerator Operations Department Readiness (Part 2)
Project Organization, Leadership, & Control Reading: pp. 351 – 339.
LUSI Coordination with LCLS
Experimental Facilities Planning
Linac Ops Budget Review LCLS Overview / Org Structure / Legacies
Linac Ops Budget Structure & Approach WBS 1 – LCLS Mgmt & Admin
LINAC OPS Budget Review
Development of LCLS Far Experimental Hall Hutches
Coherent X-ray Imaging WBS 1.3
LERF Readiness Review: Charge
Installation of Photon Beam Transport to FEH
Electron Beam Systems ETC and Methodology
Thomas Fornek Project Manager July 15, 2009
LCLS Project Management
Tom Fornek Project Manager April 20-22, 2009
Ian Evans SSRL Safety Office
LUSI MANAGEMENT OVERVIEW
Department of Teaching & Learning
Project Management Issues John N. Galayda, SLAC April 24, 2002
John Arthur – LCLS Experimental Operations
Linac Coherent Light Source Transition to Operations 11 July 2007
Richard Hislop Construction Safety Coordinator
DOE Review of the LCLS Project October 2006
Electron Beam Systems ETC and Methodology
LUSI Controls and Data Systems W.B.S. 1.6
SHARE Special Project SHARE Benefits Optimization
Presentation transcript:

Engineering and Physics Department support for LUSI David Schultz – EPD Director April 21, 2009

The LCLS Directorate

Engineering & Physics Division The role of EPD. Provide centralized Engineering and Physics expertise matrixed to LCLS Directorate activities. Establish and maintain standards for those services. Maintain and Control the LCLS Configuration. Track LCLS availability and assess risk.

EPD Organization

EPD Engineering Engineering Department 27 people in the department supporting, (matrixed) LUSI MIE (increasing) LCLS Project (decreasing) LCLS Commissioning LCLS Operations and Improvements Other SLAC Accelerator projects Civil engineering and Building management Design supervision EPD provides Unified framework for Standards and Coordination Professional development and staff administration

EPD Organization LUSI personnel and support highlighted

EPD-LUSI Engineering Support XPP J. Langton, J. Defever CXI P. Montanez, A. Busse, D. Schafer, W. Olsen, M. Ramos XCS E. Bong, M. Kosovsky DCO E. Ortiz, T. Montagne, M. Campell Design Supervision P. Stephens, D. Arnett Design support through the Mechanical Design dept. 5 additional engineering positions are currently posted to support LCLS effort. BOA for Task Order based Engineering services in progress.

Summary The Engineering & Physics Division provides matrixed expertise and standards to LCLS efforts. The mechanical engineering staff is >half committed to LUSI. Additional people are being brought in. Additional EPD support for LUSI in Planning & Installation. Support will be given to meet ARRA advanced schedules.