WP 3: Fire propagation and its limitation

Slides:



Advertisements
Similar presentations
Coupling a Network HVAC Model to a Computational Fluid Dynamics Model Using Large Eddy Simulation Jason Floyd Hughes Associates, Inc Fire + Evacuation.
Advertisements

MINISTERO DELL’INTERNO DIPARTIMENTO DEI VIGILI DEL FUOCO, DEL SOCCORSO PUBBLICO E DELLA DIFESA CIVILE DIREZIONE CENTRALE PER LA FORMAZIONE An Application.
Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas Tunnel Life Safety and Egress Accelerator.
Enclosure Fire Dynamics
FIRE MODELING OF THE SANDIA TESTS (NUREG/CG-4681) An Educational Program to Improve the Level of Teaching Risk-Informed, Performance-based Fire Protection.
Global Design Effort - CFS ILC CFS Baseline Technical Review - CERN 1 ILC CFS BASELINE TECHNICAL REVIEW AMERICAS REGION LIFE SAFETY CONVENTIONAL.
SAFETY FOLLOW-UP HL-LHC PROJECT WP17 – Infrastructures meeting S. La Mendola, Jose Gascon DGS/SEE 09 July 2015.
HSE Preliminary General Requirements for FCC layout and air management A. Henriques & M. Widorski on behalf of the HSE Unit 17/12/2014 FCC I&O Meeting.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
The University of Waterloo Fire Research Facility Institute for the Advancement of Fire Safety E. Weckman, C. Devaud, A. Strong and D. Johnson Mechanical.
First Considerations on CLIC Cooling System Ch. Martel, J. Inigo-Golfin TS/CV.
Conventional Facilities and Siting Global Design Effort Safety Requirements for IR Conventional Facilities and Siting Group Safety Requirements for IR.
Pro-Science 4 th International Conference of Hydrogen Safety, September 12-14, 2011, SAN FRANCISCO, USA EXPERIMENTAL STUDY OF IGNITED UNSTEADY HYDROGEN.
Atrium Fire Protection
CLIC CES Webex 12 Nov Summary: – Set of fire safety measures defined in CERN Safety Report – Proposed Structure for CLIC/ILC Fire Safety Report Fabio.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Helium Spill Test in LHC tunnel to define length of restricted working areas  Actual situation  Evolution  How to continue  Set-up of the spilling.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
CLIC CES Meeting 14 jan 2009 A resume table for fire safety in LHC, and a possible scheme for other machine – part 1 CERN –SC Fabio Corsanego.
VENTILATION PRINCIPLE FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 28/7/2009 Already presented by C. Martel/ J Inigo Golfin on15 th October 2008 CLIC WORKSHOP.
Conventional Facilities and Siting 1 Alternate Site and Tunnel Configuration Status Report KEK (2) Nov. 2008, Chicago Global Design Effort Masami Tanaka.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Wu. Y., International Conference on Hydrogen Safety, September Initial Assessment of the Impact of Jet Flame Hazard From Hydrogen Cars In.
FDS5 Simulation Results for VESDA Performance in HKCEC 2MW Fire Test (For internal info only) AEG, Xtralis Jan
2 DGS-SEE SEMINAR ON FIRE PROTECTION FOR PHYSICS RESEARCH FACILITIES OCTOBER 2015 CERN FIRE SIMULATIONS IN THE PS ACCELERATOR TUNNEL TO DEFINE A.
Task Force on Safety of Personnel in LHC underground areas following the sector 34 accident of 19-Sep-2008 Status report LPC 07/05/2009 B. Delille, S.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
Modeling Smoke Transport in Aircraft Cargo Compartments Jill Suo-Anttila ‡, Stefan Domino †, Walt Gill ‡, Paul DesJardin ‡, and Lou Gritzo ‡ ‡ Fire Science.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
Europe / CERN studies for SB2009 ILC Re-Baseling J.Osborne CERN (CFS & CES) 2009 Linear Collider Workshop of the Americas 28 September - 4 October 2009.
Integration and Installation Status for Collaboration Meeting Ans Pardons, 29/9/2015.
Review of FCC tunnel footprint & implementation Introduction & scope Philippe Lebrun Review of FCC tunnel footprint & implementation CERN, 11 June 2015.
Power, Cooling, Cables, Simulations of Heat Dissipation Short overview of ongoing work on these points Technical Coordination (Rolf Lindner et al.) Cooling.
ESS KAY CONSULTANTS MEP CONSULTANTS. WHAT IS MEP ??? MECHANICAL ELECTRICAL MEP PLUMBING.
Magnet R&D for Large Volume Magnetization A.V. Zlobin Fermilab Fifth IDS-NF Plenary Meeting 8-10 April 2010 at Fermilab.
Design considerations for the FCC electrical network architecture FCC week 2016, Rome, April 2016 Davide Bozzini - CERN/EN/EL With the contribution.
N-TOF review HVAC and cooling systems Proposal to be validated by the project CERN TS/CV 13th February 2008.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May ML Single Tunnel Configurations In Deep Underground Accessed with Long.
HIE-ISOLDE Workshop: The Technical Aspects Target Area Infrastructure Ventilation 29 November 2013 Andrea Polato* - CERN EN-CV-PJ * The research project.
SuperB Experimental hall General considerations on the Babar experimental area Preliminary space requirements hall proposal. A floor plan. Specification.
E- source kick-off meeting e- Source RDR- Conventional Facility & Siting Overview Fred Asiri/SLAC.
First Outcome of the Task Force on Safety of Personnel in LHC underground areas following the sector 34 accident of 19-Sep-2008 R. Trant on behalf of the.
Update on the PSB Cooling and Ventilation Systems
MEDICIS Safety Alarms Systems
ALARA Committee of 14th May 2012
Review of the International Linear Collider (ILC) Electrical and Mechanical System Design to be held at CERN on 21 March, 2012 The purpose of the Review.
2007 IEEE Nuclear Science Symposium (NSS)
1st FCC Infrastructure & Operation meeting
FCC Cryo-magnet Logistics
Installation of an Instrument on a CERN machine
SOME PROBLEMS FOR ASSESSMENT OF FIRE IN ROAD TUNNELS
2016.
COOLING & VENTILATION INFRASTRUCTURE
nuSTORM and the Physics Beyond Colliders workshop
Decree of the Ministry of Interior 3rd August 2015 The “so called” Italian Fire Prevention Code - IFC: S7 – Fire Detection and Alarm Systems Piergiacomo.
Decree of the Ministry of Interior 3rd August 2015 The “so called” Italian Fire Prevention Code - IFC: S6 – Fire Control and Suppression provisions.
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
Maintenance at ALBA facility: Strategy for the conventional services
WP 2 Update Fire Detection and Extinguishing FCC Collaboration
WP1: Fire Statistics: Introduction and Status
Heating, Ventilation and Air Conditioning HVAC
Workshop on fire protection for physics research facilities
FCC study – Fire collaboration WP4 Status & Update
North Area Safety Review 2019
Presentation transcript:

WP 3: Fire propagation and its limitation Michael Plagge June 20/21 2017 @ ESS

Sub work packages/topics WP 3.1 Air management systems WP 3.2 Reference design fires WP 3.3 Smoke extraction optimization WP 3.4 Filter policies w.r.t. RP June 20/21 2017 @ ESS

WP 3.1 Air management systems Input received from DESY HERA XFEL ESS FNAL LNBF ILC CERN input Accelerator complex Large-scale experiments Beam line facilities (ISOLDE, MEDICIS, etc.) June 20/21 2017 @ ESS

WP 3.1 Air management systems Normal air management accelerator tunnel configurations CERN Proton Synchrotron PS – transversal + longitudinal Super Proton Synchrotron SPS - longitudinal Large Hadron Collider LHC - longitudinal DESY HERA - longitudinal XFEL - longitudinal ESS - longitudinal FNAL LNBF – dedicated smoke extraction system ILC June 20/21 2017 @ ESS

WP 3.1 Air management systems DESY – XFEL Smoke extraction Surface buildings: And the heat vent areas outlined in DIN 18230-1 are equal to or greater than 5% of the total floor space of the section Experimental hall A mechanical smoke extraction system will be provided. Mechanical smoke extraction triggered by fire detection? Linear accelerator tunnel (planned) To be installed at the start of the equipment installation phase Smoke compartments ≈ 600 m, 23,000 m3・h-1 Max. smoke generation rate 17,640 m3・h-1 x 1.3 (30% ambient air) Secured functionality: min. 50 minutes at 600ºC Automatic triggering by smoke detection; manual triggering etc. Fan out tunnel (beam lines); partially Longitudinal smoke extraction, or, Mechanical smoke extraction, depending on fire load density ✗ ✓ 🇩🇪 🇬🇧 Security and Workplace Safety Concepts for the Construction, Installation and Operation of the XFEL Research Facility, STUVA e.V., 2005 June 20/21 2017 @ ESS

WP 3.1 Air management systems DESY – XFEL Smoke extraction ✗ Smoke extraction duct Whole tunnel is used for longitudinal smoke extraction; In both directions! Separation wall with two oppositely swinging air flaps and three water jets in the passage area Separation wall along escape and rescue route Security and Workplace Safety Concepts for the Construction, Installation and Operation of the XFEL Research Facility, STUVA e.V., 2005 June 20/21 2017 @ ESS

WP 3.1 Air management systems ESS “Ventilation systems should be operated in such way as to limit the potential release of radio nuclides and their operation should be compatible with fire protection requirements.” Operation: 0.5 air changes per hour Flush mode: 2 air changes per hour Maintenance: up to 2 air changes per hour Fire incident mode: stop supply units, keep extraction running Modes 1 and 2 must preserve negative pressure level of about 60 Pa w.r.t. the ambient Modes 3 is not constrained by dynamic confinement requirements Mode 4 could lead to higher pressure difference Activation of sprinkler system: does it impact the dynamic confinement? ESS-0001051, Protection against Fire and Explosion, March 04, 2013 ESS-0039122, DM--SD-TBSIDDG01- System Description G01 HVAC, June 13, 2016 June 20/21 2017 @ ESS

WP 3.1 Air management systems FNAL – LNBF: real smoke extraction J. Priest and J. Niehoff, Fire Safety Strategy for LBNF Project at SURF Presentation to the City of Lead AHJ, November 2016 ARUP, South Dakota Science and Technology Authority, A/E Services for Building, Site & Infrastructure Design in Support of the LBNF Far Site Conventional Facilities, Cavern Smoke Control Report, September, 2016 June 20/21 2017 @ ESS

WP 3.2 Reference design fires Input CHRISTIFIRE & Tristan’s PhD work Electrical cabinet tests (PRISME, etc.) Reverse engineering CEA CDI cabinet data LTH Hi-LHC scenarios Fire testing (cables, polyethylene etc.) DESY cable fire report, XFEL safety concept CERN fire reports June 20/21 2017 @ ESS

WP 3.2 Reference design fires Geometry depending Material depending Fuel vs. ventilation controlled scenarios Based on heat release rate (HRR) Pre-scribed HRR vs. more reality approach Suitability for accelerator and large-scale experiment facilities June 20/21 2017 @ ESS

WP 3.2 Reference design fires Electrical cabinets Half-closed Closed Open configuration: Peak HRR up to 1.6 MW Durations > 60 min Energy released ≈ 1.2 GJ/cab. Closed config.: Peak HRR up to 0.6 MW Energy released up to 0.6 MJ/cab. J. M. Chavez. An experimental investigation of internally ignited fires in nuclear power plant control cabinets, Part 1: Cabinet effects tests, NUREG/CR-4527/1, SAND86-0336. Technical report, Sandia National Laboratories, 1987. J Mangs, J Paananen, O Keski-Rahkonen, Calorimetric fire experiments on electronic cabinets, Fire Safety Journal, Volume 38, Issue 2, 2003, Pages 165-186, ISSN 0379-7112, http://dx.doi.org/10.1016/S0379-7112(02)00055-3. W. Plumecocq, M. Coutin, S. Melis, L. Rigollet, Characterization of closed-doors electrical cabinet fires in compartments, Fire Safety Journal, Volume 46, Issue 5, 2011, Pages 243-253, ISSN 0379-7112, http://dx.doi.org/10.1016/j.firesaf.2011.02.006. CERN: cabinets housing custom made equipment at large-scale experiments are partially protected EDMS 880054, MiniMax fire extinguishing system in ATLAS Experiment, May 2008 XFEL: all cabinets supplied with fire detection and inert gas ext. system Security and Workplace Safety Concepts for the Construction, Installation and Operation of the XFEL Research Facility, STUVA e.V., 2005 June 20/21 2017 @ ESS

WP 3.2 Reference design fires DESY – XFEL Fire load density calculations Initial fire load in XTL is about 87.5 kg/m. Scaling of fire load w.r.t. a U2-type subway train (Frankfurt, Germany): Length 23m Heat of combustion approx. 22.53 MJ/kg; 88 GJ total Maximum smoke release rate 19 m3/s after 15 minutes (3,419 kg) Security and Workplace Safety Concepts for the Construction, Installation and Operation of the XFEL Research Facility, STUVA e.V., 2005 June 20/21 2017 @ ESS

WP 3.2 Reference design fires DESY – XFEL Fire load density calculations XTD5 180m Fire load: 766 MJ/m Smoke generation rate per 10m: 1.9 m3/s Fire load density Security and Workplace Safety Concepts for the Construction, Installation and Operation of the XFEL Research Facility, STUVA e.V., 2005 June 20/21 2017 @ ESS

WP 3.3 Smoke extraction optimization Oriol’s work on simplified tunnel modeling Proposal based on FDS by Saverio Tristan looking into implementing Latin Hypercube sampling on CERN resources High performance computing resources to be allocated Does this item makes sense on CDR level? O. Rios, Usability of simplified tunnel modelling with MineFirePro+ for CERN’s accelerator complex, ongoing, 2017 to present EDMS 1396658, A smoke extraction system for FCC - Feasibility study, July 2014 Kathrin Grewolls, Probabilistic Modelling of Sensitivity in Fire Simulations, Dissertation, University of Central Lancashire, July 2013 FDSgeogen, http://www.fz-juelich.de/ias/jsc/EN/Research/ModellingSimulation/CivilSecurityTraffic/FireDynamics/Software/_node.html June 20/21 2017 @ ESS

WP 3.4 Filter policies w.r.t. RP DESY No principal filter use; continuous RP monitoring system PANDORA in place at outlets Automatic shutdown of air handling units based on thresholds ESS Type 7 + HEPA filters for air supply and extraction units CERN continuous RP monitoring system RAMSES in place Beam line laboratories (ISOLDE, MEDICIS) CERN, EDMS 1711815, AIR MANAGEMENT OF CERN ACCELERATORS AND EXPERIMENTS, July 28, 2016 (under approval) DESY, F. Saretzki, S. Mohr, Contribution FCC collaboration interim report, December 2016 ESS, ESS-0039122, DM--SD-TBSIDDG01- System Description G01 HVAC, June 13, 2016 June 20/21 2017 @ ESS

WP 3.4 Filter policies w.r.t. RP CT-Analyst, e.g. for the assessment of filter choice / accidents https://www.nrl.navy.mil/lcp/ct-analyst http://www.bbk.bund.de/DE/TopThema/TT_2012/Software_CT-Analyst_Hamburg.html Figure: The entire CT-Analyst GUI display predicting lethality for a scenario involving four separate chlorine releases in downtown Baghdad. […] Computation for this composite display takes about 0.1 second.* * J. Boris et al., Fast and accurate prediction of windborne contaminant plumes for civil defense in cities, The Fifth International Symposium on Computational Wind Engineering (CWE2010), Chapel Hill, North Carolina, USA May 23-27, 2010 June 20/21 2017 @ ESS

Where are we? ✓ ✓ ✓ FNAL: Technical note, LTH: Document, ESS: Report June 20/21 2017 @ ESS

Discussions! June 20/21 2017 @ ESS http://minimumble.thebookofbiff.com/2012/03/07/58-collision/ June 20/21 2017 @ ESS