LAMAS October 2018 Agenda Item 4.1 LMI Review – main scenarios

Slides:



Advertisements
Similar presentations
EUROPEAN COMMISSION - EUROSTAT ESSnet on Consistency of Concepts and Methods of business-related Statistics 2010 project on statistical units n°
Advertisements

EDIT validation tool item 8 of the agenda Structural Business Statistics Working Group 14 April 2015, Luxembourg Arlind Dobërdolani.
Eurostat Ag.no "Annex 2" supplement to Eurostat Annual Report, October 2015 Working Group on Article 64 and Article 65 of the Staff Regulations Meeting.
Gender Equality is key towards the eradication of Violence against Women.
Economic benefits of gender equality in the EU
Eurojust cases involving crimes against children
Weighting issues in EU-LFS
Working Party on Regional Statistics 1-2 October 2012
5. Areas under organic farming
Ag.no. 15 Lessons from the 2015 A65 exercise
GBV survey: progress EUROSTAT 20 March 2018.
Natura 2000 – SCI Union Lists
2.1. ESS Agreement on Learning Mobility (IVET & Youth)
LAMAS October 2017 Draft Conclusions.
LAMAS Working Group January 2016
Overview of Regional Indicators
Dr Mario Oetheimer Civil Society Days 2018 Brussels, May 2018
Compliance Item 4.2 Compliance Doc. ASA/TE/743-rev1
LAMAS Working Group October 2013
Ag.no.16 A65 country manuals and country assessments
SBS Compliance report item 3 of the agenda
Report on WISE Art.8 and GIS issues
Habides update (May 2011).
Agenda Item Minimum wages -
Education and Training Statistics Working Group
LAMAS October 2017 Agenda Item 3.2 Labour Cost Indices state of play Daniel Iscru Hubertus Vreeswijk.
Agenda Item 2.1 SES 2014: follow-up
LAMAS October 2016 Agenda Item 3.2 SDMX tests and revision policies for LCI Hubertus Vreeswijk Daniel Iscru.
ETS Working Group, 5-6th June 2012
LAMAS October 2016 Agenda Item 2.1
LAMAS January 2016 Agenda Item 2.3 Annual update of the gross hourly earnings Eusebio Bezzina.
LAMAS October 2017 Agenda Item 4.1 JVS State of play Thibaut HENRION.
LAMAS Working Group October 2014
LAMAS Working Group 29 June-1 July 2016
LAMAS Working Group 5-6 October 2016
Progress Report on Annual Financial Accounts
LAMAS October 2016 Agenda Item 3.1 Labour Cost Indices state of play Hubertus Vreeswijk Daniel Iscru.
Agenda Item SDMX 2.1 for LCI -
Item 7.1 Implementation of the 2016 Adult Education Survey
Item 8.1 Implementation of the 2016 Adult Education Survey
Programme adoptions Cohesion Policy:
Ag.no. 15 Lessons from the 2016 A65 exercise
ETS Working Group meeting 24-25/9/2007 Agenda point 7 CVTS3 brief update /09/ 2007 ETS working group.
State of play: data transmission, validation and dissemination
LAMAS October 2017 Agenda Item 5.1 Consultation to stakeholders
Agenda Item 3.1 Labour Cost Survey 2016
Proposal for granting access to HOUSEHOLD BUDGET SURVEYS (HBS)
LAMAS Working Group 7 – 8 December 2016
Core Variables Implementation
Item 4.3 – Repeal of CVTS legal acts
3.6. Impact of population and housing census results on population stocks and on LFS and SILC–follow-up DSS Meeting September 2012.
EuroGroups register First results of measures on advancement
Labour market statistics- State of play
ESS Security and Secure exchange of information Expert Group (E4SEG) Item 1 of the agenda IT security assurance DIME/ITDG SG Meeting London 15/2/20189.
State of Play RBMPs and WISE reporting (9/07/10)
Item 4.2 – Towards the 2016 AES Philippe Lombardo Eurostat-F5
FISIM State of play Agenda Item 3.
European Statistical Training Programme (ESTP)
Update on legal issues Strategic Coordination Group 23 February 2010
Item 3 Observed consistency and revisions
Doc.A6465/16/03 Ag.no.16 A65 country manuals
LAMAS Working Group June 2018
LAMAS Working Group 7-8 December 2016
Doc.A6465/14/04 Ag.16 A65 country manuals
IT security assurance – 2018 and beyond Item 2 of the agenda DIME/ITDG Steering Group June 2018 Pascal JACQUES ESTAT B2/LISO.
LAMAS Working Group 5-6 October 2016
Working Group meeting "Statistics on Living Conditions"
LAMAS Working Group June 2015
LAMAS Working Group June 2018
Connectivity to secure networks
Presentation transcript:

LAMAS October 2018 Agenda Item 4.1 LMI Review – main scenarios Ines.Kolakovic@ec.europa.eu

OUTLINE I. Background II. Main Scenarios – initial proposals III. LAMAS consultation IV. Timetable V. Proposal

I. Background Since 2016, ESTAT.F3 engaged in revision of the existing legislation in the field of business-based labour market surveys (LMI Review) Steps taken so far: Consolidation of the acquis Consultation of compilers (LAMAS-LMI) Consultation of users on their needs 1st meeting of the dedicated Taskforce: TF 'LMI Review' Benchmarking exercise with the United States (Bureau of Labour Statistics) and Canada

I. Background Important notes: All possible future changes in the legislation should have limited impact on response burden in general (both response units and NSI's) Changes in the legislation to take place in mid- to long term (5-7 years minimum)

II. Main Scenarios – initial proposals 3 possible scenarios developed by Eurostat for each dataset (SES, LCS, LCI and JVS): Scenario 1 - fine tuning of the current requirements Scenario 2 - moderate changes Scenario 3 - complete recast

III. LAMAS consultation Scope: LAMAS delegates from Member States 22 countries answered, namely: BG, EE, RO, IE, SI, PT, BE, LU, SK, ES, CY, CZ, FI, LV, AT, HU, NL, DE, FR, PL, DK and LT This presentation focuses on the scenarios that would represent a change compared with the current situation

IV. Timetable 10-11 October 2018: LAMAS-LMI provides guidance on the main scenarios to be further explored by TF 'LMI Review' 13-14 February 2019: TF 'LMI Review' meets for the second time October 2019: LAMAS-LMI discusses the final report submitted by TF 'LMI Review'

SES-scenario 1 SES S1.C1: statistical unit = local unit (observation unit) SES S1.C2: NACE Rev. 2 section O mandatory C1: In fact ES is in favour of investigating (see comments) C2: in fact all countries are in favour of investigating (see comments)

SES-scenario 2 SES S2.C1: small units (1+) mandatory SES S2.C4: timeliness = T+15 months C1: BG, EE, LV, LT in favour of investigating C4: BG in favour of investigating

SES-scenario 3: SES S3.C3: statistical unit = local kind of activity unit (LKAU) SES S3.C4: frequency = annual SES S3.C5: reference month = February or April [instead of OCT] SES S3.C6: timeliness = T+11 months C3: support from AT C5: support from NL

Proposals for SES (to be / not to be investigated): SES S1.C1: statistical unit = local unit (observation unit) SES S1.C2: NACE Rev. 2 section O mandatory SES S2.C1: small units (1+) mandatory SES S2.C4: timeliness = T+15 months SES S3.C3: statistical unit = local kind of activity unit (LKAU) SES S3.C4: frequency = annual SES S3.C5: reference month = February or April [instead of OCT] SES S2.C6: timeliness = T+11 months

LCS-scenario 1: LCS S1.C1: statistical unit = local unit (observation unit) LCS S1.C2: NACE Rev. 2 section O mandatory C1: ES in favour (see comments) C2: EE, LV, LT in favour (see comments)

LCS-scenario 2: LCS S2.C1: small units (1+) mandatory LCS S2.C4: timeliness = T+15 months C1: In fact BG, EE, LV, NL, LT in favour C4: EE, LV, LT in favour

Proposals for LCS (to be / not to be investigated): LCS S1.C1: statistical unit = local unit (observation unit) LCS S1.C2: NACE Rev. 2 section O mandatory LCS S2.C1: small units (1+) mandatory LCS S2.C4: timeliness = T+15 months

LCI-scenario 1: LCI S1.C1: statistical unit = enterprise (local unit accepted) LCI S1.C3: timeliness = T+60 days [currently T+70 days]

LCI-scenario 2: LCI S2.C1: timeliness = T+65 days [for small countries + full breakdown for all countries] and T+45 days ['flash' - for large countries, only total economy without NACE breakdown] LCI S2.C2: variables = TXB still optional but hours worked made mandatory C1: in fact SI, LU (+ may be DK) should be in favour as not concerned. DE opposes to t+65 => t+70 in the final proposal + FR in favour C2: EE in favour finally (see comments)

LCI-scenario 3: LCI S3.C1: statistical unit = kind of activity unit (KAU) LCI S3.C2: variables = both TXB and hours worked made mandatory C2: EE in favour finally (see comments). Support from PT.

Proposals for LCI (to be / not to be investigated): LCI S1.C1: statistical unit = enterprise (local unit accepted) LCI S1.C3: timeliness = T+60 days [currently T+70 days] LCI S2.C1: timeliness = T+65 days [for small countries + full breakdown for all countries] and T+45 days ['flash' - for large countries, only total economy without NACE breakdown] LCI S2.C2: variables = TXB still optional but hours worked made mandatory LCI S3.C1: statistical unit = kind of activity unit (KAU) LCI S3.C2: variables = both TXB and hours worked made mandatory

JVS-scenario 1: JVS S1.C1: statistical unit = enterprise (local unit accepted) JVS S1.C2: NACE sections O, P, Q, R and S ('public sector') made mandatory for all countries (including DK, FR and IT ) JVS S1.C3: size of a statistical unit = 1+ as mandatory for all countries (including FR, IT and MT ) C1: EE in favour finally (see comments) C2: EE, LV, LT, NL in favour (not concerned). FR, DK strongly against. C3: EE, LV, LT, NL in favour (not concerned). FR, DK strongly against. Support from ES, AT, PL

JVS-scenario 2: JVS S2.C1: breakdown by ISCO 2 digits = mandatory for 1 quarter per year JVS S2.C2: breakdown by NUTS 1 = mandatory for 1 quarter per year JVS S2.C3: statistical unit = local unit C1, C2: Support PL.

Proposals for JVS (to be / not to be investigated): JVS S1.C1: statistical unit = enterprise (local unit accepted) JVS S1.C2: NACE sections O, P, Q, R and S ('public sector') made mandatory for all countries (including DK, FR and IT ) JVS S1.C3: size of a statistical unit = 1+ as mandatory for all countries (including FR, IT and MT) JVS S2.C1: breakdown by ISCO 2 digits = mandatory for 1 quarter per year JVS S2.C2: breakdown by NUTS 1 = mandatory for 1 quarter per year JVS S2.C3: statistical unit = local unit S2.C1 & S2.C2: alternative sources to be explored at EU level (EURES)

V. Proposal LAMAS is invited: To take note of the work carried out so far by the TF 'LMI Review' and of its need for guidance from LAMAS on the main options to be examined in its further work; To take a forward-looking approach as the revised LMI legal basis is to be implemented in 5 years minimum; To endorse the timetable proposed To select the scenarios/components to be further investigated by TF

Thank you for your attention!