Tasks, Responsibilities Expectations and Needs

Slides:



Advertisements
Similar presentations
Tom Powers Practical Aspects of SRF Cavity Testing and Operations SRF Workshop 2011 Tutorial Session.
Advertisements

ESS – SPL Collaboration Meeting Infrastructure at ESS Report on WP3 J. Eguia, Fundación TEKNIKER ESS – SPL, Lund, 1st of July 2010.
Stimulating a discussion on cavity performance metrics.
They also develop power- using machines such as refrigeration and air- conditioning equipment, machine tools, material handling systems, elevators and.
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
SRF Cryomodules November 2013 Meeting
Lali Tchelidze Safety work package leader
Discussion on Studies at Test Stands Roger Ruber Uppsala University.
HL-LHC Standards and Best Practices Workshop (11-13 June 2014)
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
SLHC Introduction to the “Workshop on Cryogenics and Vacuum Sectorization of the SPL” R. Garoby – 9/11/2009.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
Preliminary Functional Analysis of ESS Superconducting Radio-Frequency Linac C. Darve, N. Elias, J. Fydrych, D. Piso European Spallation Source ESS AB,
Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
HIE-ISOLDE Project: Planning & Resources Y. Kadi (EN-HDO) and the HIE-ISOLDE Project team.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
C. Darve / Technical Board – December 13 th, 2012Preliminary pressure vessel code requirements Preliminary pressure vessel code requirements Technical.
ESS Cryomodule Status Meeting – Elements of Safety | | Christine Darve Elements of Safety Applicable to the ESS 2013 January, 9 th Christine.
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Steps towards beam commissioning: RF system group Paolo Craievich :: RF Section :: Paul Scherrer Institut SwissFEL.
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
MMT Retreat Technical Services across ESS Peter Rådahl
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Mechanical Engineers immigrate to Australia and Canada The Mechanical engineers have a high demand in countries like Australia and Canada. The qualified.
ESS Program Plan and Schedule Update
CMS Centre Project - Green Light Meeting
Cryoplant Controls Installation
I. Bergevoet - Training preparation
Cryomodule test stand at ESS site
Plans towards CC in the LHC a US – centric perspective
WP5 Elliptical cavities
Uppsala Commitment to ESS and FREIA Planning
Complementary ISTC Projects #3888, 3889p
June 22, 2017 Burkhard Schmidt for the DT coordination team
WG-1 Session Cavity Performance Cryomodule Performance
Safety for the FCC Conceptual Design Report
HL-LHC-UK: UK contribution to HL-LHC Crab Cavities and evolution
Hosting Orsay Walid KAABI
Test stand preparation and EMR "live" data summaries
Session Ic “Energy efficiency/recovery/optimization”
Mauro Morandin & Antoine Daël
ESS RF Development at Uppsala University
UK RFD Pre-Series cryomodule
Beam Dump outline work plan (UK perspective)
HIE-ISOLDE Project: Planning & Resources
recent activities our company Jean Claude Le Scornet - Tomas JUNQUERA
HIE-LINAC status report
Report on HIE-ISOLDE Status
CERN’s MidTermPlan and the consequences for HIE-ISOLDE
ILC Cryogenics -- Technical Design Report Planning
2019 Safety Group 1 – 5 Year Program Timeline Guide
Installation Binder / IRR – an example
Objectives To gain a basic understanding of the Engineering and Technology Pathway. To discover career options available within the Engineering and Technology.
Ciprian Plostinar Workshop on Testing and Commissioning
Daresbury ESS In-Kind Contributions
Licensing requirements for Cryomodules
Relevant Management System & Declaration of Conformity EU compliance
Safety Readiness Review (SRR) Thomas Hansson, ESH
How Do We Define Acceptance of a Cryomodule? - A Discussion
High Level Readiness Reviews
Status & Schedule for ESS TS2
2012 Safety Group 1 – 5 Year Program Timeline Guide
Accelerator Installation Schedule
SNS-PPU upgrades the existing accelerator structure
Conceptual design of the Cryogenic System of Comprehensive Research Facility for Key Fusion Reactor Core Systems Liangbing Hu Sep.4.
East Hall under construction
General Overview of WP 12 ESS Vacuum System
CryoModule Calibration & Measurements Configuration Management Tools (CMCMCMT) aka CM3T because no one came up with a better name Nuno Elias, Paolo.
Presentation transcript:

Tasks, Responsibilities Expectations and Needs Nuno ELIAS Mechanical Engineering and Technology (MET) Workshop: Session 2 www.europeanspallationsource.se 22 May, 2019

Who is Nuno ELIAS Design Engineer Cryogenics Mechanical Engineer See next slides Design Engineer Cryogenics ESS - EIS Operation, maintenance and upgrade of the Helium-3 gas system. Consultancy in Computational Fluid Dynamics simulations and analysis of results. Consultancy in general mechanics. Training and supervision of operators. Mechanical Engineer CERN - CAST Experiment Design of Superconducting magnets and structural optimization. Development of fabrication processes for High Field Magnets. Applied Fellow CERN - Technology Department Design of a Cryogenic Gas System for the CAST experiment. Simulation, Construction, Test and Commissioning. Training of personnel and gas system operation for Physics exploitation. Doctoral Student CERN - Cryolab PhD in Technological Physics Engineering Technical University of Lisbon Design and Specification of Cooling systems for the ATLAS particle detector. Test and Simulation of Cooling systems. CERN – ATLAS Detector Design of Heating, Ventilation and Air Conditioning Systems (HVAC). Project Engineer EACE S.A. Design, evaluation and feasibility studies of Cogeneration Power Plants. Powertechnics Portugal S.A. Specialization: Applied Thermodynamics MSc in Mechanical Engineering 2013(Jan) to date 2011(Jul) 2012(Dec) 2008(May) 2010(Nov) 2005(Jan) 2008(Apr) 2002(Apr) 2004(Dec) 2001(Nov) 2002(Mar) 2000(Jan) 2001(Jul) 1996(Jul) 1999(Dec)

ESS Superconducting LINAC

Cavities and Cryomodules

Design & Specification Cryomodule wildlife Paolo Pierini (SL) Christine Darve (WP_L) Nuno Elias Cecilia Maiano Felix Schlander Frederik Håkansson Saeid Pirani Design & Specification Insulating Vacuum Beam Vacuum Support System Manufacture Beam Physics Alignment System Control System Installation SRF Cavity Cryogenics Transport System Water Cooling System Risks & Safety Testing SRF Tuning System RFDS/ RFS Commissioning LLRF Operation

Roles and Responsibilities Lead activities for Cryomodule Disciplines Cryogenics, Vacuum , Water Cooling, Control Support WP4 and WP5 related activities Design Integration Interfacing with in-house WPs and Groups Controls and Operation Lead activities related to Cryomodule Operation and Control Interface with ICS . Safety and Risk Identify and Report technical risks Provide expertise for risk mitigation Planning and Coordination Master and revise activities plan of relevant IKP Cryomodule Testing, Installation and Commissioning Define test plan, installation plan and commissioning activities

Expectations and Needs Communication forum amongst Engineers Common problems, various approaches, best solution! Well defined engineering processes Keep it simple and everyone updated Training to develop and improve engineering skills Personally tailored, Project oriented. Detailed engineering design to support activities.