Always use fit for purpose lifting accessories

Slides:



Advertisements
Similar presentations
Always ensure travelling block is stationary during DM changeover
Advertisements

Never place yourself in line of fire
PDO Second Alert Date: Incident title: Fall from Height
PDO Second Alert Stay out of the line of fire What happened:
Do not work at height without fall protection
Always wear fall protection equipment when working at height
PDO Second Alert What happened? Your learning from this incident..
Always use the right equipment for the task !!!!
Ensure OHL Clearance required for your lifting activity
No hands on elevator while delivering pipe
PDO Second Alert What happened? Your learning from this incident..
Never put your Hands in line of fire
Always stay out of the line of fire
Photo explaining what was done wrong
Always ensure straight lifting
Safety Critical Devices can Save the Lives & Protect Asset
PDO Second Alert Use Hands Free Lifting Aids What happened?
Always report Near Misses
Always use secondary retention
PDO Second Alert Date: Incident title: HiPo What happened?
Always stay away from line of fire
PDO Second Alert What happened? Your learning from this incident..
PDO Second Alert Date: Incident title: HiPo What happened?
Always ensure “no go” zone are in place
PDO Second Alert Photo explaining what was done wrong
Confidential - Not to be shared outside of PDO/PDO contractors
Seek assistance of Banksman while reversing the vehicle
Always follow defensive driving techniques
Always intervene an unsafe act
Always get authorization before starting any job!
PLAN AND DOCUMENT CHANGES TO THE OPERATION
Always keep your hands and fingers away from the Line of Fire
Confidential - Not to be shared outside of PDO/PDO contractors
Effective communication prevents incidents
Confidential - Not to be shared outside of PDO/PDO contractors
Always isolate equipment before beginning maintenance tasks
Check Level Setup prior Lifting & Lowering Operation
Keep clear of any rope under tension
Stay away from line of fire
Always use a banksman with reversing
PDO Second Alert What happened? Your learning from this incident..
Use a tool and protect your hands
Always ensure MOC is used when making changes to equipment setup
Always ensure protective guards are in place
Always adhere to Red/No Go zones
Do not drive underneath overhead lines without permission.
Keep away from “Line of Fire”
Always verify isolation before starting any electrical job!
Confidential - Not to be shared outside of PDO/PDO contractors
Your safety should always be built on SOLID ground
Use clamps instead of bands to secure ESP cable on the tubing
Always be alert and operate drilling hoisting equipment at safe speed.
Vehicles to Keep Safe Distance at all times
Maintain communication between peers
Drive as per the road condition
Do Not Start Any journey without proper driving training.
Confidential - Not to be shared outside of PDO/PDO contractors
Always position the crane boom correctly before slinging the casing
Always check your surroundings while working in the yard.
Driving rules are for saving lives – adhere to it always
Always follow NORM protocol!
If you feel tired, STOP and take rest
Carillion Alawi LLC, Incident Type LTI No, 16/12/18
Always assess your position and be away from “Line Of Fire”
Confidential - Not to be shared outside of PDO/PDO contractors
Keep away from the line of fire
Confidential - Not to be shared outside of PDO/PDO contractors
Only overtake when safe to do so
Confidential - Not to be shared outside of PDO/PDO contractors
Slow down and always drive to the conditions of the road.
Presentation transcript:

Always use fit for purpose lifting accessories PDO Second Alert Date: 21.09.2018 Incident type: HiPo DROPS What happened? Crane was used to support the monkey board, allowing removal of the supporting beams. While slacking the rope to lower the top side of the second supporting beam, the rope snapped causing the beam to fall on mast ladder cage and hit the top right corner of crane cabin. There was no injury to personnel, but crane top glass was broken. Your learning from this incident.. Always use fit for purpose lifting accessories. Always ensure all DROP Zones are communicated & cleared to avoid Standing in Line of Fire. Always ensure all potential DROPs objects have secondary retention and are recorded in the DROPs Register. Ensure mast lowering checklist covers all steps related to monkey board. Ensure all dates and titles are input A short description should be provided without mentioning names of contractors or individuals. You should include, what happened, to who (by job title) and what injuries this resulted in. Nothing more! Four to five bullet points highlighting the main findings from the investigation. Remember the target audience is the front line staff so this should be written in simple terms in a way that everyone can understand. The strap line should be the main point you want to get across The images should be self explanatory, what went wrong (if you create a reconstruction please ensure you do not put people at risk) and below how it should be done. Always use fit for purpose lifting accessories Confidential - Not to be shared outside of PDO/PDO contractors

Confidential - Not to be shared outside of PDO/PDO contractors Management self audit Date: 21.09.18 Incident: Near Miss Hi-Po DROPS As a learning from this incident and to ensure continual improvement all contract managers must review their HSE HEMP against the questions asked below Confirm the following: Do you ensure DROPS Zones known and Controlled ? Do you review all HEMPs and Procedure at least once a year? Do you ensure all equipment removed from height have proper retention and lifting means ? Do you ensure correct lifting accessories are used for the activity performed ? Do you ensure that procedure provided and effectively communicated to all involved in the task? Do you audit periodically audit rig move process? * If the answer is NO to any of the above questions please ensure you take action to correct this finding. Ensure all dates and titles are input Make a list of closed questions (only ‘yes’ or ‘no’ as an answer) to ask others if they have the same issues based on the management or HSE-MS failings or shortfalls identified in the investigation. Imagine you have to audit other companies to see if they could have the same issues. These questions should start with: Do you ensure…………………? Confidential - Not to be shared outside of PDO/PDO contractors