2008 S P A R C e-beam meas. A. Cianchi e-beam sim. C. Ronsivalle

Slides:



Advertisements
Similar presentations
Status of the SPARC project
Advertisements

SEEDING EXPERIMENTS AT SPARC Luca Giannessi ENEA C.R. Frascati On behalf of the SPARC collaboration International Conference on Charged and Neutral Particles.
1 A Free Electron Laser Project at LNF Massimo Ferrario INFN - LNF & the SPARC/X Team Catania 30 Marzo – 2 Aprile 2005.
DA  NEUpgrade Status DA  NE Upgrade Status David Alesini, LNF-INFN For the DA  NE Upgrade and Commissioning Team (*) (*) David Alesini, Maria Enrica.
Accelerator M. Biagini, LNF-INFN on behalf of the SuperB & DA  NE Teams 3 rd International Workshop on "B Factories and New Measurements" Atami, Jan.
Crab-Waist experiment results The 40th ICFA Advanced Beam Dynamics Workshop on High Luminosity e + e – Factories, April 14–16, 2008 Budker Institute of.
LTU & Electron Beam Dump Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Technical Design.
Super-B Accelerator R&D J. Seeman With contributions from the Super-B Staff September 17, 2009.
CV Pathology Lab 3 CASE 1. CV Lab 3, Image IA CV Lab 3, Image 1B.
Scientific Goals: V. Litvinenko’s RHIC retreat talk Commissioning Goals: I. Pinayev presentation last week Run 14 Goals: Complete assembly of 112 MHz SCRF.
Laser pulse shaping for high- brightness photoinjector Carlo Vicario for SPARC collaboration.
EuroNNAc Workshop, CERN, May 2011 External Injection at INFN-LNF ( integrating RF photo-injectors with LWFA ) Luca Serafini - INFN/Milano High Brightness.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
Contributions to ELI-NP on RF accelerator activities Andrea Mostacci Università di Roma, Sapienza The joint Sapienza/INFN-LNF group is active in the field.
Chia Laguna - Sardinia July 1-6, 2002 ICFA Workshop on “ The Physics & Applications of High Brightness Beams ” New Perspectives and Programs in Italy for.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
1)DA  NE 2)Synchrotron Light 3)Electron Beams 4)Free Electron Lasers 5)Detector R&D 6)CNAO-Hadrontherapy 7)Particle acceleration 8)Future programs INFN-LNF.
David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 1 Undulator Complex Status LCLS Introduction.
LCLS Accelerator SLAC linac tunnel research yard Linac-0 L =6 m Linac-1 L  9 m  rf   25° Linac-2 L  330 m  rf   41° Linac-3 L  550 m  rf  0°
PROPOSAL G.I.A.F. (HYBRID GUN AT HIGH FREQUENCY) INFN-LNF – UNIVERSITY OF ROME “LA SAPIENZA”- UCLA D. Alesini (T), M. Ferrario (R), A. Gallo (T),
DA  NE Status Report C. Milardi, D. Alesini, M.E. Biagini, C. Biscari, R. Boni, M. Boscolo, B. Buonomo, A. Clozza, G. Delle Monache, E. Di Pasquale, G.
1 Short Electron Pulses from RF Photoinjectors Massimo Ferrario INFN - LNF.
ELI Nuclear Physics (Romania) 1 Laser-Induced Photonuclear Physics nuclear physics methods to study laser-target interactions, new nuclear spectroscopy,
A New Technology based on clamping for High Gradient Radiofrequency Photogun David Alesini LNF-INFN, Frascati, Rome, Italy September 2015 La Biodola,
A. Cianchi University of Rome Tor Vergata and INFN on behalf of SPARC Lab Diagnostic group 1.
From SPARC to SPARX Luigi Palumbo SPARC Review Committee, January 9, 2008.
SPARC Program Advisory Committee 22 Oct 2013 Dennis T. Palmer, INFN-Milano STAR: Southern Europe Thomson back-scattering source for Applied Research.
Alignment & Vibration Issues for SuperB M. Esposito, S. Tomassini, INFN-LNF SuperB Workshop – SLAC – October 7th, 2009.
ELI-NP meeting, Magurele, Aug. 18th 2011 INFN Proposal for ELI-NP Compton Gamma-ray Source Luca Serafini – INFN Spokeperson for ELI-NP Motivations for.
CRYO 1.5 GeV 1.5 GeV 3 GeV n I R I D E is a large infrastructure for fundamental and applied physics research. Conceived as an innovative and evolutionary.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
Advanced beam dynamics experiments at SPARC Alberto Bacci on be half the SPARC group PITZ Collaboration meeting, October 2011, Zeuthen (Berlin)
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
V Review SPARC Diagnostic & Control Status G. Di Pirro On behalf control and diagnostic group.
3rd LI2FE Meeting, INFN-LNF, 11/3/2010 LI 2 FE Laboratorio Integrato Interdisciplinare con Fotoni ed Elettroni Luca Serafini - INFN/MI on behalf of LI.
TERASPARC: Terahertz the Free-Electron Laser Stefano Lupi (on behalf of the TERASPARC team) Dipartimento di Fisica, Sapienza Università di.
Status of the SPARC laser and “dazzler” experiments
FLAME, STATO DEL COMMISSIONING E SELF-INJECTION TEST EXPERIMENT
Accelerator Division Activities
Diagnostic & Control Status
Super-B Accelerator Status
(LNF-INFN, Frascati, Italy)
RF Synchronization Activity
Leonida A. GIZZI Istituto Nazionale di Ottica, CNR, Pisa, Italy
Status of the Thomson Source
Status and Interest of the X-ray FEL SINAP
by P. Musumeci and F.Tazzioli
SPARC Review Committee L. Palumbo -RomaTV-Oct.04.04
SPARC Review Committee Meeting
Design of an ECHO-seeded FEL at nm wavelength
SPARC RF gun status by P. Musumeci Review committee
Tango status at Elettra
XFEL Vacuum System Commissioning
WP 9: Beam-driven plasma acc.
Installation status and planning
TERASPARC Characterization of the THz source
Energy up-grading of the SPARC photo-injector, with a C-band RF system
Bubble Chamber Planning Meeting
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
LCLS Commissioning Parameters
Laboratori Nazionali di Frascati
Injector Topics for Discussion
ATF project meeting, Feb KEK, Junji Urakawa Contents :
Linac/BC1 Commissioning P
Design of an ECHO-seeded FEL at nm wavelength
Control System Overview Hamid Shoaee LCLS Control System Manager
Proposal for Smith-Purcell radiation experiment at SPARC_LAB
J. Seeman Perugia Super-B Meeting June 2009
Proposal for the DAFNE Variable Energy Design Study
Presentation transcript:

2008 S P A R C e-beam meas. A. Cianchi e-beam sim. C. Ronsivalle exp. data analys A. Mostacci Laser System C. Vicario Linac R. Boni Cathodes L. Cultrera RF Contr. & Synch. A. Gallo Gun & RF Def. D. Alesini Magn Power Supply G.Gatti Magnets Design G. Gatti Instr. diagn. D. Filippetto Controls, Data log E. Pace Vacuum A. Clozza Fluids L. Pellegrino Layout: S. Tomassini Convent. Safety S. Vescovi Radiation Prot. A. Esposito Area Safety Resp. G. Di Pirro National Resp. : L. Palumbo LNF Resp: M. Ferrario MI Resp: L. Serafini Roma2 Resp: L. Catani Lecce Resp: W. Perrone Roma1 Resp: M. Mattioli Scientific Coord: L. Serafini Commiss Coord. M. Ferrario Installation Coord: G. Di Pirro Technical Coord: C. Sanelli Mech. & Align: F. Sgamma RF-X Develop. B. Spataro dog leg. C. Vaccarezza Timing A. Drago S P A R C Photon beam E. Chiadroni Seeding L. Giannessi 2008 Steering Committee Review Committee Documentation M. Migliorati

IRUVX-FEL - L.Palumbo/M. Ferrario ESGARD - A. Ghigo ELI - G. Dipirro REVIEW COMMITTEE R. Battiston D. Trines W. Scandale STEERING COMMITTEE R. Boni M. Castellano L. Catani A. Clozza G. Dipirro M. Ferrario Ghigo Giannessi L. Palumbo M. Preger C. Sanelli L. Serafini Sgamma C. Vaccarezza DOCUMENTION M. Migliorati Calibrazioni L. Cultrera Installazioni G. Dipirro Operazioni A. Cianchi Sicurezze M. Vescovi Mech.Drawings S.Tomassini WEB E. Pace FP7 - EU IRUVX-FEL - L.Palumbo/M. Ferrario ESGARD - A. Ghigo ELI - G. Dipirro I3-IA-SFS .

Review Committee 17.7.07 c/o ENEA 9.00 Introduction L.P. 9.10 Results of Gun ….. D.F. 9.40 Installation Status and planning G.DP 10.00 SPARC Phase II C.V. 10.30 SPARX status L.P. 11.00 Coffee Break 11.15 Undulators 11.45 Quadrupoles 12.00 Seeding 12.30 Visit to FATA lab 13.00 Lunch 14.40 Visit SPARC-lab