XYZ Port Facility Maritime Security Drill Briefing for Controllers date
Contiguous Zone Security – Personnel Persons Loitering Outside the Port Facility Drill D211
Scope Date, time, location Aim Objectives Desired outcomes Controllers Players Materials Scenario Master Events List Controller Tasks Communications Safety Debrief
Drill number: X/XX Date: Start Time: Location: Estimated End Time:
Aim To enhance the proficiency of port facility security staff in monitoring the contiguous zone of the port facility.
Objectives Security staff required to notice the suspicious person within the required time as stated in the PFSP. Security staff required to handle the suspicious person according to procedures in the PFSP.
Desired outcomes Security staff will be able to: Effectively monitor the contiguous zone. Take the necessary actions to deal with suspicious individuals in the contiguous zone. Deter suspicious individuals from loitering in the contiguous zone.
Control Team Chief Controller: PFSO, Mr. AAA Simulators Intruder 1 – Mr. XXX Intruder 2 – Mr. YYY
Players Security staff on duty
Materials Camera with telephoto lens
Scenario A syndicate plans to use port facilities as a conduit for smuggling contrabands. Syndicate members have been tasked to probe various port facilities in the region in order to determine the effectiveness of the security.
Master Events List S/N Time Event From To Means of Delivery Expected Response Remarks 001 0900 All participants in position 002 0905 Drill commence Chief Controller All Walkie Talkie None “Drill Start” 003 0915 Walk along perimeter, stopping at various locations and entrances. Potential intruders Security Staff Walk around port facility Did the security staff notice the suspicious activities? Discuss and point observe people & vehicles, take photos 004 1030 Attempt to scale the outer perimeter fence or wall. Respond to attempted intrusion Isolated location. Depart after 5 minutes 005 1100 Drill completed Dispersal of personnel/ equipment “Drill End” 006 1130 Hot Wash N/A
Controller Tasks Commencing near one end of the Port Facility entrance, the intruders are to walk slowly around the perimeter Pause frequently to chat, take photo and look towards installations in the Port Facility Loiter at entrances to the Port Facility, take photos
Controller Tasks Do not make any attempt to conceal yourselves Be prepared for intervention by security forces Carry the “Letter of Identification” and tender it if harassed
Communications Mobile phone Walkie-Talkie Player – Ch YY Controllers – Ch ZZ
Code words Drill Start The drill is to commence Drill Suspend The drill is temporarily suspended Drill Go The drill is to resume from where it was suspended Drill Stop The drill is to be terminated (prematurely) Drill End The drill is completed Drill, Drill, Drill The message or statement that follows this preamble relates to the drill only, and is not to be confused with real activity
Safety Physical safety of personnel is paramount There is to be no physical contact between player and controllers acting as intruders, etc. Security staff are not to use abusive language when talking to controllers acting as “intruders” Do not neglect the safety of equipment
Debrief Location: Secretary: Attendance
Any questions ?