IEKP - Universität Karlsruhe (TH) Status IQC Karlsruhe IEKP - Universität Karlsruhe (TH) 5/18/2019 Sensor Meeting - TW Sept. 02
W2 & W4 - Wien Sets Fluence: (2.25±0.1)e14 n/cm² [14a LHC] 30220621600105(2), 30220621600116(2), 30220822000111(1), 30220822000120(1) 5/18/2019 Sensor Meeting - TW Sept. 02
Sensor Meeting - TW Sept. 02 CV W4 W3 5/18/2019 Sensor Meeting - TW Sept. 02
Sensor Meeting - TW Sept. 02 IV 5/18/2019 Sensor Meeting - TW Sept. 02
Sensor Meeting - TW Sept. 02 Cint No probe correction ! Flat Cint ramp! 5/18/2019 Sensor Meeting - TW Sept. 02
Sensor Meeting - TW Sept. 02 Rpoly & Ileak -3°C 5/18/2019 Sensor Meeting - TW Sept. 02
Sensor Meeting - TW Sept. 02 Cc, Idiel & Rint 5/18/2019 Sensor Meeting - TW Sept. 02
W3 -KA Set H1 Fluence: (2.25±0.1)e14 n/cm² [14a LHC] 30220722000101, 30220722000103, 30220722000205 5/18/2019 Sensor Meeting - TW Sept. 02
Sensor Meeting - TW Sept. 02 CV 5/18/2019 Sensor Meeting - TW Sept. 02
Sensor Meeting - TW Sept. 02 IV 5/18/2019 Sensor Meeting - TW Sept. 02
Sensor Meeting - TW Sept. 02 Cint No probe correction ! Flat Cint ramp! 5/18/2019 Sensor Meeting - TW Sept. 02
Sensor Meeting - TW Sept. 02 Rpoly & Ileak 5/18/2019 Sensor Meeting - TW Sept. 02
Sensor Meeting - TW Sept. 02 Cc, Idiel & Rint 5/18/2019 Sensor Meeting - TW Sept. 02
Sensor Meeting - TW Sept. 02 Summary W2, W3 and W4 teststructures are qualified ! No change of Cint and Cc No developement of pinholes Rint above 200MΩ @ 400V Rpoly seems to be increased Measurement and Ileak correction to be further investigated 5/18/2019 Sensor Meeting - TW Sept. 02
OB2 - Pisa Sets Fluence: (0.7±0.1)e14 n/cm² [ 20a LHC] 30210414735610(12), 30210414735714(8), 30210414739408(25), 30210414842424(16), 30210414842606(15), 30210415060301(18), 30210415061515(24), 30210420275822(17), 30210420275907(19), 30210420279338(26), 30210420383114(23) 5/18/2019 Sensor Meeting - TW Sept. 02
Sensor Meeting - TW Sept. 02 CV HH-model: Udep~310V 5/18/2019 Sensor Meeting - TW Sept. 02
Sensor Meeting - TW Sept. 02 IV 5/18/2019 Sensor Meeting - TW Sept. 02
Sensor Meeting - TW Sept. 02 Cint 5/18/2019 Sensor Meeting - TW Sept. 02
Sensor Meeting - TW Sept. 02 Rpoly & Ileak 5/18/2019 Sensor Meeting - TW Sept. 02
Sensor Meeting - TW Sept. 02 Cc, Idiel & Rint 5/18/2019 Sensor Meeting - TW Sept. 02
Sensor Meeting - TW Sept. 02 Summary Problems with Cint for Pisa set 15 and 16 ! Might be due to high fluence (20 years LHC), but other sensors behave different ! Cint ramps totally different to HPK sensors ! No saturation at small voltages ! 5/18/2019 Sensor Meeting - TW Sept. 02
Sensor Meeting - TW Sept. 02 Outlook IB1 and IB2 already qualified last TW Irradiated sensors: ST-OB2 30210414735908 HPK-W2 30220621600101 Still some irrad. structures to be qualified Prequalification for PG4-6 and Pisa 32-48 done ! Module ready for irradiation Cyclotron closed for maintenance for 4 weeks ! 5/18/2019 Sensor Meeting - TW Sept. 02