IEKP - Universität Karlsruhe (TH)

Slides:



Advertisements
Similar presentations
Combined Measurement Results of dedicated RD50 Charge Multiplication Sensors Christopher Betancourt 2, Tom Barber 2, Gianluigi Casse 1, Paul Dervan 1,
Advertisements

IAP-PAI 25/05/20051 CMS Si Rad. Hardness Introduction Damage in Si Neutron tests => Beam => Irrad. Setup.
IEKP - Universität Karlsruhe (TH) 1 Preliminary Pinhole Studies (not final) F. Hartmann IEKP - Universität Karlsruhe (TH) Creation of defined.
Frank Hartmann IEKP TEC Meeting July 03 Ring 6 mechanical Qualification In a nutshell: rel. precision agreement (Aa-Ka): 3-5µm (  rot.) abs precision.
Irradiation Workshop KarlsruheA. Furgeri 1 Irradiation in Karlsruhe The Karlsruhe-Probestations Procedure of Irradiation Results Future annealing.
Probestation 1: 6“ (200mm * 300mm + 360° rotation + 15mm Z) QTC Instruments: HP4274A (LCR), K6517 (electrometer), HP6614C (voltage supply), K595 (quasistatic.
Frank Hartmann Module Construction Meeting1 Analysis on TEC Expressline II modules Two different topics: Strip defects (3 modules) Global IV (2.
Database entry of irradiation data PROBLEMS New form of DB data One set of data may de-qualify whole batch of sensors  composite of composite action:
Sensor meetingF. Hartmann 1 Status report St & HPK plus add. Scratch tests. IEKP – University of Karlsruhe Frank Hartmann.
October 2001Module Construction meeting IEKP - Universität Karlsruhe (TH) 1 Discussions on validation of irradiated MODULES W. de Boer, F. Hartmann.
Workshop on CMS irradiation sensor Qualification&Assurance 1 Final set of measurement for the irradiation quality assurance. What test do we need? EFFICIENT.
Slide 1CMS Database Issues-Derek BargeDOE review, January 20, 2004 CMS Database Issues Derek Barge.
Sensor meetingA. Furgeri 1 Status report IEKP – University of Karlsruhe Alexander Furgeri.
Irradiation Workshop - KarlsruheA. Dierlamm, IEKP 1 Irradiation with Protons - IQC Karlsruhe IEKP - Universität Karlsruhe (TH)
6/22/2015Tracker Week April 2002IEKP 1 Summary of IQC-workshop IEKP - Universität Karlsruhe (TH)
General Tracker meetingA. Furgeri 1 Irradiation results and Annealing scenarios for HPK IEKP – University of Karlsruhe Alexander Furgeri
October 2001Module Construction meeting IEKP - Universität Karlsruhe (TH) 1 Discussions on validation of irradiated MODULES W. de Boer, F. Hartmann.
Manuel FahrerCMS Week TB Meeting /6 1-Shot Test Beam CERN CMS: M.Huhtinen, R.Hammarstrom, A.Macpherson CERN ATLAS, PS, Karlsruhe CMS  Overview.
DPG 2001 Frank Hartmann (IEKP) P-irradiated-oxygenated Non-irradiated-oxygenated Non-irradiated-non-oxygenated P-irradiated-non-oxygenated sensors put.
First Proton Irradiation of CMS Sensors W. de Boer, A. Dierlamm, A. Furgeri, E. Grigoriev, F. Hartmann, F. Hauler, L. Jungermann, Ch. Piasecki.
1 Irradiation Study of n-on-P Strip Sensors K. Hara, K. Inoue, A. Mochizuki (Univ. of Tsukuba) Y. Unno, S. Terada, T. Kohriki, Y. Ikegami (KEK) K. Yamamura,
Cost Until end 2000:negligible 2001:3 kDM per irrad  Problem –Cyclotron split in commercial and research part. Irradiation facility still a commercial.
Sensor meetingA. Furgeri 1 Status report IEKP – University of Karlsruhe Alexander Furgeri.
March 17, 2003 Catania, Meeting ST - CMS CMS Sensor Quality Frank Hartmann – University of Karlsruhe 1 Summary of Sensor Quality Tests List of Problems.
Frank Hartmann --- Karlsruhe 2 nd bond test 2nd bond test pieces received from institutes sent in their 2nbond sample Torino, Wien, Karlsruhe, FNAL,
Tracker Week April 2002IEKP 1 Irradiation of one CMS ceramic hybrid from Dorazil in Karlsruhe Frank Hartmann IEKP - Universität Karlsruhe (TH)
October 7, 2003 US Silicon Tracker group Sergey Korjenevski University of Rochester 1 Quality Assurance Test Stand University of Rochester oQTC at Rochester,
Database entry of irradiation data PROBLEMS New form of DB data 1. One set of data may de-qualify whole batch of sensors  composite of composite action:
October 2001General Tracker Meeting IEKP - Universität Karlsruhe (TH) 1 Results on proton irradiation tests in Karlsruhe F. Hartmann IEKP - Universität.
ALBA Synchrotron – 17 June 2010 Centro Nacional de MicroelectrónicaInstituto de Microelectrónica de Barcelona First Measurements on 3D Strips Detectors.
CMS Week, CERN, September Sep 2003CMS Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 16 Sep.
Full-size ATLAS Sensor Testing On behalf of the ATLAS R&D group Development of n-in-p Silicon Sensors for very high radiation environment Jan Bohm Institute.
Sergey Korjenevski KSU DØ Run2b Silicon meeting, Oct 10, Preliminary testing results of Elma and HPK sensors Sergey Korjenevski Kansas State University.
Anna Macchiolo, Status of Process Qualification Centers, Sensor Meeting, 31st Oct 2001 Status of Process Qualification Centers Florence, Strasbourg, Vienna.
CMS Sensormeeting : Probestation 1: 6“ (200mm * 300mm + 360° rotation + 15mm Z) Mechanical Assembly ready Instruments: LCR, Electrometer, PS, Quasistatic.
Examples and disciptions for measurements On pixel and strip sensors.
Matthias Bergholz DESY Zeuthen 1 Mpix Sensors.
Testing Site Qualification Purpose: –Perform detailed scans of the silicon microstrips to make sure they all work. –Check HPK. Candidates for Certification:
Update of CMS Process Quality Control Sensor Meeting, CMS TK Week, , CERN Florence Anna Macchiolo Carlo Civinini Mirko Brianzi Strasbourg Jean-Charles.
Sensors Frank Hartmann for the Sensor WG CMS Upgrade Days HPK submission (main current topic) Possible next submission 3D sensors for innermost.
Joachim Erfle Summary of measurements after first irradiation of HPK samples 19 th RD50 Workshop November 2011 CERN Joachim.
Run Iib Workshop Dec 12-13, 2002 Silicon sensors procurement and quality assurance WBS Regina Demina Kansas State University.
Punch through protection and p-stop ion concentration in HPK strip mini-sensors Jan Bohm, Institute of Physics ASCR, Prague Peter Kodys, Pavel Novotny,
KIT – Universität des Landes Baden-Württemberg und nationales Forschungszentrum in der Helmholtz-Gemeinschaft Status Interstrip resistance.
Lyon Gantry Status CERN 15 Sept D. Contardo Calibration Plates and Tools Readiness for production.
Martin Frey, IEKP, Karlsruhe Erkki Anttila, Sandor Czellar, Jaakko Härkönen, Matti Kortelainen, Tapio Lampén, Panja Luukka, Maria Maksimow,
June , RD50 Workshop1 Jan B o hm, Jan Brož, Zdeněk Doležal, Peter Kodyš, Petr Kubík, Marcela Mikeštíková Neutron irradiation program in Prague Charles.
Charge Collection, Power, and Annealing Behaviour of Planar Silicon Detectors after Reactor Neutron, Pion and Proton Doses up to 1.6×10 16 n eq cm -2 A.
Summary of Liverpool CC(V) Measurements A. Affolder, P. Allport, H. Brown, G. Casse, V. Chmill, D. Forshaw, T. Huse, I. Tsurin, M. Wormold University of.
How to design a good sensor? General sensor desing rules Avoid high electric fields Provide good interstrip isolation (high Rint) Avoid signal coupling.
11/05/2011Sensor Meeting, Doris Eckstein Status of Diode Measurements Measurements by:
Tracker Week, CERN, Oct Oct 2003Tracker Week - Bonding WGSalvatore Costa - Catania Which strips should the Bonders skip because of known.
INFN and University of Florence Test Beam Meeting Tracker Week
Karlsruhe probe equipment and QA proposals/expertise
Axel König, HEPHY Vienna
Irradiation test of Commercial (BASLER) digital cameras
Status of PQC Florence, Strasbourg, Vienna
Irradiation and annealing study of 3D p-type strip detectors
INFN and University of Florence Test Beam Meeting Tracker Week
Study of radiation damage induced by 26MeV protons and reactor neutrons on heavily irradiated MCz, FZ and Epi silicon detectors N. Manna Dipartimento.
Study of radiation damage induced by 24/c GeV and 26MeV protons on heavily irradiated MCz and FZ silicon detectors N. Manna Dipartimento Interateneo di.
Status Brussels GANTRY
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
IEKP - Universität Karlsruhe (TH)
FNAL Module Testing Status
TEC Module Production Overview
CORRELATION BETWEEN LEAKAGE CURRENT AND NOISE
Full list of devices of May09
TEC module quality overview
Module Testing Status Week of 3/14-3/18.
Presentation transcript:

IEKP - Universität Karlsruhe (TH) Status IQC Karlsruhe IEKP - Universität Karlsruhe (TH) 5/18/2019 Sensor Meeting - TW Sept. 02

W2 & W4 - Wien Sets Fluence: (2.25±0.1)e14 n/cm² [14a LHC] 30220621600105(2), 30220621600116(2), 30220822000111(1), 30220822000120(1) 5/18/2019 Sensor Meeting - TW Sept. 02

Sensor Meeting - TW Sept. 02 CV W4 W3 5/18/2019 Sensor Meeting - TW Sept. 02

Sensor Meeting - TW Sept. 02 IV 5/18/2019 Sensor Meeting - TW Sept. 02

Sensor Meeting - TW Sept. 02 Cint No probe correction ! Flat Cint ramp! 5/18/2019 Sensor Meeting - TW Sept. 02

Sensor Meeting - TW Sept. 02 Rpoly & Ileak -3°C 5/18/2019 Sensor Meeting - TW Sept. 02

Sensor Meeting - TW Sept. 02 Cc, Idiel & Rint 5/18/2019 Sensor Meeting - TW Sept. 02

W3 -KA Set H1 Fluence: (2.25±0.1)e14 n/cm² [14a LHC] 30220722000101, 30220722000103, 30220722000205 5/18/2019 Sensor Meeting - TW Sept. 02

Sensor Meeting - TW Sept. 02 CV 5/18/2019 Sensor Meeting - TW Sept. 02

Sensor Meeting - TW Sept. 02 IV 5/18/2019 Sensor Meeting - TW Sept. 02

Sensor Meeting - TW Sept. 02 Cint No probe correction ! Flat Cint ramp! 5/18/2019 Sensor Meeting - TW Sept. 02

Sensor Meeting - TW Sept. 02 Rpoly & Ileak 5/18/2019 Sensor Meeting - TW Sept. 02

Sensor Meeting - TW Sept. 02 Cc, Idiel & Rint 5/18/2019 Sensor Meeting - TW Sept. 02

Sensor Meeting - TW Sept. 02 Summary W2, W3 and W4 teststructures are qualified ! No change of Cint and Cc No developement of pinholes Rint above 200MΩ @ 400V Rpoly seems to be increased Measurement and Ileak correction to be further investigated 5/18/2019 Sensor Meeting - TW Sept. 02

OB2 - Pisa Sets Fluence: (0.7±0.1)e14 n/cm² [ 20a LHC] 30210414735610(12), 30210414735714(8), 30210414739408(25), 30210414842424(16), 30210414842606(15), 30210415060301(18), 30210415061515(24), 30210420275822(17), 30210420275907(19), 30210420279338(26), 30210420383114(23) 5/18/2019 Sensor Meeting - TW Sept. 02

Sensor Meeting - TW Sept. 02 CV HH-model: Udep~310V 5/18/2019 Sensor Meeting - TW Sept. 02

Sensor Meeting - TW Sept. 02 IV 5/18/2019 Sensor Meeting - TW Sept. 02

Sensor Meeting - TW Sept. 02 Cint 5/18/2019 Sensor Meeting - TW Sept. 02

Sensor Meeting - TW Sept. 02 Rpoly & Ileak 5/18/2019 Sensor Meeting - TW Sept. 02

Sensor Meeting - TW Sept. 02 Cc, Idiel & Rint 5/18/2019 Sensor Meeting - TW Sept. 02

Sensor Meeting - TW Sept. 02 Summary Problems with Cint for Pisa set 15 and 16 ! Might be due to high fluence (20 years LHC), but other sensors behave different ! Cint ramps totally different to HPK sensors ! No saturation at small voltages ! 5/18/2019 Sensor Meeting - TW Sept. 02

Sensor Meeting - TW Sept. 02 Outlook IB1 and IB2 already qualified last TW Irradiated sensors: ST-OB2 30210414735908 HPK-W2 30220621600101 Still some irrad. structures to be qualified Prequalification for PG4-6 and Pisa 32-48 done ! Module ready for irradiation Cyclotron closed for maintenance for 4 weeks ! 5/18/2019 Sensor Meeting - TW Sept. 02