May 2019 Service Changes Public Information Meetings

Slides:



Advertisements
Similar presentations
Index The Region: Regional Transit West East North West Side Access Downtown: Transit Lines Catchment Areas BACKNEXT INDEXEND Lower Manhattan Transit.
Advertisements

6 th Street Water Main And Street Reconstruction 2013.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &
Presentation Overview Eagle Project Overview Key Participants & Organizational Structure Project Status, Approvals and Schedule Questions? Grandview Landscaping.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Town of Cobourg Division Street Improvements Public Information Centre October 1, 2015 Image Courtesy of Google 2015.
South/West Corridor Transit Improvements ZARZAMORA AND MILITARY PRIMO BRT PROJECTS ENVIRONMENTAL AND PRELIMINARY DESIGN PHASE September 9, 2014 VIA Community.
U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET From South of Smith Street To.
S.R. A1A SIDEWALK PROJECT SR A1A Sidewalk FPID Pre-Design Public Information Meeting July 13, 2011 Presented By: Derek Dixon, FDOT.
A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment.
What is a “no-show”? Contact Us!
Proposed Route Modifications
Commuter Rail Schedule Changes – Proposed – November 21, 2016
Proposal of SERVICE & FARE CHANGES
Closure of S. Lazona Dr. at Main St.
Four Winds Condominium Association August 2, 2017
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Thank you for bringing us to where we are
APTA Sustainability Conference July 2016
WELCOME State Road 50 (Cheney Highway) Overview and Methodology
BELLE TERRE BLVD/PKWY CORRIDOR COMMUNITY DEVELOPMENT DEPARTMENT
The Oakton Condominium Association September 12, 2017
CET Service Proposal.
City of Beaumont SHORT RANGE TRANSIT PLAN FY 2014/15 - FY 2016/17
WNY - PLACES OF INTEREST
Traveling Outside Los Angeles County with ADA Paratransit
SR 60/Kennedy Boulevard and Jackson Street Resurfacing Projects
Propose March 2018 Service Improvements
Propose March 2018 Service Improvements
Proposal of SERVICE & FARE CHANGES
Arizona Conference on Roads and Streets Multimodal Cities: Addressing Issues in Transit Corridors March 24, 2016.
An update on the Service Change proposal
Comprehensive Operational Analysis (COA)
Parking & Traffic Control
Transportation and Parking Services
Citrus Park Drive Extension
9th & Colorado Redevelopment Impacts Denver Public Works - Traffic Safety recommendations Community feedback Survey Results Conducted by: Colorado.
Proposed Service Changes
Quarterly Transportation Report 4th Quarter 2011 October 11, 2011
Regional Transit Service Transportation Services Overview School of the Arts School Year August 2018.
D Line Station Plan Overview
APTA Sustainability Conference July 2016
PROJ. 566(17) LOR PID MAJOR WIDENING
Coffee & Construction Developer Meeting
Contract 60X10 Informational Meeting Weber I-55
D-LINK Overview Hans-Michael Ruthe April 19, 2018.
ELEVATOR CLOSURES: JANUARY-FEBRUARY 2019
Comprehensive Transportation Plan
St. James School and Formation Center Future Parking
PUBLIC HEARING S.R. 30 (U.S. 98 Business/West Garden Street)
2040 Regional Transportation Plan Sparks Citizens Advisory Board
M14A/D Select Bus Service
Red Line/HealthLine Extension Major
Villa Mediterránea Season Nightly Rate Weekly Rate Minimum Stay
Harbour Island Force Main Replacement
May 2019 Service Changes Public Information Meetings
1. Where should buses run and with what frequency?
S.R. 261 Intersection Improvement at Fruitwood Lane in Newburgh
RTC RIDE Service Improvement Recommendations
Metropolitan District | mndot.gov
Reimagine RTS Public Hearing
Project Location. Cambridge/Arlington Intersection Reconstruction Public Information Meeting June 16, 2015.
September 2019 Proposed Service Changes Public Comment Meetings
Draft Fiscal Year Bus Service Plan
September 2019 Service Changes Public Information Meetings
National Organization of Minority Engineers Leadership Summit
January 2020 Proposed Service Changes Public Comment Meetings
Regional Transit Service Transportation Services Overview School of the Arts School Year August 2019.
State Route 55 Improvement Project from Interstate 5 to State Route 91
Presentation transcript:

May 2019 Service Changes Public Information Meetings April 11 & 16, 2019

MEETING PURPOSE Thank you for joining us and participating in this community discussion. The purpose of this meeting is to provide information on the service changes that will take effect on Monday, May 6, 2019. Public comment meetings were held on January 17 & 24.

MEETING FORMAT Be considerate of meeting attendees and COTA staff. Please silence cell phones and other technology. Participants are encouraged to complete comment cards. Please print clearly. Following the presentation, staff will be available at each table to take your comments or feedback.

SERVICE CHANGE SCHEDULE COTA modifies service three times per year – the first Monday of: January May September May 2019 changes will begin on: Monday, May 6, 2019

May 2019 Service Changes Bus Schedule changes

Bus Schedule Changes Goal: Improve on-time performance by adjusting scheduled stop arrival and departure times on the following bus lines: Frequent Lines 5 W. 5th Ave./Refugee (Weekday) Rush Hour (Weekday) Line 13 Arlington/1st Line 41 Crosswoods-Polaris Line 45 New Albany Standard Lines 3 Northwest/Harrisburg (Saturday) 9 W. Mound/Brentnell (Sunday) 22 OSU-Rickenbacker (Weekday) 25 Brice (All Days) 31 Hudson (All Days) Line 102 (formerly 2L) Polaris/N. High (All Days) 6

May 2019 Service Changes Seasonal service

Zoo bus 2019 Goal: Provide direct and convenient bus service between Columbus Zoo & Aquarium and Downtown Columbus for visitors and workers. Saturday, May 11: Weekend-only service begins Monday, May 27 (Memorial Day): first weekday of service operates on Holiday/Sunday schedule Tuesday, May 28 through Monday, Sept. 2 (Labor Day): Operates 7 days a week Operates Holiday/Sunday schedule on Memorial Day, July 4th, & Labor Day 8

May 2019 Service Changes Line renaming

What is a Limited Stop bus line? Line Renamed: 2L changed to 102 Polaris pkwy/ n. high Goal: Reduce confusion between Line 2 and Line 2L and help riders better understand the nature of Limited Stop bus lines. Beginning May 6th: “Line 2L N. High/Polaris Pkwy” will be renamed “Line 102 Polaris Pkwy/ N. High” What is a Limited Stop bus line? Limited stop bus lines skip stops for faster service. Only select stops shown on the schedule brochure are served. CMAX and Line 102 (formerly 2L) are COTA’s limited stop bus lines. 10

May 2019 Service Changes Route changes

Changed end of line downtown: CMAX & Line 7 Goal: Change end of line for Line 7 and CMAX as result of new Mound Street streetscape in downtown Columbus. New downtown routing: Regular route to eastbound on E. Main Street Turn Right on S. 5th Street (instead of Grant Avenue) Turn Right on E. Mound Street End of Line: E. Mound at S. 4th Street (across the street from Columbus Downtown High School) 12

Changed end of line downtown: CMAX & Line 7 13

Changed end of line downtown: CMAX & Line 7 Bus Stop Changes CMAX will no longer serve: Stop 7400: E. Mound & S. 5th Street Line 7 will no longer serve: Stop 1347: E. Main & S. 5th Street Stop 7540: S. Grant & E. Mound Street New CMAX & Line 7 End of Line Stop: Stop 5138: New stop on E. Mound at S. 4th Street (Across the street from Columbus Downtown High School) 14

Temporary end of line: Line 22 in Grandview yard Goal: Maintain service to southeast Grandview Heights during construction on Bobcat Avenue in Grandview Yard. Temporary Line 22 route: South on Bobcat Avenue Right on W. 1st Avenue Left on Northwest Boulevard End of Line at new stop on Northwest at 1st Avenue Continue on Northwest Boulevard, then left on Williams Avenue Left on Bobcat Avenue, continue north to existing route Southern two stops closed during construction to everything 15

Long-term end of line: LINE 22 in Grandview yard Goal: Keep convenient transit service to Grandview Yard while being good neighbors to area residents. New Line 22 route expected to begin on May 6th: South on Bobcat Avenue Left on Williams Avenue Right on Rail St. to End of Line Continue south on Rail Street Right on Goodale Boulevard Right on Bobcat Street and continue north over existing route Southern two stops closed during construction to everything 16

Temporary end of line: Line 31 in Grandview Yard Goal: Maintain service to southeast Grandview Heights during construction on Bobcat Avenue in Grandview Yard. Temporary Line 31 route: Right on Northwest Boulevard End of Line at new stop on Northwest Boulevard at 1st Avenue Continue south on Northwest Boulevard Left on Williams Avenue Left on Bobcat Avenue Left on W. 1st Avenue and continue over existing route 17

New Long-term Line 31 route in Grandview yard Goal: Keep convenient transit service to Grandview Yard while being good neighbors to area residents. New Line 31 route expected to begin on May 6th: South on Northwest Boulevard Left on Williams Avenue Right on Rail Street and continue to End of Line Continue south on Rail Street Right on Goodale Boulevard Right on Northwest Boulevard Left on W. 1st Avenue and continue over existing route Correct for line 22, change line 31 18

route change: Line 24 Hamilton Goal: Improve travel time by removing low ridership deviation on Line 24. New Line 24 Route: Continue south on Hamilton Road onto S.R. 317 Right on Groveport Road over regular route 19

route change: Line 35 Dublin-granville Goal: Extend service to homes and businesses near the intersection of Dublin-Granville Road & Westerville Road. New Northbound Route Continue north on Westerville Road Left on Old Dublin-Granville Road Right on Dublin-Granville Road Right on Ponderosa Drive Continue on existing route New Southbound Route Continue east on Great Woods Blvd. Right on Ponderosa Drive Left on Dublin-Granville Road Left on Old Dublin-Granville Road Right on Westerville Road and continue on existing route 20

Route change: line 35 Dublin-granville 21

May 2019 Service Changes Trip changes

No change to service: Line 43 Westerville Past Proposal: Combine unproductive early A.M. & P.M. trips on Line 43 Westerville due to low ridership. Outcome: COTA will not combine trips on Line 43. New data shows Line 43 ridership is beginning to increase. 23

Additional trips: Line 52 Canal Winchester Goal: Add A.M. & P.M. trips to better meet demands of new ridership A.M. Trips to Downtown Columbus P.M. Trips to Canal Winchester P&R CANAL WINCHE-STER PARK & RIDE N HIGH ST & E MOUND ST (NORTH) E MAIN ST & S HIGH ST S 4TH ST & E CAPITAL ST SPRING ST TERMINAL (BAY 5) F E D C A 6:13 6:39 6:40 6:43 6:47 6:41 7:07 7:08 7:11 7:15 7:39 7:40 7:43 7:47 7:41 8:13 8:14 8:17 8:21 *Highlighted Trip is the ADDED trip * SPRING ST TERMINAL (BAY 5) S 3RD ST & E BROAD ST S HIGH ST & W MOUND ST (SOUTH) CANAL WINCHESTER PARK & RIDE A B E F 4:10 4:14 4:20 4:48 4:40 4:44 4:50 5:20 5:10 5:14 5:22 5:53 5:40 5:44 5:52 6:23 *Highlighted Trip is the ADDED trip * 24

Additional trips: Line 72 Tuttle Goal: Due to standing room-only buses, COTA added a new A.M. and P.M. trip to Line 72 Tuttle effective March 25th. *Adjusted/added trips circled in red 25

construction-Related May 2019 Service Changes construction-Related

Short North Streetscape Construction Goal: Maintain service during construction on N. High Street from Starr Avenue to 9th Avenue through 2020. Expect delays and temporary stop closures For more information on the project: columbus.gov/highstreet Lines affected: CBUS Line 1 Kenny/Livingston Line 2 E. Main/N. High Line 5 W. 5th Ave./Refugee Night Owl Line 102 Polaris Pkwy/ N. High (formerly Line 2L) 27

Short North Streetscape Construction Project Status, as of Spring 2019 28

Relocate Long & High stop (Id 4157) Goal: Return Long & High stop to southwest corner upon completion of construction project on that corner. Expected relocation to take place in summer 2019. Exact date to be determined. 29

Ongoing construction impacting cota Goal: Maintain bus service during regional construction projects. E. Livingston Ave. between S. High St. and Parsons Ave. (Line 1, Line 4, Line 8) Short North Phases 3 & 4 from Starr to 9th Avenues (CBUS, Line 1, Line 2, Line 102 (formerly 2L), Line 5, Night Owl) Cleveland Ave. from E. Long St. to Mt. Vernon – Creative Campus Project (Line 6, Line 9, CMAX) North Broadway & Olentangy River Road roadway & freeway improvements (Line 32, Line 72) Polaris Parkway from I-71 to Westerville Rd. improvements (Line 102 (formerly 2L), CMAX) N. High St. & E. 15th Ave. redevelopment (Line 1, Line 2, Line 102 (formerly 2L), Line 31, Night Owl) Riverside Dr. & Nottingham Rd. ODOT paving, crosswalk, and ramp improvements from April 11th through late 2019 (Line 32, Line 73) 30

Watch for delays in the following areas Goal: Inform customers of expected upcoming construction delays. Hamilton Road from I-70 to Refugee Road (Line 5, Line 23, Line 24) Addition of shared use path on west side and sidewalk on the east side Late April 2019 James Road from Livingston to Main – roadway & drainage improvements (Line 23) July 2019 (Might be pushed back to September) W. Third Ave. between Northwest Blvd. & Edgehill Road (Line 3) Sidewalk construction on north side of street May 2019 McGuffey & Duxberry sidewalk construction (Line 8) July 2019 Hamilton Road from 161 to Morse Road street widening (Line 24) 31

Follow us @COTABus