Internal Audits Management Review Meetings

Slides:



Advertisements
Similar presentations
ISO 9001:2000 Documentation Requirements
Advertisements

Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
ISO 9001 : 2000.
EPSON STAMPING ISO REV 1 2/10/2000.
Contractor Safety Management
22000 Food Safety Management Systems
By Saurabh Sardesai October 2014.
Prepared by Long Island Quality Associates, Inc. ISO 9001:2000 Documentation Requirements Based on ISO/TC 176/SC 2 March 2001.
FPSC Safety, LLC ISO AUDIT.
4. Quality Management System (QMS)
Release & Deployment ITIL Version 3
Fundamentals of ISO.
Continual Service Improvement Process
Basics of OHSAS Occupational Health & Safety Management System
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Effective Management and Compliance 1 ANA GRANTEE MEETING  FEBRUARY 5, 2015.
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
Roles and Responsibilities
Copyrights I Global Manager Group | Revision 0.1 Feb 2009 | 1 GMG DEMO OF ISO: ENERGY MANAGEMENT SYSTEM AUDITOR TRAINING PRESENTATION KIT.
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
普 华 永 道 Phase 1: Project Preparation Phase 1: Project Preparation Phase Overview Phase Overview.
Project Kick-off Meeting Presented By: > > > > Office of the Chief Information Officer.
Develop Project Charter
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
The Certified Quality Process Handbook Chapter 6: Audits Presented by Dr. Joan Burtner Certified Quality Engineer Associate Professor and Chair Dept. of.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
Learn Integrated Management System Documentation Process with Ready-to-use EQHSMS Documentation Kit
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
What is ISO? ISO is that the world’s largest developer of voluntary International Standards. International Standards provide state of the art specifications.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
Project Management PTM721S
Project Kick-Off Meeting
Software Quality Control and Quality Assurance: Introduction
ISO/IEC
ISO 14001: 2004 Environmental Management Review Presentation
Software Configuration Management
ONUR AIR QUALITY DIRECTORATE
TechStambha PMP Certification Training
FC facilitation of Installations
Fundamentals of ISO.
UNIT V QUALITY SYSTEMS.
Training Course on Integrated Management System for Regulatory Body
Establishing Strategic Process Roadmaps
Quality Management Systems – Requirements
The Process Owner is the Secret Agent!
Our Change Management Approach
ITSM Governance is Imperative to Succeed
IT Governance Planning Overview
Guidance notes for Project Manager
QUALITY MANAGEMENT SYSTEM
IS&T Project Reviews September 9, 2004.
By Jeff Burklo, Director
CIS12-3 IT Project Management
Project Management Process Groups
Management System - update -
Safety Management System Implementation
How to conduct Effective Stage-1 Audit
Engineering Processes
PSS verification and validation
ESS Handbook for Radiation Protection
ESS Management System SSM visit 24th October
Relevant Management System & Declaration of Conformity EU compliance
Executive Project Kickoff
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Software Reviews.
Bridging the ITSM Information Gap
Bridging the ITSM Information Gap
Presentation transcript:

Internal Audits Management Review Meetings Quality Division Ivan Korunoski www.europeanspallationsource.se 19-05-26

WoW Dev. Excellence & ESSMS ESSMS- Architecture European Spallation Source ERIC Mission, Vision, Core values Policies Strategies Objectives ESSMS Manual People WoW Area Handbook Supportive doc´s Templates WoW Dev. Excellence & ESSMS 12 WoW Facility Owner appointment letters Top level Org. description Functional Descriptions R2A2 Baselined Facility documents WoW Handbook 1. WoW Handbook 2. WoW Handbook 3. WoW Handbook 12. …

Agenda WoW Develop Excellence and ESSMS Internal Audits Main activities introduction Internal Audits Steering documents and evidence of execution Self Assessments Skanska and ESS (SEC) Management Review Meeting Steering document and evidence of execution

ESS WoW Develop Excellence and ESSMS WoW area consist of two main activities: Develop ESSMS ESSMS Architecture/structure WoW areas People leg Develop Excellence Internal Audits Management Review Meeting Management of Non Conformities Continual Improvements

Internal Audits Internal Audits ESSMS documents defining the method to be applied: ESS Procedure for Internal Audit ESS Procedure for Audit Program ESS Plan for Audits (2018/2019) Result of method application (evidence of execution): Audit Management Status / Reports

ESS Procedure for Internal Audits Initiating the Audit Preparing the Audit Conducting the Audit Preparing & distributing Audit Report Completing the Audit Based on ISO 19011 – guideline for Auditing Management Systems Individual Audit in Focus, Instructions on how to perform an audit Auditing Principles for good Safety/Quality culture Definition of roles involved in Audit Internal Audits are on Management Review agenda

ESS procedure for Audit Program Establish Audit Program Objectives Establish the Audit Program Implement the Audit Program Monitor the Audit Program Review/Improve Audit Program ESS wide Audit Management in scope Director General assignment for HoQ* Division Instructions on how to build and implement ESS Audit Plan (ESS-0242768) Annual revision and follow up during MRM** Overall Audit Objectives as starting point – dialogue around Management priorities *HoQ- Head of Quality; **MRM- Management Review Meeting

ESS Plan for Internal Audits Audit scope and schedule for each Internal Audit During MRM 2017, Audits Plan has been agreed MRM 2018, EMT will review the Audit Plan fulfilment and suggest new areas for Audits ESS Audit Plan (2018/2019) ESS-0242768 Test Stand 2 inspection (February 2018) Logistic Function (April 2018) a) Handover process (from construction phase to trial operation/operation) b) Design release process including change handling (September 2018) Working permits and access control/Operating Limits and Conditions (Before start of or in the early beginning of trial operation) Incident Reporting and connection to emergency escalation/Competence, staffing and verified skills for safety significant positions (Before start of or in the early beginning of trial operation) 2018 2019

Test Stand 2 inspection - Performed Planned: February 2018 Executed: February 2018 Objective: Test Stand 2 readiness for operation (e.g. criteria SSM regulations and conditions according to permit SSM2017-2659) with focus on: Radiological safety, Conventional safety (e.g. Electrical safety), Training, Access control, Defined roles & responsibilities, Emergency procedures, Reporting non-conformities and incidents ESS Procedure for IA applied, Inspection Plan (ESS-0228634) and Report created (ESS-0239960) Auditors: Ida Bergström, Jörgen Mattsson, Michael Plagge, observer Mattias Skafar Summary: Number of Non Conformities reported: 9 Current status: All assigned , 2 are closed Number of Observations reported : 6 Current status: All assigned, ongoing Identified best practices reported : 2 Audit Status: Open Non Conformities are not related to Radiological Safety Lessons Learned: Selection of Auditors and their authority should be clarified

Logistic Internal Audit - Performed Planned: April 2018 Executed: April/May 2018 Objective: Working methods that have been set up compared to the original statement of work and delivery of the services by the Logistic Service Provider, with focus on : Assignment and execution of work Financial Control ESS Procedure for Internal Audits applied, Internal Audit Report created (ESS-0280532) Auditors: Mattias Skafar, Natascha Parnefjord, Ivan Korunoski Summary: Number of Non Conformities reported: 3 Current status: All assigned, ongoing Number of Observations reported : 1 Current status: assigned, ongoing Identified best practices reported : 1 Audit Status: Audit will be closed after verification of corrective actions (Nov 2018) Lessons Learned: Difference between Internal Audit and Internal Control

Handover process Design release process including change handling Planned: September 2018 Executed: September/October 2018 Objective: To analyse/assess and if possible approve the approach of Handing over buildings from Skanska Consortium to ESS, with focus on. Delivered documentation alignment with ESS MS requirements Early Involvement of ESS central Services early in the process General improvement of handover principles, transfer of responsibilities and ownership Several formal meetings documented, report to Steering group, ETB and final Report created (ESS-0359154) Participants: Quality Division to chair the group reporting to Steering group ( Technical Director, Head of CF, Director of PS&S, Associated Director ESH&Q) Summary: Current approach was not well know Well documented and implemented as part of contractual agreement WoW Develop & Maintain owner of the future handovers Next step: Handover Working Group has been terminated Lessons Learned: Stakeholders communication

ESS overview of Non conformities and improvements in JIRA Total no of NCR registered in system: 24 (19 open and assigned and 5 closed) NCR from TS2 Audit: 9 (all assigned, 2 are closed) NCR from Logistic Audit: 3 (all assigned, ongoing) NCR from Project: 12 (7 open, all assigned, 5 are closed) Total no of improvements registered in system: 7 (7 open and 5 is assigned) Improvements from TS2 Audit: 6 (all assigned, ongoing) Improvements from Logistics Audit: 1 (assigned, ongoing) Improvements from Project: None.

ESS Self Assessments ESS EMT* performed Self Assessment MRM agenda 2017, Validation for Commitment to Excellence 3 Improvement Projects prioritized by EMT Learning Management System Decision Making Internal Communication Culture Assessment ESS Supply Procurement and Logistic Self assessment 3 Improvement Projects Contract Management Survey of Stakeholders feedback Knowledge sharing (0 cost) Self Assessment WoW 2018 WoW Managers participated, one day Main Conclusions: Involvement of Owners Strategy development Measurements for WoW Input for ESS 2018 MRM Zero measurement WoW maturity status *EMT- Executive Management Team EFQM- European Foundation for Quality Management

Skanska & ESS Audit Management Skanska has, in order to facilitate an open and transparent cooperation with the client, created a company for constructing the infrastructure of the ESS research facility. The company is named “Skanska ESS Construction HB” (SEC) Spot-checks are carried out by the SEC quality function together with the SEC production. The spot-checks are typically carried out at the beginning of a work sequence and on quality critical works Presently 63 Spot-checks (14 Internal Audits) have been carried out. Chapter “13. Quality” handles procedures for: Non-conformities Spot-checks Audits

ESS procedure for Management Review Meeting (MRM) Based on ISO 9001, EMT review and decision forum Standard Agenda First ESS MRM performed in 2016, 2018 MRM scheduled for 27th of November Quality Division assists DG in preparation, realization and communication (MoM, action plans released) Half Year review progress on DG request

Conclusion WoW Develop Excellence and ESSMS Introduction and relation to top WoW map WoW area Main activities Internal Audits and evidence of execution Status of Non conformities and improvements Self Assessments SEC Audits Management Review Meeting and evidence of execution Plan for 2018