Revising the ROLO Lunar Model — A Status Update

Slides:



Advertisements
Similar presentations
VIIRS Reflective Solar On-orbit Calibration and Performance Jack Xiong and Jim Butler Code 618.0, NASA/GSFC, Greenbelt, MD CLARREO SDT Meeting, NASA.
Advertisements

Use of the Moon as an On-orbit Calibration Source Thomas C. Stone US Geological Survey, Flagstaff AZ Hugh Kieffer Celestial Reasonings, Carson City NV.
1 Weekly Report on GOES-14 PLT Science Test NOAA / NESDIS / STAR X. Wu, G. Rancic, F. Yu, M. Grotenhuis December 14, 2009.
SNPP VIIRS On-Orbit Calibration for Ocean Color Applications MODIS / VIIRS Science Team Meeting May 2015 Gene Eplee, Kevin Turpie, Gerhard Meister, and.
NASA, CGMS-41, July 2013 Coordination Group for Meteorological Satellites - CGMS Calibration/validation of Operational Instruments at NASA Langley Research.
Use of the Moon as a calibration reference for NPP VIIRS Frederick S. Patt, Robert E. Eplee, Robert A. Barnes, Gerhard Meister(*) and James J. Butler NASA.
Report from JMA 17th GSICS Executive Panel, Biot, 2-3 June 2016 Masaya Takahashi on behalf of Kazumi Kamide Meteorological Satellite Center, Japan Meteorological.
Japan Meteorological Agency, June 2016 Coordination Group for Meteorological Satellites - CGMS JMA’s Cal/Val activities Presented to CGMS-44 Working Group.
1EUM/RSP/VWG/16/ Tim Hewison Tom Stone Manik Bali Selecting and Migrating GSICS Inter-Calibration Reference Instruments.
Report from USGS 17th GSICS Executive Panel, Biot, 2-3 June 2016 Thomas Stone U.S. Geological Survey, Flagstaff, Arizona USA GSICS-EP-17, Biot, 2-3 June.
Lunar Calibration Workshop Preparation Sébastien Wagner (EUMETSAT) In collaboration with Tom Stone (USGS) Sophie Lachérade, Bertrand Fougnie (CNES) Jack.
Thomas C. Stone U.S. Geological Survey, Flagstaff, AZ USA GSICS Research Working Group Meeting EUMETSAT 24−28 March 2014 Using the Moon as a Radiometric.
PLEIADES Lunar Observations Sophie Lachérade, Bertrand Fougnie
Description of the giro ON THE DETAILS OF THE IMPLEMENTATION
PREPARATION OF THE GiRO executable
Tim Hewison (1) Sébastien Wagner (1), Tom Stone (2), Gary Fowler (1)
Calibrating the METEOSAT SEVIRI solar channels using lunar observations Sébastien Wagner (1) Bartolomeo Viticchie (1), Tom Stone (2), Tim Hewison(1), Gary.
EUMETSAT’s Lunar Calibration Capabilities
GRWG VIS/NIR Sub-Group Briefing Report
Update on Lunar Calibration Development
Progress toward DCC Demo product
Lunar Calibration Workshop Activities
Second Joint GSICS-IVOS Lunar Calibration Workshop
Technical Expectations from Organizers & Participants B. Fougnie, S
MODIS and VIIRS Reflective Solar Bands Calibration Methodologies and
Fangfang Yu, Xiangqian Wu and Tom Stone
Doelling, Wagner 2015 GSICS annual meeting, New Delhi March 20, 2015
The ROLO Lunar Calibration System Description and Current Status
GIRO usage and GSICS Lunar Observation Dataset Policy S. Wagner
Sébastien Wagner (1) Tom Stone (2), Gary Fowler (1), Tim Hewison (1)
GOES Lunar Calibration
Data Preparation for Using the ROLO / GIRO Model
Lunar Calibration activities
MODIS Lunar Calibration Data Preparation and Results for GIRO Testing
Measurements of the Moon by CLARREO Pathfinder and ARCSTONE
Update on Advancing Development of the ROLO Lunar Calibration System
Future Developments of the Lunar Calibration System
Sébastien Wagner (EUMETSAT) Tom Stone (USGS)
Update on the GIRO Benchmark
GRWG VIS/NIR sub-group briefing report
Sensitivity ANALYSIS Sébastien Wagner (EUMETSAT) In collaboration with
Contribution to Agenda Item 8
S-NPP Visible Infrared Imaging Radiometer Suite (VIIRS) Lunar Calibration using GSICS Implementation of the ROLO model (GIRO) for Reflective Solar Bands.
Update on GSICS Product Development
Moving toward inter-calibration using the Moon as a transfer
GIRO APPLICATION Current status and NEXT STEPS
Sensitivity ANALYSIS Sébastien Wagner (EUMETSAT) In collaboration with
Strategy for calibration references
Lunar Observation Data for GIRO Landsat–8 Operational Land Imager
Definition of a benchmark for the GIRO
Lu Zhang, Peng Zhang , Xiuqing Hu, Lin Chen
Strategy for calibration references
Technical aspects of the GIRO work: inputs from GRWG
Status of the EUMETSAT GSICS DCC product
Current Status of ROLO and Future Development
Moving toward inter-calibration using the Moon as a transfer
Traceability of the GIRO to the ROLO: Definition of a benchmark
Preliminary SCIAMACHY Lunar observations as intercalibration source
Progress toward DCC Demo product
Inter-band calibration using the Moon
goes-16/17 abi lunar calibration
Discussion on Solar Spectra for Vis/NIR Calibrations
T. Hewison, S. Wagner, A. Burini, O. Perez Navarro, M. Burla, F
Lunar irradiance measurement and modelling
The GSICS Lunar Observation Dataset
T. Hewison, S. Wagner, A. Burini, O. Perez Navarro, M. Burla, F
GRWG VIS/NIR sub-group briefing report
Lunar Calibration Workshop Activities
Toward a synergy between on-orbit lunar observations
Lunar Calibration Workshop Status of the preparation
Presentation transcript:

Revising the ROLO Lunar Model — A Status Update Thomas C. Stone U.S. Geological Survey, Flagstaff, AZ USA GSICS webmeeting 30 August 2016

Reprocessing the ROLO lunar image dataset (model basis data) To produce a new lunar irradiance model using data existing today requires the following steps, in sequence: Reprocessing the ROLO lunar image dataset (model basis data) ROLO is still the most extensive collection of lunar measurements involves revising the telescope data reduction routines for image processing to irradiance measurements routines for evaluating background and edge spread effects data quality checks: comparison against the current lunar model Reformulating the lunar disk reflectance model e.g. implement band-dependent libration terms Fitting the irradiance dataset — obtaining model coefficients develop and implement fit constraints derived from external data, e.g. PLEIADES, SNPP-VIIRS iterate with (2) above Testing the new model reprocess existing lunar measurement datasets and compare results do we still see a phase angle dependence for e.g. MSG series?

revising the ROLO data reduction system Next efforts at USGS: revising the ROLO data reduction system i.e. Step 1 of the sequence assessing uncertainties in the existing ROLO model essential for ground-based aerosol measurements at night using moonphotometers geometric specification — irradiance changes with phase and libration spectral specification of the lunar reflectance (and solar irradiance) Future efforts: redeveloping the lunar calibration reference requires new, high-accuracy basis dataset(s) NIST ground-based lunar irradiance measurement project Stephen Maxwell has taken over from Claire Cramer NASA-Langley cubesat mission — ARCSTONE prototype instrument designed and built by Resonon, tested at NIST instrument EDU is under development proposal submitted to NASA Instrument Incubator Program → TRL 5