xoserve Services XOSERVE SCOPE Sites Register Maintenance Shipper

Slides:



Advertisements
Similar presentations
Application of User Pays Principles to Existing Service Lines 22nd November 2006.
Advertisements

THEFT OF GAS TEAM. THEFT OF GAS TEAM PO Box 6803, 31 Homer Road, Solihull, B91 3LT Fax : Free Phone : Seamus Rogers Account.
Data Logger/ Daily Meter Reading Processes. New Daily Metered Site  DM Service Provider receives a request from Gas Shipper for installation of daily.
Gas Consumer Forum Project Nexus xoserve update 27th July 2009
Temporary Accounts and Permanent Accounts
Analyzing & Recording Business Transactions
For more info visit at For more info visit at
Which of the following is included in “Other Receivables”
P274 – National Revenue Protection Service. 2 Principles of X-industry gas theft service The impact on the participants will be revenue neutral (no supplier.
Smart Grid and the Game Changing Applications Phenomena Lisa A. Dalesandro ISG - Industry Solutions Group Strategic Principal Service Industries.
USING THE INFORMATION IN THE FINANCIAL STATEMENTS Financial ratios are calculated to evaluate the short-term liquidity of a company. These ratios include.
1 Understanding the Financial Statements Lecture No.35 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
Proposed Agreement For Identification And Administration Of Unregistered Sites Chris Warner Network Code Manager.
Credit Arrangements During a Prolonged Emergency Mark Cockayne and Jayne McGlone 11 December 2006 Whilst all reasonable efforts have been made to verify.
Buying equipment with Cash 1 Equipment (Asset) Cash (Asset) + - Debit Credit Debit Credit.
Performance Assurance 21 st May Value Chain. Value Chain Xoserve would like to propose an approach to further aid the development of the Performance Assurance.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Chart of Accounts.
Total xoserve income £(a)m (ASA services – includes element for transporter funded changet) Transporter funded change budget built into service charge.
Analyzing Business Transactions Using T Accounts FLASHCARDS.
PN UNC Workgroup Invoicing 24 th October Objectives of the Workgroups To determine detailed business requirements Consider/review comments made.
© British Gas Trading Limited 2011 Slide 1 Re-establishment of Shipperless Sites UNC0425 Scenarios Scenario 1 – Last Shipper only activity Effective meter.
LESSON 11-2 Posting to an Accounts Receivable Ledger.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
Meter Error – NTS Revenue Flows Gas TCMF – 2 nd December 2010.
© South-Western Educational Publishing CASH RECEIPTS JOURNAL Lesson 11-2, page 259.
FGO: ASA Service Line Review
Notes Receivable Answer: June 14 Total days in note 90 days
Demand forecast and network balancing
ACCOUNTS RECEIVABLE LEDGER AND GENERAL LEDGER CONTROLLING ACCOUNT
Statement of Revenues, Expenditures, and Changes in Fund Balance
PN UNC Workgroup Invoicing 4th October 2011.
For more info about our Samsung printer customer services visit on our site:
KEY FEATURES FOR A MODERN DISTRIBUTION MANAGEMENT SYSTEM IN THE COMPETITIVE ENERGY MARKET ENVIRONMENT Andreas HUBER Gilbert SUTER Siemens AG.
CASH AND CREDIT CARD SALES
سياسات التوزيع الفصل السادس عشر.
إعداد القوائم المالية Preparation of Financial Statements
Revised registration for unregistered sites
Adjustment for Accrued Revenues
Chris Warner Network Code Manager
Mod 430 iGT Mod 047 Workgroup Update
Xoserve On-Boarding Organisation Checks
CSEPs Reconciliation Proposals
UNC Mod Retrospective Invoice Limitation © 24 November 2009 EDF Energy plc. All rights Reserved.
Gas Security of Supply SCR Proposals: Credit Implications for the GB Gas Market Introducing a new Transmission Workgroup Topic 4 October 2012.
MOD 258A Demand Estimation Sample Point – Shipper Report.
Best viewed in slide show mode (F5)
Best viewed in slide show mode (F5)
Transporter Initiated SPA Confirmations on behalf of User Potential Impact Discussion with UK Link Committee.
Best viewed in slide show mode (F5)
Connected System Exit Points - Update
Best viewed in slide show mode (F5)
Joint Theft Reporting Review (from meeting 1st March 2019)
Sub Deduct Process Andrew Stone.
MOD 640 INVOICING VALIDATION RULES
Modification 421 – Updates and Benefits Case
Best viewed in slide show mode (F5)
GT Response to Action AMR014 Project Nexus AMR Workgroup 20th July | Energy Networks Association.
Best viewed in slide show mode (F5)
Review of Accounting 1 Day 2
SIGNING A NOTE PAYABLE  
Unregistered and Shipperless Process
Joint Office UNC Elections
Joint Office UNC Elections
Enabling Large Scale Utilisation of Class 3
Joint Office UNC Elections
Development Work Group 194
Customer Issue Management Dashboard CoMC
Customer Issue Management Dashboard CoMC
Presentation transcript:

xoserve Services XOSERVE SCOPE Sites Register Maintenance Shipper Switching Information Services Shipper Balancing Information Shipper Registration Liabilities Calculation Emergency Service ToG Shipper Terminations Customer & Account Management Meter Read Processing Sites Register Maintenance Transmission Billing Information Transmission Billing Credit and Risk Management Network Operation Quantity Calculation Must Reads Distribution Billing Information Distribution Billing Cash collection Meter Asset Processing Demand Derivation Metered Volume Calculation Energy Balancing Billing Info Energy Balancing Billing Energy Cash collection C&RM Ofgem BPQ visit – 18 May 2006

Principal xoserve systems Ofgem BPQ visit – 18 May 2006