EVALUATION OF COUNTERMEASURES PDCA

Slides:



Advertisements
Similar presentations
QUICK TIPS (--THIS SECTION DOES NOT PRINT--) This PowerPoint template requires basic PowerPoint (version 2007 or newer) skills. Below is a list of commonly.
Advertisements

Title: The title should accurately describe the issue to be addressed and can never contain a proposed countermeasure. Overview Note: Remember that the.
QUICK TIPS (--THIS SECTION DOES NOT PRINT--) This PowerPoint template requires basic PowerPoint (version 2007 or newer) skills. Below is a list of commonly.
Tracking individual employee skill development S KILLS P ASSPORTS.
Creative Commons Attribution-ShareAlike 3.0 Unported License - you may use and share this file, but please attribute it to
1 After completing this lesson, you will be able to: Add a header and footer to a worksheet. Change margins and center a worksheet. Change the orientation.
Microsoft Office 2007: Introductory Computer Applications 11.
Pasewark & Pasewark 1 Word Lesson 8 Increasing Efficiency Using Word Microsoft Office 2007: Introductory.
1 © 2006 by Smiths Group: Proprietary Data Smiths Group Online Performance Review Tool Training.
Project Planning with MS PROJECT When Do you Use Project? Does it have a beginning and end? Does it use –People –Money –Facilities –Equipment Does it.
Petrophase 2008 Poster Presentation Title
Creative Commons Attribution-ShareAlike 3.0 Unported License - you may use and share this file, but please attribute it to
QUICK DESIGN GUIDE (--THIS SECTION DOES NOT PRINT--) This PowerPoint 2007 template produces a 36x48 inch professional poster. You can use it to create.
QUICK TIPS (--THIS SECTION DOES NOT PRINT--) This PowerPoint template requires basic PowerPoint (version 2007 or newer) skills. Below is a list of commonly.
Creative Commons Attribution-ShareAlike 3.0 Unported License - you may use and share this file, but please attribute it to
ITIL Problem Management Tool Guide Gerald M. Guglielmo ITIL Problem Manager CD-doc
Database Design IST 7-10 Presented by Miss Egan and Miss Richards.
Pasewark & Pasewark 1 Word Lesson 8 Increasing Efficiency Using Word Microsoft Office 2007: Introductory.
Microsoft Office Word 2013 Expert Microsoft Office Word 2013 Expert Courseware # 3251 Lesson 4: Working with Forms.
QUICK DESIGN GUIDE (--THIS SECTION DOES NOT PRINT--) This PowerPoint 2007 template produces a 36”x60” professional poster. It will save you valuable time.
RESEARCH POSTER PRESENTATION DESIGN © m QUICK TIPS (--THIS SECTION DOES NOT PRINT-- ) This PowerPoint template requires.
RESEARCH POSTER PRESENTATION DESIGN © QUICK DESIGN GUIDE (--THIS SECTION DOES NOT PRINT--) This PowerPoint 2007 template.
Chapter 6 Advanced Report Techniques
RESEARCH POSTER PRESENTATION DESIGN © QUICK TIPS (--THIS SECTION DOES NOT PRINT--) This PowerPoint template requires basic.
Chapter 6 Generating Form Letters, Mailing Labels, and a Directory
“Bag It” Product Design With the Problem Solving Process.
QUICK TIPS (--THIS SECTION DOES NOT PRINT--) This PowerPoint template requires basic PowerPoint (version 2007 or newer) skills. Below is a list of commonly.
Draft TIP for E-rate. What is E-rate? The E-rate provides discounts to assist schools and libraries in the United States to obtain affordable telecommunications.
RESEARCH POSTER PRESENTATION DESIGN © entations.com QUICK DESIGN GUIDE (--THIS SECTION DOES NOT PRINT--) This PowerPoint 2007 template.
Fall 2003Sylnovie Merchant, Ph.D. ACCESS Tutorial Note: The purpose of this tutorial is to provide an introduction to some of the functions of ACCESS in.
INFORMATION MANAGEMENT Module INFORMATION MANAGEMENT Module
Chapter 10 Creating a Template for an Online Form Microsoft Word 2013.
Printing Reports. Creating Reports  Reports are the best way to put information from database onto paper, PDF files, and other formats.  In a report,
QUICK DESIGN GUIDE (--THIS SECTION DOES NOT PRINT--) This PowerPoint template produces a 36”x48” professional poster. It will save you valuable time placing.
Web Site Development - Process of planning and creating a website.
Creating a Google Site For a Digital Portfolio Purpose.
Last Updated: MONTH, YEAR Team: M. W. (Team Leader)R. F. T. D.M.G. T. L.D. J. (Sponsor) Green Belt Project Objective: TITLE Green Belt Project Objective:
Excel Chapter 1 Creating a Worksheet and an Embedded Chart
Chapter 2 Build Your First Project A Step-by-Step Approach 2 Exploring Microsoft Visual Basic 6.0 Copyright © 1999 Prentice-Hall, Inc. By Carlotta Eaton.
ผศ.เสาวลักษณ์ สุขประเสริฐ มหาวิทยาลัยขอนแก่น มหาวิทยาลัยสงขลานครินทร์ พ.ค
Green Belt Project Storyboard Template See Green Belt Storyboard Checklist for required contents Visit GoLeanSixSigma.com for more Lean Six Sigma Resources.
Service Management World Class Operations - Impact Workshop.
Lean Six Sigma DMAIC Improvement Story
Annual Performance Management Cycle Management Training Tutorial
Chapter 03 Project Design
Management & Planning Tools
PowerPoint Template – delete this slide
Lean Six Sigma DMAIC Improvement Story
Deliberate Practice PGP
Lean Six Sigma DMAIC Improvement Story
Title: Owner: Ver: Date:
Database Applications – Microsoft Access
Title: Owner: Ver: Date:
Title: Owner: Ver: Date:
<PROJECT NAME> THEME STAKEHOLDERS BACKGROUND CURRENT CONDITION
STATUS REPORT.
Title: What are you talking about
Decision Focus® 6.0 Tool Chooser Issue Description Tools Overview
Subcomponents 8D for Problem Solving
Instructions (this slide should be deleted before final hand-in)
3.1 Understanding Spreadsheets
EVALUATION OF COUNTERMEASURES PDCA
The Troubleshooting theory
Policies Admin Training.
by Operational Excellence Consulting LLC
Field monitoring Project (number and title)
Sepsis Program Development
How is an M & E framework derived from the logframe?
Presentation transcript:

EVALUATION OF COUNTERMEASURES PDCA Title Reference Date Owner Coach Explain the problem context Explain how the problem was discovered Explain why the problem is in conflict with the company’s goals or is relevant to fix. BACKGROUND PDCA EVALUATION OF COUNTERMEASURES PDCA After the root cause is well established and agreed, work with peers to develop several potential countermeasures. Consider each countermeasure one by one, and evaluate the impacts of implementation of each. For example: Q: Expected effectiveness toward the target, risks D: Possible implementation date C: Cost to implement and unit or operational costs F: How will performance / efficiency be affected Other, depending on the situation Gather facts as much as possible. Calculate, simulate, experiment. Don’t rush to a solution. Take time to evaluate with input from peers & stakeholders. Strive for a fact-based decision as to what to implement as the solution to the problem. Record here the decided countermeasures, relevant decision governance, and if not directly obvious, why the justification behind the descision(s). Fact-based understanding of the current state using quantitative measures and data Provide clear evidence without discussing potential causes. Include timeline and severity view if relevant. Go to see for yourself. Discuss with those affected. Confirm with stakeholders. Be visual in your explanation. CURRENT SITUATION PDCA Set a clear, measureable goal for the new state, with target value(s). Be clear on how the performance will be measured. Why was the specific target value chosen? Confirm it with stakeholders. PURPOSE and TARGET PDCA The most important phase of an effective problem solving process, the purpose of this section is to develop a solid understanding of the base cause or causes that lead to the undesired effect. Develop factual, measureable evidence of the cause / effect relationship to the greatest extent possible. Depending on the nature and the scale of the problem, select an appropriate Root Cause Analysis technique (ref GDI 968-08 and Perfrom Root Cause Analysis): 5 why Ishikawa (fish-bone) Fault tree (others) Discuss periodically with your peers and cross-functional experts – their input is extremely valuable. Be appropriately thorough, in proportion to the magnitude of the problem. ROOT CAUSE ANALYSIS ref GDI 968-08 PDCA Focus on the actions to implement the decided solutions Describe at a high level the actions to be taken, by whom, and by when. Insert a table to track completion of tasks. ACTION PLAN PDCA Collect data and verify the measures against the targets set. Add actions as necessary to reach the desired target. Confirm results with stakeholders FOLLOWUP PDCA Identify how to prevent recurrence of the issue Implement standardization in process descriptions Inform about the changes to affected as appropriate Work with appropriate network to have DVG updated where applicable. STANDARDIZE PDCA

Practical Information Basics The A3 is not a template, but a working document, constantly updated until the problem is solved. A true A3 problem solving to address a significant problem is a journey that can take several months. The coach is there to mentor you throughout the problem solving, not to help you solve the problem Use visual elements and tables for simplicity of understanding. Present facts as much as possible. Practical Information Do not change header names. Adjust section sizes as needed (see below). Inserting a text box may be helpful to arrange information in combination with visual elements. To adjust section size (without impact to headers): Each column is a table. To adjust the size of the different boxes drag in the bottom border of each text area. The following cursor symbol should be shown when adjusting the size: Click and drag the bottom border to adjust size of each box To Print: From PRINT tab, Use Printer Properties to set paper size to A3 (or 11x17). To reduce the margin size, from the Print tab select Full Scale Pages  Scale to Fit Paper. NOTE: When using the A3 for solving a problem registered in DTL 3C Process: Save the A3 locally in your group’s team place or in your computer until it has been steered in. When it has been steered in, register the issue in the 3C tool and attach the A3 document. Save the file as a MS PPT presentation: “[Reference ID] [Issue Title] [Version]” Delete this INSTRUCTION PAGE before final storage