Dust Permits – ‘Process and Common Issues’ Craig Grismore - PCAQCD

Slides:



Advertisements
Similar presentations
Siskiyou County Land Development Manual 2006 Update Planning Commission Hearing Land Development Manual Update.
Advertisements

Soil Erosion.
METAL FURNITURE SURFACE COATING MACT FACILITY INSPECTIONS 40 CFR PART 63, SUBPART RRRR July, 2006.
Spill Prevention Control & Countermeasures Compliance and Planning.
1 Overview of Regulations for Water Quality Protection in South Carolina n Federal Clean Water Act/ NPDES Storm Water Program n South Carolina Pollution.
WYOMING WATER & ENERGY LAW NPDES Permitting Issues Kara Brighton Hageman & Brighton, P.C. Cheyenne, WY.
EPA CONSTRUCTION & DEVELOPMENT EFFLUENT LIMITATIONS GUIDELINES Tim Ryan, P.E. Water Resources Engineer Water Resources Engineer Wisconsin Department of.
1 Effluent Guidelines for Construction Greg Davis USEPA
David K. Paylor Director, Department of Environmental Quality May 27, 2014 VEDP Lunch & Learn Environmental Permitting 101.
Cameron County Conservation District. Chapter 102 Rules and Regulations  Erosion is natural, so what’s the deal?  Accelerated Erosion is not natural.
STORMWATER PERMITTING Requirements for the Solid Waste Industry in Colorado 5/04.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
Environmental Harm Urban stormwater frequently contains litter, oil, chemicals, toxic metals, bacteria, and excess nutrients, like nitrogen and phosphorous.
Introduction to Compliance Assistance Documents Part I.
Modifications to the Storm Water Ordinance The City Municipal Separate Storm Sewer System (MS4) drains rainwater and all runoff into natural streams. EPA’s.
Excavation Review 1.  OSHA began because, until 1970, there were no national laws for safety and health hazards.  On average, 12 workers die every day.
Contractor Coordination. Agenda Training Objectives Definitions Law and Regulatory Requirements Responsibilities Implementation Scenarios.
Rule 208 – Permit and Burn Authorization for Open Burning, and Rule Open Burning April 16, 2009 Smoke Management Workshop.
AZPDES and Construction Sites Greg Wise Environmental Program Specialist Arizona Department of Environmental Quality (602)
Crafting Stormwater Programs Oregon Coastal Planners Fall Network Meeting October 9, 2008 Florence Event Center Alissa Maxwell, PE.
Introduction to Construction General Permit Inspections.
1 Permits, Licenses and Inspections Regional Project Introductions: Home Builders & Remodelers Association of Cape Cod State Project Sponsor & Technical.
Crystal Mountain Club Association Architectural Committee
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Pacific Air Forces 1 Preconstruction Orientation HQ PACAF/LGC.
Government of Western Australia Department of Mines and Petroleum Please read this before using presentation This presentation is based on content presented.
Colorado Rocky Mountain Chapter of Solid Waste Association of North America SWANA Annual Conference Friday, October 3, 2008.
SMALL CONSTRUCTION STORMWATER PERMITTING. STORMWATER GENERAL PERMIT FOR SMALL CONSTRUCTION ACTIVITIES Construction activities regulated under this permit.
Short Elliott Hendrickson Inc. April A. Ryan, PE.
Construction Stormwater Rules-2012 Rodney Hendrick, Ph. D. Louisiana Urban Stormwater Coalition.
NEW MEXICO ENVIRONMENT DEPARTMENT AIR QUALITY BUREAU So, you just got a GCP – 5… What Now?
Stormwater Control & Design
Request to Downzone from R-36 To RU-2 Zoning District Applicant: Marshall Miles of GM Propane Docket Z Request for a Rezoning Board of Supervisors.
IMPACT Guide for Pits & Equipment Prepared for the Wyoming Contractors Association October
Corporate Asbestos Review Anthony Peltier 11/2012.
ENVIRONMENTAL PROGRAMS Air Quality Update Regional Council February 28, 2007.
1 Agricultural Programs for Controlling Particulate Matter Pollution Ira Domsky, Deputy Director Air Quality Division presented to Western State Air Resources.
West Pinal PM 10 Nonattainment Area Construction Dust Rule DECEMBER 9, 2015 JOSH DEZEEUW ENVIRONMENTAL PROGRAM MANAGER 1.
Program Overview Town of Wrightsville Beach Public Works Department Stormwater Services.
Guidelines for Land Clearing Presented By: SLC Environmental Resources Department.
Revised 2/1/2011. Parts 1-4 are self-explanatory. The PIN number is obtainable through City Planning or on-line GIS maps. PLEASE TYPE OR PRINT 1. Project.
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
_________________________ U p d a t e O n M a r i c o p a C o u n t y ’ s F u g i t i v e D u s t C o n t r o l R u l e s ____________________________.
Developing a Tribal Implementation Plan
Soil Conservation.
Current NPDES General Permits are available
Community Development November 2011
SWPPP Basics.
Design of a Commercial Shopping Center
Bangkok Metropolitan Administration’s activities to control air quality 1.
Importance of Pre-Construction Meetings
TPDES Construction Management at the City of Laredo
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Pinal County Air Quality Workshop
Planning and BMPs for Large LUPs
Hours of Service Regulations
Georgia Update Jeff Cown Land Protection Branch
Regulation Amendment AM April 3, 2018.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Pinal County Air Quality Control
Flow chart to determine whether coverage is required
Doing Business with Sno-Isle Libraries
City Council Meeting November 14, 2016
TPDES Construction General Permit Compliance
Pinal County Air Quality Workshop
Air Quality and Environmental Compliance Assistance Seminar Air Quality & New Projects Mike Sundblom, Director Pinal County Air Quality.
Uinta Basin General Conformity
Presented to WRAP November 15, 2001 John Kowalczyk & Bob Neufeld
Denver Fire Depart. License Fire Alarm Practice Test # 12
Stormwater Construction General Pemit (CGP) TXR150000
Presentation transcript:

Dust Permits – ‘Process and Common Issues’ Craig Grismore - PCAQCD AESA Conference March 26, 2019 Dust Permits – ‘Process and Common Issues’ Craig Grismore - PCAQCD

Topics Dust Control & Permits Dust Generating Operations/Standards When is a Permit Required Permit Application Process Approvals and Fees Common Permitting Issues

Dust Control & Permits PM10 Non-Attainment Area Quality Standard NAA classification means that air quality in a particular region does not meet federal health standards as defined by the Clean Air Act PM10 is defined as a suspended particulate with an aerodynamic diameter of <10 microns Control Goal – Limit the amount of particulate matter discharged to the atmosphere Sources Include: Fires, Unpaved Roads, Road/Home Construction, Industry, Vehicle Emissions, Agricultural Activities, Demolition Permitting ensures accountability and knowledge of mitigating control methods We Permit 3 different Areas (West Pinal, Apache Junction, Remainder of the County) West Pinal (Rule 4-3-180) Applicant Info: Owner, POC, Project Scope/Size, Work Practice Standards, Site Inspections, Control Measures, Work Practices, Trackout, Limit Trespass, Signage, Opacity Limits, Record Keeping, Signature Apache Junction (Rule 4-7-230, 226, 238) Applicant Info: Owner, POC, Project Scope/Size, Obligatory Work Practice Standards (Access control, Inactive/Post Operations Roadways, Bulk Material Op’s, Trackout, Signage, Training, Control Measures, Load Stabilization, Emission Mitigation, Sub-Contractor Registration, Opacity Limits, Active Area Stabilization, Record Keeping Requirements General Area/Rest of County We attain a signature after reasonable inquiry, that Project statements and information are true and accurate.

Dust Generating Operations/Standards Earthmoving Activities, Land Clean-up, Leveling, Back Filling Drilling, Construction, Demolition, Bulk material handling, storage and/or transporting operations Operation of motorized machinery used in construction, Establishing/Using unpaved parking lots, haul access roads in work site Installing initial landscapes using motorized equipment Standards Opacity Limitations West Pinal/General - Cannot exceed > 20% on the property Apache Junction – 0%/30 sec property line, >20% continuous/intermittent plume/time aggregate average Maintain Site Stabilization Ensure work site attains disturbed surface stabilization compliance at all times, including post-operation Drop Ball Tests utilized to measure stabilization Apache Junction Specifics – Maintenance of Threshold Friction Velocity, Vegetative cover standard, Erodible element coverage, Silt loading standards Track Out West Pinal/General - < 50 linear feet Apache Junction Specifics – < 25 linear feet, Limited daily bulk material movement, measured rumble strips/gravel pads/internal paving guideline, Remove all at end of day

When is a Permit Required Any worksite that covers an area of 0.1 acres or larger 0.1 acres = 4356 sq ft Calculation of land stripping/earthmoving surface areas: Include surface are for all disturbance activities Add 12.5’ to each side of structures, driveways, pads, etc. Parcels must be contiguous if multiple parcels are on one permit Calculation of disturbed area for trenching only projects: 726’ for trenches < 4 feet deep 363’ for trenches > 4 feet deep Calculations in ‘linear feet’ Land stripping and/or earthmoving permits cover trenching and stockpiling – (you do not need to permit them separately)

Permit Application Process Applicant Information: Applicant/Property Owner/Primary Project Contact Project Information – Parcel #, GPS, Township/Range/Section Project Scope – Type, Size, Road, Demo ID Earthmoving Disturbance Activities Work Practice Dust Control Measures – Dust Suppression Limit Trespassing/High Risk Day Stabilization/Signage Worksite Standards Liability Signature – Obligations and Affirmation Site Plot Map (Parcel/Work Location/Access/Neighbors)

Approval and Fees Approvals Fees Only trained Compliance Personnel can approve ‘Real-Time’ approvals possible with front desk applicants Target <24 Hour response to electronic submissions Fees Land Stripping - $75 (.1 to 5); $200 (5-10); add $200 for +10); $2000 (>100 acres) Trenching – From $50 (500 lf) up to $2000 (> 4 miles) Stockpiling – $50 for 10 cy; $100 for 100-500 cy; $150 for >501 cy Annual Block Registration - $2000 (installing utility lines) Late Fees - $25 for <5 acres; $100 > 5 acres

Common Permitting Issues ‘In-person’ applicant typically only represents Owner/Project Coordinator Site Plot Maps Missing Incomplete Submittals (Electronic) ‘Wrong Area’ Applications Name/Address/Phone/Email information missing or wrong Project Scope lacks pertinent detail Parcel/Township/Range/Section missing Missing documents/signatures Dust Control Measure boxes not checked Permit Expiration - Large construction projects personnel allow permits to expire

Questions?