Mode Construction during Validation2

Slides:



Advertisements
Similar presentations
Worldwide Harmonised Test Procedure for Light Duty Vehicles WLTP EVE 2nd Session 13 of September Per Öhlund Co-chair Subgroup EV.
Advertisements

WLTP Phase 1B Main Open Issues Road and Dyno Load Presentation at WLTP IG Meeting Geneva Open Issues Road and Dyno Load- K. Kolesa Working paper.
WLTP-E-Lab Sub Group Test procedure
Informal document No. GRPE (62nd GRPE, 9-10 June 2011, agenda item 3(a)) 1 Summary of 8 th WLTP-DHC Meeting 9 June 2011 Palais des Nations, Geneva.
WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-066 Leader: Per Ohlund / Kazuki Kobayashi.
WLTP 8th DTP Meeting Geneva, DTP Subgroup LabProcICE slide 1 Progress Report DTP Subgroup Lab Process Internal Combustion Engines (LabProcICE)
WLTP-DHC Current status of WLTP-DHC & Mode Construction Prepared by Japan the 16 th DHC group under GRPE/WLTP informal group 15 th Jan Palais.
Audi AG EA-52 Draft Vers WLTP Validation 2 Evaluation Issues ACEA Guidance Document after Bern.
WLTP-DHC Current status of WLTP-DHC & Mode Construction Prepared by DHC Secretary the 18 th DHC meeting under GRPE/WLTP informal group 5 th Jun.
Assessment Criteria for the Acceptability of Cycle and Testing Procedure Informal working document DTP Subgroup LabProcICE slide 1 Assessment Criteria.
1 Discussion paper on Mode Construction during Validation 2 Prepared by Japan DHC group under GRPE/WLTP informal group November 2011 WLTP-DTP-LabProcICE-108.
WLTP 6th DTP Meeting Geneva DTP Subgroup LabProcICE slide 1 Parameter Setting for Validation 2 DTP Subgroup Lab Process Internal Combustion Engines.
Progress report from VTF Validation Phase 2 and Next Steps DTP-12, 16th January 2013, Geneva
WLTP Vehicle range and energy consumption EVE October 2014.
WLTP 9th DTP Meeting Bern, DTP Subgroup LabProcICE slide 1 Progress Report DTP Subgroup Lab Process Internal Combustion Engines (LabProcICE)
WLTP-DTP-12 Geneva, DTP Subgroup LabProcICE slide 1 Progress Report DTP Subgroup Lab Process Internal Combustion Engines (LabProcICE)WLTP-DTP-12.
Proposed by Japan GRPE/WLTP-IG/ DHC subgroup
WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-081 Leader: Per Ohlund / Kazuki Kobayashi.
12 April th DTP Meeting WLTP-DHC Secretary WLTP-DTP DHC Progress Report 12 April 2011 EMPA, Duebendorf, Switzerland WLTP-DHC Secretary N.
Federal Department of the Environment, Transport, Energy and Communications DETEC Federal Office for the Environment FOEN DTP12 Report to GRPE 17th January.
Brussels, 22 September 2009 – 101st MVEG 1 WLTP – DHC Results of Validation Phase 1 tests (drivability of the new test cycle)
OICA CO 2 Impact through Weight Variation on Light duty Vehicles WLTP DTP6, Geneva OICA, Volkswagen WLTP-DTP-LabProcICE-076.
WLTP - Validation Phase 2 (acceptability of the new test procedure)
Progress Report of World-wide Light-duty Test Cycle
DTP Conventional Engines HEV/PHEV/EV Reference Fuels PM/PN
Position paper on Mode Construction during Validation 2
WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-043
Proposed by Japan GRPE/WLTP-IG/ DHC subgroup
Welcome to the 10th Meeting of WLTP DTP 6th June 2012 UNOG Geneva
WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-043
WLTP DTP PM-PN Subgroup Activity Report
WLTP - Validation Phase 2 - Analysis of results
WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-077
WLTP-DTP-LabProcICE-081
WLTP-DTP-LabProcICE-132
WLTP-DTP-LabProcICE-229
Development of World-wide Light-duty Test Cycle
WLTP DTP Lab Process EV sub group
Lab Process Internal Combustion Engines
OIL#58: Shorten test procedure (validation test in phase 1a)
WLTP Validation2 for RLD ~ Validation test plan by Japan ~
Position paper on Mode Construction during Validation 2
Vehicle warm up and stabilisation – RLD and dyno
Lab Process Internal Combustion Engines
Changing Ethernet config using IP changer FW upgrade
WLTP-DTP Open issues.
Lab Process Internal Combustion Engines
Additional Pollutants Subgroup 7th DTP Meeting-13 September
ACEA Comments from ACEA welcomes the idea to develop a shortened range test procedure based on MCT However, ACEA does not support JP proposal.
Definition of Setpoint for monitoring Soak and Testroom temperature
Working Paper No. WLTP-05-11e
Test Mass N1 – « Payload ratio » – PSA proposal
Proposal for aerodynamic options
The tyres used for the test shall:
C.2.10 Sample Questions.
C.2.8 Sample Questions.
C.2.8 Sample Questions.
Specifications for 4WD Chassis Dynamometer in WLTP
Comments Ref:WLTP (17/09/13)
Roadmap for finalization Phase 1A DTP subgroup LabProcICE
GRPE/WLTP-IG/ DHC subgroup
Discussion paper on Applicable Test Cycle and Mode Construction
Discussion paper on Applicable Test Cycle and Mode Construction
Proposal for aerodynamic options
Lab Process Internal Combustion Engines
Discussion document on Mode Construction
Palais des Nations, Geneva
WLTP - Validation Phase 2 - Analysis of results
GRPE/WLTP-IG/ DHC subgroup
Proposal for optional procedure of All Electric Range test (BEV)
Presentation transcript:

Mode Construction during Validation2 WLTP-DTP-LabProcICE-104 Proposal on Mode Construction from the OICA Representatives in the VTF for Validation Phase 2 30.9.2011 W. Coleman/K. Kolesa

Mode Construction during Validation2 (proposal from DTP7) preconditioning L/M test LOW 589s MIDDLE 433s LOW 589s MIDDLE 433s LOW 589s MIDDLE 433s overnight soak Intermediate or complete hot sample1 sample2 sample3 sample4 independent test HIGH 455s Ex-HIGH 323s No soak preconditioning (option) sample A (option) sample B H/Ex-H test sample1 sample2 (option) sample A Range test Range L/M LOW 589s MIDDLE 433s Range H/Ex-H HIGH 455s Ex-HIGH 323s Ki determination (regeneration system) series test series test L/M test H/Ex-H test LOW 589s MIDDLE 433s HIGH 455s Ex-HIGH 323s L/M test H/Ex-H test Loading cycle

Options to be tested in Validation Phase 2 Mode Construction for Validation2 (alternative proposal from OICA-VTF) preconditioning HIGH 455s Ex-HIGH 323s LOW 589s MIDDLE 433s HIGH 455s Ex-HIGH 323s LOW 589s Soak 6 -36 h 600 sec soak Options to be tested in Validation Phase 2 sample1 sample2 sample3 sample preconditioning LOW 589s MIDDLE 433s HIGH 455s Ex-HIGH 323s LOW 589s MIDDLE 433s HIGH 455s Ex-HIGH 323s Soak 6 -36 h sample1 sample2 sample3 Range test City Range LOW 589s MIDDLE 433s AE Range LOW 589s MIDDLE 433s HIGH 455s Ex-HIGH 323s Ki determination (regeneration system) subsequent test subsequent test L/M test H/Ex-H LOW 589s HIGH 455s MIDDLE 433s Ex-HIGH 323s L/M test H/Ex-H loading cycle