Dynamics and Risks of KenGen Portfolio Revenue Budgeting

Slides:



Advertisements
Similar presentations
POWER FACTOR IN ELECTRICAL ENERGY MANAGEMENT
Advertisements

I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
LOGO Ho Chi Minh - November Developments in Energy Sector And Target I. Power Development Plan (Master Plan VII) approved by Vietnam.
Future Jordan Virtual Power Plant EEEMF Jordan 2015 Energy Economy & Energy Management Forum For Mena & Fourth Renewable Energy National Dialogue –Amman.
Energy Commission Ministry of Economic Affairs May 2004 Financing Renewable Energy Development in Chinese Taipei.
THE LONG-TERM ENERGY SUPPLY AND DEMAND OUTLOOK IN TAIWAN ENERGY COMMISSION MINISTRY OF ECONOMIC AFFAIRS AUGUST 2001 MOEA -15-
EXPERT SYSTEM OF THE HUNGARIAN SAPARD PAYMENT AGENCY written by Krisztina Tusor.
Energy Efficiency in Public Buildings in Brazil – Guidelines for Implementation Anand Subbiah, Nexant Inc. April 30, 2002, Kubitschek Plaza Hotel, Brasilia,
1 CSD 14 Partnership Fair May 1, 2006 Christine Egan Executive Director, CLASP The Collaborative Labeling and Appliance.
Congestion Management with Electrical Vehicles ECN PowerMatcher Team.
Copyright 03/15/20021 CREATING A FOREST ONE GROVE AT A TIME Regenerative Reengineering©
Make or Buy transport.
JES Electric Price Increases Compel Businesses to Use Modern Purchase and Use Programs Overview 2017.
DRAFT- April 3, 2001 Restructuring Proposal to Brazos Electric Power Cooperative, Inc. April 6, 2001 This Information is CONFIDENTIAL Per Section 5 of.
MANAGEMENT of INFORMATION SECURITY, Fifth Edition
Financial Management 26th- Apr-16.
Budget Monitoring and Evaluation
Case Study: Are We Ready for Portfolio Management?
CIF FY17 Business Plan and Budget
National Treasury 28 January 2009
Flexible Forward Contracts for Renewable Energy Generators
Car Mileage Background to Consultation
BARC Report at the Information Session
ESMEC-ET Electric Supply Portfolio Report
Mass Government Finance Officers Assoc
The Responsibilities of the Board
Economic Development, Science and Innovation Committee
Malama Chileshe Energy Economist COMESA Secretariat
GITARU UNIT 1 PLC UPGRADE
Resource Mobilisation Strategy for Slum Upgrading
GITARU WATER TREATMENT PLANT & BOTTLING UNIT
JOH-KGN JvW-X1 CORPORATE FRAUD WORKFLOWGEN ABUSE BY THE EMPLOYEES Presented by Security & Integrity Department March 2017 No part of.
Objective: Aligning Resources to Strategy
2019 Legislative Session Preview
REVENUE BUDGET PRESENTATION 2019/2020
THE Seven forks eco- recreational centre
OPERATIONAL EXCELLENCY
GITARU UNIT 1 PLC UPGRADE USING KENGEN INTERNAL RESOURCES
Presented by: Josphat R. Mwandigha
MAINSTREAMING INTEGRATED LAND BOUNDARY MANAGEMENT STRATEGIES (ILMs)
NJERI KAMATU & LYDIA KARINGITHI
MODIFICATION OF MOTORIZED OPERATED VALVE MOV
THE KENGEN journey to world class innovation
Presented by: VICTOR OUMA
POWER PURCHASE AGREEMENTS A Yardstick for Decision Making in KenGen
PROTECTING KENGEN’S INTELLECTUAL PROPERTY Prepared by: Antony Langat
For an Equitable Sharing of National Revenue
ANDREW ORLANDO / WANGECHI MWANGI
Business Services Update Board of Education Workshop December 6, 2016
MR KEPHA OMUOSO Click to add Photo SENIOR ENGINEER QUALITY & SAFETY
Splash oil temperature monitoring: to eliminate crankpin failures
USE OF ANDROID MOBILE APP for remote operation of VALVES.
Maryland WIOA Alignment and Integration
LOCALIZATION OF POWER TECHNOLOGIES THROUGH PARTNERSHIPS
DOG WATCH SENSORS – MONKEY FREE POWER GENERATION
Librarian, Innovation & Knowledge, Central Office:
JOH-KGN JvW-X1 FABRICATION OF FLOW CONTROL VALVES FOR OLKARIA I GEOTHERMAL POWER PLANT Fredrick Olwal - Snr Technician and Joseph Odhiambo.
PAUL MUTUA Chief Engineer, R & D – Central Office
Ibraim Voroga Iliga Mechanical Superintendent, Mechanical workshop,
OMAR SALIM Senior Engineer - Kipevu
Presented by: Margaret Iregi & Enock Biamah.
BENEFITS OF LOWERING MASINGA’S MINIMUM OPERATING LEVEL
MODELLING OF AN OPTIMIZED, AUTOMATED WATER SUPPLY SYSTEM FOR OLKARIA
Presented by: Florence Mwele Eastern Hydros
KENGEN’S CHALLENGES TOWARDS COMPLIANCE TO THE REVISED GRID CODE
MOHAMED ELMI Electrical Technician - Geothermal
FURNITURE MAINTENANCE MANAGEMENT
Your partner with over 70 years of experience
Budget Update April 29, 2019.
Presentation transcript:

Dynamics and Risks of KenGen Portfolio Revenue Budgeting JOH-KGN001-20071212-JvW-X1 Dynamics and Risks of KenGen Portfolio Revenue Budgeting Freda Nyambura Engineer II – Technical Affairs 2018 G2G INNOVATION SEMINAR, PRIDEINN PARADISE 18TH JUNE - 22ND JUNE 2018

FREDA NYAMBURA Engineer II – Technical Affairs Qualifications: JOH-KGN001-20071212-JvW-X1 FREDA NYAMBURA Engineer II – Technical Affairs Qualifications: Currently pursuing a Masters in Public Policy Analysis BSc. Energy Engineering Responsibilities: Her main focus is development, implementation and monitoring for the PPAs across the company. Key milestones/achievements include: Conducted the PPA tests for the 280 MW project Part of the project team for the billing efficiency initiative between KenGen and KPLC A member of the Association of Energy Engineers.

Introduction

Vehicle Power Plant Capacity Cc MW Charge Mileage payment Energy payment Availability Percentage of the time that I can comfortably have my car ready to be driven after taking out maintenance time. Percentage of the time that the plant can comfortably be ready to generate after taking out maintenance time. Load factor The ratio of the actual mileage to the possible mileage in a given time period. The ratio of the actual energy generated to the possible actual generation in a certain time period

The focus of this presentation is the load factor The focus of this presentation is the load factor. The load factor is one of the negotiated items during the PPAs negotiations. The load factor affects the energy revenue.

Kipevu III PPA load factor Budget load factor Actual load factor 2013-14 30.00 66.54 52.04 2014-15 32.30 29.68 2015-16 13.30 17.96 2016-17 20.00 50.84

The value of the gain in load factor in the FY 2016-17 was Kshs The value of the gain in load factor in the FY 2016-17 was Kshs. 173 Million.

Olkaria IV   PPA load factor Budget Load factor Actual load factor 2014-15 85.00 88.41 86.77 2015-16 85.26 79.33 2016-17 90.00 69.50

The value of the lost load factor for the FY 2016-17 is Kshs. 189 The value of the lost load factor for the FY 2016-17 is Kshs. 189.52 Million

Sagana   PPA load factor Budget Load factor Actual load factor 2013-14 70.00 83.47 68.88 2014-15 62.22 57.45 2015-16 59.49 57.85 2016-17 59.37 31.82

The value of the lost load factor for thr FY is Kshs. 39.04 Million

Gitaru   PPA load factor Budget Load factor Actual load factor 2013-14 54.00 44.70 43.86 2014-15 54.73 37.52 2015-16 39.36 45.56 2016-17 38.31 40.97

The value of the lost load factor in the FY 2016-17 is Kshs. 7 The value of the lost load factor in the FY 2016-17 is Kshs. 7.65 Million.

Major Hydro   PPA load factor Budget Load factor Actual load factor 2013-14 54.00 50.14 56.32 2014-15 46.62 46.59 2015-16 47.17 53.28 2016-17 45.33 47.81

The value of the load load factor in the FY 2016-17 is Kshs. 12 The value of the load load factor in the FY 2016-17 is Kshs. 12.88 Million

Way forward and Conclusion The annual budgeting load factor is a moving number while the PPA load factor is a locked number for the lifetime of the plant. Moving forward, my suggestion is that we have the PPA load factor as the in-house KPI load factor and the annual load factor as the load factor for that will factor in any maintenance we may have in the given year.