ESS High Beta Cavities Quality Assurance and Control - Learning and Planning Workshops, CEA Saclay, 30 June - 1 July 2016 Mark Pendleton STFC, Daresbury.

Slides:



Advertisements
Similar presentations
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
Advertisements

Mechanical Integrity Quality Assurance. Lesson Objectives  Describe How to Ensure Controls in Place for QA  Describe Standard Record for Inspection.
ESS cavities interfaces
Materials to support the discussion: - Recall of TAC11 (1-2 April 2015) recommendations -HOM and PED -Possible QA applicable to SRF collaboration projects.
Needs of a European SCRF Facility - the BIG plan Lutz Lilje DESY -MPY- DESY 11/2006 Planning Resource needs.
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
D.Proch, DESY; GDE meeting Vancouver 06 Technical systems: Cavity Report Overview on costing activities for ILC –European costing method Overview industrial.
Accelerator/WP High Beta Structures Alan Wheelhouse HIGH-BETA CAVITY DELIVERY April 21, 2015.
The ESS Linear Accelerator
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
WP : HIGH-BETA CAVITY DELIVERY A Wheelhouse ASTeC, STFC Daresbury Laboratory ESS SRF Elliptical Cavities Kick-Off Meeting CEA Saclay 15 th December.
ESS WP 12 Project Management & Capabilities Overview Neil Bliss Projects & Mechanical Engineering Group Leader ESS PDR, Lund, 10 th November 2015.
HIGH-BETA CAVITY DELIVERY P McIntosh ASTeC, STFC Daresbury Laboratory ESS Technical Advisory Committee Lund 1 – 2 April 2015.
LASA Medium-β Cavity Progress Update Paolo Michelato 2 nd ESS Collaboration Meeting - SRF Elliptical Cavities 15 th December 2015.
Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015.
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
Accelerator/WP High-Beta Structures Alan Wheelhouse HIGH-BETA CAVITY DELIVERY April, 2016.
CMS Double Chooz HESS Edelweiss Herschel ALICE Detecting radiations from the Universe. EXPERIENCE WITH HARDWARE PREPARATION FOR XFEL TTC topical workshop.
Overview on DESY Infrastructure and up date/ grade Activities schedule status and plans Axel Matheisen DESY.
C.MADEC - TTC meeting E-XFEL cryomodule assembly : prototyping phase at Saclay.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
W. Singer. SRF2011, July 25 ‐ 29, 2011, Chicago, Illinois, U.S.A. XFEL Cavity Recipe for Mechanical Fabrication and Treatment Waldemar Singer/DESY.
LASA status for medium-beta cavity Paolo Michelato.
Shrikant_Pattalwar ICEC 26, March 7-11, 2016, Delhi 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
Accelerator/Technical Documentation and Breakdown Structure Dr. Felix Schlander Lead Engineer 20 April
WP : HIGH-BETA CAVITY DELIVERY A Wheelhouse ASTeC, STFC Daresbury Laboratory ESS SRF Elliptical Cavities Kick-Off Meeting CEA Saclay 23 rd June 2015.
S. Barbanotti - DESY Requirements Conformance for SRF Cryomodules Workshop 16/10/2014 – ESS, Lund XFEL cryostat main components: Quality Assurance and.
Developing the Collaboration P McIntosh STFC Daresbury Laboratory.
H-ECCTD KICK-OFF DESCRIPTION AND CHALLENGES 16/03/2016 F. PEAUGER.
Accelerator/ Medium Beta Cavities Rocco Paparella on behalf of INFN Milano – LASA ESS Team April 21st, 2016.
WP : High-Beta Cavity Delivery
H-ECCTD KICK-OFF DEVELOPMENT PLAN AND SCHEDULE 16/03/2016.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
P. Bosland CEA-Saclay Collaboration Board meeting Copenhagen 14/04/ Status of the French activities under the responsibility of CEA Philippe CHOMAZ.
Quality Plan Documentation Management & Non Conformities ESS PDR, INFN-LASA, 19 May 2016Laura Monaco, INFN LASA.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
CONFIGURATION MANAGEMENT AND CONTROL PLAN ESS Quality Assurance and Control workshop (30June) V. HENNION.
July 5th,2006John Mammosser, Jlab ILC – Electropolish Development (EP) Plans/Progress/Problems/Performance Jefferson Lab J. Mammosser, L. Phillips, C.
WP High Beta Cavities Delivery
Vertical Electro-Polishing activities at CEA Saclay
Strategy and Status of Reference Cavities for European XFEL
Status of the M-ECCTD F. Peauger - P. Bosland
Medium Beta Elliptical Cryomodule CDR Closeout
Quality assurance for Manufacturing Dressed Cavities for SPS prototype cryomodule C. Parente (HL-LHC Technical Quality Officer) Date:
Status and plans for the 3.9 GHz section of XFEL
ESS cavity procurement via in-kind contributions
High-Beta cavity STATUS at DAREsbury laboratory
ILC R&D Board Meeting: SRF Cavities Status and Plans
at STFC Daresbury laboratory
Crab Cavities Contribution from the U.S.
WP5.1 Professional training and apprenticeship (CEA, DESY, INFN)
Mark Pendleton – STFC Daresbury Laboratory
Documentation (XFEL Naming convention, uploading…)
Acceptance criteria for cleanroom infrastructure
UK RFD Pre-Series cryomodule
Horizontal Tests in a Vertical Cryostat
Highlights from EU Global Design Effort
Retreatment of Superconducting Cavities for the European XFEL
A. Bignami on behalf of LASA SRF Group
Daresbury ESS In-Kind Contributions
Cryomodule ESS FAT & SAT SRF meetinG on 07/11/2017
Overall time schedule of SRF activities
Incoming inspection of the cavities at saclay
What are they preserving?
Quality assurance and Quality control organisation
SuRf Lab: (STFC) VTF Infrastructure and Process
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Paolo Michelato LASA - Status of cavity documentation, fabrication, inspection and NCRs Laura Monaco INFN – LASA 10° ESS SRF Collaboration Meeting, 25.
Presentation transcript:

ESS High Beta Cavities Quality Assurance and Control - Learning and Planning Workshops, CEA Saclay, 30 June - 1 July 2016 Mark Pendleton STFC, Daresbury Laboratory

MD Pendleton_QA/QC_Workshop_CEA_300616 QA/QC – Plan - Lessons learnt from Collaborators - Qualifying Infrastructure - ‘Cavity Qualification’ - Data management system MD Pendleton_QA/QC_Workshop_CEA_300616

MD Pendleton_QA/QC_Workshop_CEA_300616 Lessons learnt from our Collaborators: Gaining knowledge and experience from XFEL/ CEA Saclay including proposals and feedback from the Medium Beta and High Beta prototypes XFEL - Eddie current scanning, Fabrication breakdown structure and Cleanroom training. CEA Saclay – Infrastructure (Cleanroom + HPR) and witness Medium Beta cavity testing MD Pendleton_QA/QC_Workshop_CEA_300616

MD Pendleton_QA/QC_Workshop_CEA_300616 Unique to STFC - Qualifying infrastructure: Cleanroom – required ISO standards, Procedures and Processes, Tooling, cavity re-work flow – QC steps. HPR – Confirm facility specifcation, Procedures and Processes, commissioning, QC steps. Vertical Test Facility – Commissioning, Procedures and processes – QC steps. STFC Infrastructure commissioning: High beta cavity prototypes available to STFC for infrastructure qualification - preferably 3 cavities? Dates TBC. MD Pendleton_QA/QC_Workshop_CEA_300616

MD Pendleton_QA/QC_Workshop_CEA_300616 Cavity Qualification: Ensuring the highest quality/traceability for procurement, fabrication and testing of the ESS High Beta cavities. QC steps to be determined between ESS/STFC/CEA. Nb Spec Eddy current scanning Testing Fabrication MD Pendleton_QA/QC_Workshop_CEA_300616

MD Pendleton_QA/QC_Workshop_CEA_300616 Data management: Determine the organisation of ‘External Quality Control’ Deliverables to ESS: What parameters/documentation ESS expects per cavity. Reporting structure – sign off (Inspection reports). Managing of Non Conformities (NCR) Industry – STFC – CEA – ESS Solving issues within an agreed timescale (fast Response) Final release of the cavity Acceptance tests Courtesy of INFN MD Pendleton_QA/QC_Workshop_CEA_300616

MD Pendleton_QA/QC_Workshop_CEA_300616 Acceptance levels with ESS and Collaborators Example from INFN: Level Cavity status Needed documents If Level reached One “Naked” cavity after mechanical fabrication Mechanical, RF, vacuum, visual documents Proceed to Level Two Two Cavity before He-tank integration Mechanical, RF, vacuum, Treatment documents & tank documents Proceed to Level Three Three Accessory assembly, last surface treatments, outer inspection document Treatment, vacuum, RF, transfer measurements documents Integrated cavity ready to be cold RF tested Four Cavity cold tested Documents relative to cold test results and in/out checks Cavity can be sent to CEA for string assembly Five Cavity accepted for string assembly Documents with incoming inspection at CEA Cavity final approval ESS to confirm Acceptance criteria at each major process operation MD Pendleton_QA/QC_Workshop_CEA_300616 Courtesy of INFN

MD Pendleton_QA/QC_Workshop_CEA_300616 Current status of QA System: Currently working with ESS and collaborators to determine parameters and data transfer system EDMS: ruled out (Cost + time) Word based docs (Fermilab) Alfresco: Planned to liaise with INFN MD Pendleton_QA/QC_Workshop_CEA_300616